Loading...
Park West CC(7)-LR 981109CONCRETE COMPR SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/09/1998 Report No.: 9827091 Client No.: 71765000 Project No.: 43-2170-98 Report Date 11/09/1998 Client: Prentiss Properties Limited, Inc. Project: Lakeview Center Attn: David Glass Coppell, Texas 3860 W. Northwest Hwy. Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/09/1998 BATCH TIME: 10:30am TIME SAMPLED: ll:50am BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (17) - AIR TRUCK NO: 515 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sunny and Dry 74 F CONCRETE: 84 F TICKET NO: 76654 UNIT WEIGHT (pc0: N/A Piers-I/9, J/9, K/9, K/8, K/7 and g, J6 SAMPLE LOCATION: Pier 1/9 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 5.75 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 10/16/1998 7 96590 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 3420 FRACTURE TYPE 1 2 5.75 I 3 5.75 Technician Time: See Report 11/06/1998 28 120280 11/06/1998 28 114780 Average %9827090. 4250 4060 4160 Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (I) Halff Associates (I) Mullen & Powell Tecbnistructures, I Started: Finished: (1) Butler Construction (I) City of Coppell (1) City of Coppell I'"I~ En ' Eugen, e~ll~woour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page I of 1