Loading...
Park West CC(7)-LR 981116CONCRETE COMPR SIVE STRENGTH ENGINEERING, [NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/15/1998 Client No.: 71765000 Report No.: 9828117 Project No.: 43-2170-98 Report Date 11/16/1998 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/15/1998 BATCH T~ME: I l:32am TIME SAMPLED: 12:35pm BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 512 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sunny and dry 76 F CONCRETE: 86 F TICKET NO: 77687 UNIT WEIGHT (pcO: N/A Piers J.4/I, L/I, K.4/I, 1.8/1, K.3/1.6 through B.2/1 SAMPLE LOCATION: Pier H.6/l CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I 1 5.75 REPORT OF TESTS DATE TESTED ACCUMULATIVE YARDS: 30 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 10/22/1998 7 78440 2770 FRACTURE TYPE 1 2 5.75 I 3 5.75 Technician Time: See 11/12/1998 11/12/1998 Report #9828116 28 106490 3770 28 98380 3480 Average 3630 Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, inc. (1) Alliance Architects. Inc. ( 1 ) Hal fl' Associates ( I ) Mullen & Powell Technistructures, I Started: (I) Butler Construction (I) City of Coppell (1) City of Coppell Finished: ~ Engin~ Eugene Harbour Vice President This report is exclusively lbr the use of the client indicated above and shall uot be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page I of 1 CONCRETE Date of Service: Client No.: Client: Services: COMPRr SIVE STRENGTH ENGINF. F_aRI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 10/15/1998 71765000 Report No.: 9828101 Project No.: 43-2170-98 Report Date 11/16/1998 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTIt: SLUMP: AIR: TEST M ETItOD: CONTRACTOR: Butler Construction CONCRETE SUI'PLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi (~ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 4:05am WEATHER CONDITIONS: TEMPERATURE (F) - AIR 69 TRUCK NO: 829 AIR CONTENT (%}: 4 PLACEMENT LOCATION: 9349 10/15/1998 ~ATCH TreE: 3:30am BY: Joe Moore Cloudy and cool F CONCRETE: 80 F TICKET NO: 58325 UNIT WEIGltT {pcf}: N/A Floor slab, norht half of building, line 1 to 10 and line F to A SAMPLE LOCATION: 20' E of W/30' S of N REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP I)ATE AGE LOAD STRENGTH SET NO. (inches) TESTEI) (days) (lbs. force) (psi) 1 I 5.00 10/22/1998 7 97580 3450 FRACTURE TYPE 1 2 5.00 11/12/1998 28 121940 4310 I 3 5.00 11/12/1998 28 118450 4190 Average 4250 I 4 5.00 12/10/1998 56 This report is exclusively ~br the use of the client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc. 01SS Page I of 7 CONCRETE COMPRY",SIVE STRENGTH Date of Service: 10/15/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/16/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANI': 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 1 0/1 5/1 998 BATCH TIME: 4:00am TIME SAMPLED: 4:45am BY: Joe Moore WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 1 882 ,,*,IR CONTENT (%): 5 PLACEMENT LOCATION: See page 1 Cloudy alld cool 72 F CONCRETE: 83 g TICKET NO: 77599 [INIT WEIGHT (pcf): N/A SAMPLE LOCATION: 70' E of W/60' S of N REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP I)ATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 5.50 10/22/t998 7 111510 3940 120 FRACTURE TYPE 2 2 5.50 11/12/1998 28 146180 5170 2 3 5.50 11/12/1998 28 133150 4710 Average 4940 2 4 5.50 12/10/1998 56 OISS This report is exclusively tbr thc usc of the client indicated abovc and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 7 ,CONCRETE COMPResSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/15/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 11/16/1998 Services: Obtain samples of fresh concrete at the placelnent locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPEC'IFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 6:15am W EATH ER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 193 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: See page I 9349 10/15/1998 BATCH TIME: 5:44am BY: Joe Moore Cloudy and cool 73 ~ CONCRETE: 80 ~ TICKET NO: I 14035 UNIT WEIGHT (peri: N/A SAMPLE LOCATION: 200' E of W/40' N of S REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days} (lbs. force) 3 I 5.00 10/22/1998 7 124140 ACCUMULATIVE YARDS: 230 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4390 3 2 5.00 11/12/1998 28 139870 4950 3 3 5.00 11/12/1998 28 129500 4580 Average 4770 3 4 5.00 12/10/1998 56 This report is exclusively tbr lhe usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 3 of 7 ,CONCRETE COMPRF' ,SIVE STRENGTH Date of Service: 10/15/1998 