Park West CC(1)-LR 950627
reed engineering GEOTECHNICAL CONSULTANTS June 27, 1995 Project No. 2166.2 Report No. 5 Marc Myers Company 3811 Turtle Creek Boulevard, Suite 1020 Da%las, Texas 75219 ATTN: Mr. Richard Crow Re: Construction Materials Testing Park West Commerce Center Airline Drive and Executive Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities for the period of June 14 through 20, 1995. During the referenced period, a total of 45 field density tests were taken on the "select" fill placed within the building pad and on storm sewer backfill. Test results are shown on Plates 1 and 2. Where tested, materials were found to be in compliance with project specifications. Construction of piers was initiated on June 14, 1995. Pier construction was observed and the piers were found to be in compliance with project plans and specifications. Pier designations and depths are shown on plates 3 through 5. Samples of the pier concrete were obtained on a daily basis. Compressive strength test results will be submitted under separate cover. 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 Marc Myers Company Project No. 2166.2/Report No. 5 June 27, 1995 Page 2 Additional reports will be submitted as the work progresses. have any questions, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. MDS/RFR/msm copies submitted: INC. (1) Marc Myers Company/Mr. Richard Crow ~1) McFadden & Miller/Mr. Dave VanDemeer (1) Comerica Bank/Mr. Alan Williams If you · ,. --- reed engineerin, g PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 5 Date 06-14-95 06-15-95 06-16-95 06-17-95 Test No. 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 Field Density Tests Location Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 290'S,220'W(1) 0 380'S,220'W(1) 0 290'S, 170'W(1) 0 380'S, 170'W(1) 0 290'S, 100'W(1) 0 290'S, 30'W(1) 0 380'S, 30'W(1) 0 380' S, 100'W(1) 0 Line A/STA 0+50 1 Line A/STA 1+10 2 Line A/STA 2+20 3 420'S,220'W(1) 0 420'S,175'W(1) 0 420' S, 100'W(1) 0 420'S, 30'W(1) 0 Line A/STA 2+25 3 550'S,210'W(1) 0 550' s, 17o'w(1) o 550' S, 120'W(1) 0 550' S, 60'W(1) 0 Line A/STA 3+85 2 395'N,265'E(2) 0 395'N,225'E(2) 0 620' S, 40'W(1) 0. 620'S, 100'W(1) 0 620'S, 175'W(1) 0 620' S, 220'W(1) 0 700'S, 80'W(1) 0 700'S, 125'W(1) 0 700'S,200'W(1) 0 700'S,240'W(1) 0 780' S, 220'W(1) 0. 780' S, 175'W(1) 0. 780'S, 100'W(1) 0. 780' S, 40'W(1) 0. 0 116 9 0 119 0 0 115 5 0 115 9 0 115 5 0 117 4 0 117 0 0 117 2 0 89 1 0 92 5 0 92 7 0 115 7 0 120 6 0 117 7 0 118 5 0 89 8 0 116 8 0 118.7 0 119.3 0 116.5 5 96.9 7 115.8 7 116.3 7 115.8 7 115.5 7 115.6 7 115.7 7 115 9 7 118 8 7 117 9 7 118 2 7 121 6 7 118 5 7 118 2 7 118 5 Moisture Content Curve (%) No. 11 6 10 3 12 2 10 5 13 6 11 9 11 6 10 8 27 7 28 8 28 8 11 9 10 8 10 5 11 0 29 2 10 4 10 7 9 4 10 5 24.0 13.5 12.8 11.0 13.1 13.1 12.4 9.4 9.0 8.6 9.7 8.6 8.6 8.7 9.7 6 6 6 6 6 6 6 6 2 1 1 6 6 6 6 2 6 6 6 6 1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 Com- pac- tion Level (%) 96 1 97 9 95 0 95 3 95 0 96 5 96 2 96 4 99 2 95 5 95 7 95 1 99.2 96.8 97.5 100.0 96.1 97.6 98.1 95.8 100.0 95.2 95.6 95.2 95.0 95.1 95.1 95.3 97.7 97 0 97 2 100 0 97 5 97 2 97 5 GE~ECHNICAL CONSULTAN~ PLATE 1 reed en. gin~erin, g Test Date No. 06-17-95 189 190 06-19-95 191 192 193 194 195 196 197 198 Footnotes: PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 5 Field Density Tests (Continued) Location Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (pcf) (%) No. (%) Line A/STA 7+00 Line