Loading...
Park West CC(1)-LR 950724REPORT NO.: PROJECT: LOCATION: reed engineering GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT 8 2166.2 JOB NO.: DATE CAST: Park West Commerce Center SPECIFICATION: Floor slab - 45'S, 45'E of NW building c o rne r QUANTITY REPRESENTED: 06/26/95 3000 PSI 40/440 yds ARCHITECT/ENGINEER: McFadden & Miller CONTRACTOR: Marc Myers REPORTED TO: DATE: SAMPLED BY: BY ORDER ~: 07/24/95 07/03/95 OR~R NUMBER: R. Thompson Client (6 x 12 INCH) NOMINAL CYUNDER SIZE: AREA-28.26 SQ. IN, FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH, PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: PC062601 78,000 7 2760 Does comply with LABORATORY NUMBER PC062602 110,000 28 3890 PC062603 109,000 28 3860 Specification 3880 METHOD OF CURING: TEMPERATURE: TIME OF SAMPLE: ~OURCE OF CONCRETE: FIELD 1 AMBIENT 7 8 06:30 TXI FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): DAYS, LABORATORY FROM 'F M,X 82 06/27/95 CF, AIR CONTENT M,X CODE: 3 9 TRANSPORTED BY Reed e/e. SLUMP 5 · 5 0 INCHES PICK-UP CHARGE: YI~ NO TICKET NO.: 406982 UNIT WEIGHT PCF YIELD CF,ICY D,S~,BU~ON: (1) Marc Myers Company/Mr. Richard Crow J/_.. (1) McFadden & Miller Construction/Mr. Dave VanDE (1) Comerica Bank/Mr. Alan Williams SIGNED I 2 TEST METHODS: AS'lid C31, C39, C 143, C 173. C 192. C 231. OR C 1064 PAOF ~ 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 8 2166.2 REPORT NO.: QB NO.: Park West Commerce Center PROJECT: Floor slab - 220'S, 60'E of NW LOCA~N: building corner reed engineering GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT DATE CAST: SPECIFICATION: QUANTITY REPRESENTED: 06/26/95 3000 PSI 210/440 yds ARCHITECT/ENGINEER: McFadden & Miller CONTRACTOR: Marc Myers REPORTED TO: DATE: 07/24/95 07/03/95 SAMPLED BY: B. Lucas BY ORDER OF: C1 lent ORDER NUMBER: (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA-28.26 SQ. IN. LABORATORY NUMBER FIELD NUMBER: [~C062604 PC062605 94,000 121,000 7 28 3320 4280 MAXIMUM LOAD, LBS: AGE WHEN TESTED. DAYS: COMPRESSIVE STRENGTH, PSt: AVERAGE STRENGTH, PSt: PC062606 118,000 28 4170 ~PE BREAK: CONICAL (U.N.O.) REMANKS: Does comply with Specification 4230 METHOD OF CURING: FIELD 1 DAYS, LABORATORY FROM 06 / 27 / 95 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 80 M,X 87 'F. AIR CONTENT ~, SLUMP 6. 5 0 INCHES PICK-UP CHARGE: Y~ NO TIME OF SAMPLE: 09: 50 ^,.vD. ~OURCE OF CONCRETE: TXI M,XCODE: 39 TICKET NO.: 407187 FINE AGGREGATE: COARSE AOGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): UNIT WEIGHT PCF YIELD CF/CY asm,au~: (1) Marc Myers Company/Mr. Richard Crow (1) McFadden & Miller Construction/Mr. Dave VanDemee'. (1) Comerica Bank/Mr. Alan Williams SIGNED TEST METHODS: ASTM C31. 039. C 143. C173. C192. C231. OR0 1064 2 2 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019