Report No.: 9828101 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas ENGINEERING, 1NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/16/1998 Services: Obtain samples offl'esh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer I'LANT: 22 SPECllqCAIION REQUIREMENTS STRENGTlt: 4000 psi @ 28 Days 3-5" 2-5% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 230' E of W/90' S of N PROJECT DATA (:ONCRETE CLASS: I'LACEMENT DATE: TIME SAMPLED: 7:15am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 829 AIR CONTENT (%): 3.75 PLACEMENT LOCATION: See page I 9349 10/15/1998 BATCH TIME: 6:25am BY: Joe Moore Cloudy and cool 74 F CONCRETE: 83 F TICKET NO: 77622 UNIT WEIGHT {pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 330 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches} TESTED (days) (lbs. force) (psi) TYPE 4 1 5.50 10/22/1998 7 103300 3650 4 2 5.50 11/12/1998 28 123260 4360 4 3 5.50 11/12/1998 28 118730 4200 Average 4280 4 4 5.50 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in lull without the writteu approval of HBC Engineering, inc. 01SS Page 4 of 7 CONCRETE COMPRF"SIVE Date of Service: 10/15/1998 Client No.: 71765000 Client: Prentiss Properties Limited, I ilo. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 STRENGTH Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas ENGINF_ERIlqG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/16/1998 Services: Obtain samples offi'esh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 300' E of W/60' S of N PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 8:00am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1824 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) {lbs. force) 9349 10/15/1998 BATCH TIME: 7:20am BY: Joe Moore Cloudy and cool 74 F CONCRETE: 83 F TICKET NO: 77633 [INIT WEIGHT (pcl): N/A 5 I 6.00 10/22/1998 7 108200 5 2 6.00 11/12/1998 28 143540 5 3 6.00 11/12/1998 28 135410 Average 5 4 6.00 12/10/1998 56 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3830 5O8O 4790 4940 420 FRACTURE TYPE 01SS This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 5 of 7 .CONCRETE COMPR SIVE STRENGTH ENGINEF_RII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 10/15/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Nol~rhwest Hwy. Dallas TX 75220 Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 11/16/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACq'OR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:00am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 936 AIR CONTENT (%): 4 PLACEMENT LOCATION: See page I 9349 10/15/1998 BATCIt TIME: 8:06am BY: Joe Moore Cloudy and cool 74 F CONCRETE: 84 F TICKET NO: 77645 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: 60' E ofW/100'N orS REPORT OF TESTS ACCUMULATIVE YARDS: 530 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED {days) (lbs. force) (psi) 6 I 5.00 10/22/1998 7 101460 3590 FRACTURE TYPE 6 2 5.00 11/12/1998 28 128320 4540 6 3 5.00 11/12/1998 28 124110 4390 Average 4470 6 4 5.00 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 6 of 7 CONCRETE COMPRY"'SIVE Date of Service: 10/15/1998 Client No.: 71765000 Client: Prentiss Propel~ies Limited, Inc. A~tn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 STRENGTH Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas ENGINEERIlq3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/16/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTIt: SLUMP: AIR: TEST METltOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 3-5" 2-5% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 20' N of S/70' E of W CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 7 1 6.00 7 2 6.00 7 3 6.00 7 4 6.00 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 10/15/1998 BATCH TIME: 10:07am TIME SAMPLED: 1 l:00am BY: Joe Moore WEATHER CONDITIONS: TEMPERATURE (F) - AIR 'raUCK NO: 1805 AIR CONTENT (%): 4 PLACEMENT LOCATION: See page I REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) Cloudy and cool 75 F CONCRETE: 86 F TICKET NO: 77663 UNIT WEIGHT (per): N/A 10/22/1998 7 99620 11/12/1998 28 130050 11/12/1998 28 129190 Average 12/10/1998 56 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3520 4600 4570 4590 680 FRACTURE TYPE Technician: Joe Moore Report Distribution: (I) Prentiss Properties Limited. Inc. (1) Alliance Architects, Inc. ( I ) Halff Associates (I) Mullen & Powell Technistructures, I Started: 4:00am Finished: l:00pm ( I ) Butler Construction (1) City of Coppell (I) City of Coppcll Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 7 of 7