A/STA 5+50 Line A/STA 8+60 275'N, 25'W(3) 275'N, 100'W(3) 275'N, 165'W(3) 275'N, 210'W(3) Line A/STA 11+35 1 Line A/STA 10+00 1 Line A/STA 9+00 1 2 0 2 0 2 0 0 7 0 7 0 7 0 7 0 0 0 95 2 95 9 88 0 117 0 118 5 118 2 117 3 92 7 92 2 92 1 23.4 1 24.7 1 29.8 2 11.7 6 10.3 6 9.8 6 11.7 6 27.3 1 26.9 2 25.0 1 98 2 99 0 98 0 96 2 97 5 97 2 96 5 95 7 95 1 95 0 (1) (2) (3) Measurements referenced from N.E. corner of proposed building. Measurements referenced from S.W. corner of proposed building. Measurements referenced from S.E. corner of proposed building. GEOTECHNICAL CONSULTAN~ · PLATE 2 · ' , · -- reed engineerin~g PARK WEST COHMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 5 Pier Suaunary Depth Final Pier Bell Before Pier Pier Diameter Size Bell Depth No. (in.) (in.) (ft.) (ft.) Date 06-14-95 D-29 24 48 C-29 24 48 B-29 24 48 F-25 24 48 E-25 24 48 06-15-95 D-25 20 48 C-25 20 48 B-25 20 48 B-26 20 48 C-26 20 48 D-26 20 48 E-26 20 48 F-26 20 48 F-27 20 48 E-27 20 48 D-27 20 48 C-27 20 48 B-27 20 48 B-28 20 48 C-28 20 48 E-28 24 72 F-28 24 72 F-29 24 72 E-29 24 72 F-23 20 48 E-23 20 48 D-23 20 48 C-23 20 48 B-23 20 48 06-16-95 B-22 20 48 C-22 20 48 D-22 20 48 E-22 20 48 F-22 20 48 F-21 20 48 E-21 20 48 19 1 21 8 19 8 16 0 13 5 16 0 14 0 16.1 17.3 16.4 16.9 17.0 16.9 16.7 18.0 17.1 15.6 16.7 16.6 16 2 17 6 17 2 16 4 16 2 16 7 15 3 16,3 14.7 15.5 16.3 16.2 14.8 14.6 12.4 14.9 15.1 19 5 21 8 19 8 16 0 13 5 16 1 14 0 16 2 17 4 16 4 17 0 17 0 16 9 16 8 18 0 17 0 15 6 16 7 16 5 16.2 17 8 17 1 16 6 16 5 15 6 16.3 14 7 15 7 16 8 16 2 14 8 14 8 12 5 15 0 15 1 GEOTECHNICAL CONSULTANTS PLATE 3 reed en. gineerin, g PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 5 Date 06-16-95 06-19-95 Pier Summary (Continued) Depth Final Pier Bell Before Pier Pier Diameter Size Bell Depth No. (in.) (in.) (ft.) (ft.) D-21 20 C-21 20 B-21 20 B-20 20 C-20 20 D-20 20 E-20 20 F-20 20 F-19 20 E-19 20 D-19 20 C-19 20 B-19 20 B-17 20 C-17 20 D-17 20 E-17 20 F-17 20 F-16 20 E-16 20 D-16 20 C-16 20 B-16 20 F-24 24 E-24 24 D-24 24 C-24 24 B-24 24 F-18 24 E-18 24 D-18 24 C-18 24 B-18 24 F.8-28.5 16 F.8-29.3 16 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 6O 6O 6O 6O 6O 6O 60 60 6O 6o 36 36 14 6 15 2 15 5 15 1 15 3 15 3 15 2 15 5 15 1 14 8 15.3 15.0 15.6 15.7 14.7 15.0 15.1 15.2 14.9 14.7 15.1 15.0 15.3 15.2 15.6 14 8 16 0 15 6 16 0 15 2 15 9 15 5 15 1 15 7 15 5 14 6 15 3 15 5 15 3 15 2 15 4 15.1 15.6 15 1 15 2 15 4 15 0 15 6 15 6 14 9 15 0 15 2 15 2 14 9 14 7 15 1 15 1 15 3 15.5 15.5 15 1 16 2 15 6 16 0 15 3 16 0 16 0 15 8 15 8 15 6 GEOTECHNICAL CONSULTANTS PLATE 4 reed engineerin, g PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 5 Date 06-19-95 06-20-95 Pier Summary ( Con t inued) Depth Final Pier Bell Before Pier Pier Diameter Size Bell Depth No. (in.) (in.) (ft.) (ft.) F.8-29.8 16 36 F.4-29.8 16 36 E.5-29.8 16 36 E-15 20 48 D-15 20 48 C-15 20 48 B-15 20 48 F-15 20 48 B-14 20 48 C-14 20 48 D-14 20 48 E-14 20 48 F-14 20 48 F-12 20 48 E-12 20 48 D-12 20 48 C-12 20 48 B-12 20 48 B-ii 20 48 C-II 20 48 D-ii 20 48 E-II 20 48 F-II 20 48 F-13 24 60 E-13 24 60 D-13 24 60 C-13 24 60 15.7 15.6 16.5 15.7 15.2 16.0 15.9 15.2 13.7 15.2 15.3 15.6 15.5 15.9 15.7 15.4 15.3 15 3 16 2 16 3 15 9 15 6 15 5 15 8 15 6 14 2 14.0 16 0 16 0 16 8 16 1 15 8 16 8 16 1 15 1 13 8 15 2 15 3 16 0 15 9 16 0 16 0 15 5 15 3 15 5 16 8 16 2 15 8 15 9 15.4 15.7 16.0 14.2 14.0 Note: Ail pier depths measured from existing grades. GEOTECHNICAL CONSULTANTS PLATE 5