Loading...
Park West CC(7)-LR 981113CONCRETE COMPRi, SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texaa 75247 Date of Service: Client No.: 10/14/1998 71765000 Report No.: 9828024 Project No.: 43-2170-98 Report Date 11/13/1998 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of' f'resh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/14/1998 BATCHTIME: 10:00am 'riME SAMPLED: 10:40am BY: Mike Shields WEATHER CONDITIONS: Sunny and dry TEMPERATURE (F)-AIR 76 F CONCRETE: 81 F TRUCK NO: 852 TICKET NO: 77528 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Piers H.2/7, H.2/7.6, H.2/8.5, H.2/9.5 through L/2.2 SAMPLE LOCATION: Pier H.2/7.6 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 6.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 10/21/1998 7 86390 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3050 1 2 6.00 1 3 6.00 Technician Time: See 11/11/1998 28 105290 11/11/1998 28 103570 Average Report %9828023 3720 3660 3690 Technician: Mike Shields Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects. Inc. ( I ) HalIT Associates (l) Mullen & Powell Technistructures, I Started: (I) Butler Construction ( 1 ) City of Coppell (1) City of Coppell Finished: ~ En~c. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page I of I CONCRETE COMPRL SIVE STRENGTH Date of Service: Client No.: 11/04/1998 71765000 Report No.: 9829989 Project No.: 43-2170-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/13/1998 Client: Prentiss Properties Limited, Inc. Project: Attn: DavidGlass 3860 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3500 psi ~ 28 Days TEMPERATURE {F) - AIR 50 Ih' CONCRETE: 67 F SLUMP: 5.0" Max TRUCKNO: 842 TICKETNO: 088971 AIR: N/A AIR CONTENT (%): N/A [INIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Panels 17-53 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 28 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 11/04/1998 BATCH TIME: 5:00am TIME SAMPLED: 5:40am aY: Eddie Elrod REPORT OF TESTS ACCUMULATIVE YARDS: 160 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.50 11/11/1998 7 94490 3340 1 2 6.50 I 1/11/1998 7 90680 3210 Average 3280 1 3 6.50 12/02/1998 28 i 4 6.50 12/02/1998 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 4 CONCRETE COMPLY, oSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/04/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9829989 43-2170-98 Lakeview Center Coppell, Texas Report Date 11/13/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 6:45am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 5 18 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I 9337 11/04/1998 BATCH TIME: 5:46am BY: Eddie Elrod Cloudy 53 F CONCRETE: 70 v TIC~<ET NO: 088977 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: Panel 41 REPORT OF TESTS ACCUMULATIVE YARDS: 220 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.75 1 I/11/1998 7 92880 3280 2 2 5.75 11/11/1998 7 95550 3380 Average 3330 2 3 5.75 12/02/1998 28 2 4 5.75 12/02/I 998 28 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Enginec4~nc. Page 2 of 4 ,CONCRETE COMPR SIVE Date of Service: 11/04/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. At-tn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 STRENGTH 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report No.: 9829989 Project No.: 43-2170-98 Report Date 11/13/1998 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 11/04/1998 i}ATCH TIME: N/A TIME SAMPLED: 8:40am BY: Eddie Elrod WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 855 AIR CONTENT (%): N/A PLACEMENT LOCATION: See apge I Cloudy 52 F CONCRETE: 67 F TICKETNO: 088987 [INIT WEIGHT(pc0: N/A SAMPLE LOCATION: Panel 49 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) REPORT OF TESTS ACCUMULATIVE YARDS: 320 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (lbs. force) (psi) TYPE 3 I 6.50 11/11/1998 7 76090 2690 3 2 6.50 11/11/1998 7 75200 2660 Average 2680 3 3 6.50 12/02/1998 28 3 4 6.50 12/02/1998 28 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval ofHBC Engineering,'~ii~c. Page 3 of 4 .CONCRETE COMPR?' SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/04/1998 Client No.: 71765000 Report No.: 9829989 Project No.: 43-2170-98 Report Date 11/13/1998 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Obtain smnples of fi'esh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:30am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 771 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I 9337 11/04/1998 BATCH TIME: 8.' 15am BY: Eddie Elrod Cloudy 53 F CONCRETE: 68 F TICKET NO: 088995 [INIT WEIGHT (pc0: N/A SAMPLE LOCATION: Panel 21 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 ' 5.25 4 2 5.25 4 3 5.25 4 4 5.25 DATE TESTED 11/11/1998 11/11/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 410 MAXIMUM COMPRESSIVE AG E LOAD STRENGTH (days) (lbs. force) (psi) 7 88530 3130 7 86790 3070 Average 3100 12/02/1998 12/02/1998 28 FRACTURE TYPE Technician: Eddie Elrod Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (I) Halff Associates (I) Mullen & Powell/echnistructures, I Started: 4:00am (1) Butler Construction (1) City of Coppell (I) City of Coppe[l Finished: 2:00pm m~ Eng~ Eugene H'arbour Vice President This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4