Park West CC(7)-LR 981111CONCRETE COMPR f" SIVE Date of Service: Client No.: Client: 10/13/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9827881 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 11/11/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/13/1998 BATCH TIME: 9:3 lam TIME SAMPLED: 10:lSam BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRVCK NO: 756 AIR CONTENT (%}: N/A PLACEMENT LOCATION: Piers-G/2, H/2, G/3, H/3, !/3, !.8/3, I/3.6. Sunny/Dry 72 F CONCRETE: 82 F TICKETNO: 76910 [INIT WEIGHT (pc0: N/A SAMPLE LOCATION: Pier- G/2 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 6.0 DATE TESTED 10/20/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 102770 3630 I 2 6.0 1 3 6.0 I 1/10/1998 I 1/10/1998 28 137430 4860 28 135130 4780 Average 4820 Technician time: See Technician: Mike Shields Report Distribution: (I) Prentiss Properties Limited, Inc. ( I ) Alliance Architects, Inc. (I) Halff Associates (I) Mullen & Powell Technistmctures, I Report ~9827881 Started: Finished: (I) Butler Construction (1) City of Coppell (I) City of Coppell ~ En~Inc. Eugene Harbour Vice President 10 FRACTURE TYPE This report is exclusively for the use o£the client iudicated above cud shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPR . SIVE STRENGTH Date of Service: 10/12/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9827275 43-2170-98 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/11/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/12/1998 BATCt~ TIME: 12:05pm T~ME SAMPLE[~: 1' 10pm m': Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) -AlR TRUCK NO: 5 1 2 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sunny and Dry 84 F CONCRETE: 86 F TICKETNO: 767925 UNITWEIGHT(pcO: N/A Piers- C/9, C/8, C/7, C/6, C/5, F/2 SAMPLE LOCATION: Pier-C/8 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I I 5.75 DATE TESTED 10/19/1998 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 94950 3360 10 FRACTURE TYPE ! 2 5.75 ! 3 5.75 Technician Time: 1/09/1998 1/09/1998 See Report #9827274. 28 114760 4060 28 105090 3720 Average 3890 Technician: Mike Shields Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (I) Halff Associates (I) Mullen & Powell Technistructures, ! Started: Finished: (I) Butler Coustruction ( I ) City of Coppell ( 1 ) City of Coppell Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page I of I