Loading...
Park West CC(7)-LR 981103CONCRETE COMPRE SIVE STRENGTH Date of Service: 10/26/1998 Report 1~o.: 9829078 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 11/03/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: COWr~CTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 5-7" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/26/1998 BATCH TIME: 10:15am' T~ME SAMPLED: 10:45am BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1883 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sunny & clear 77 ~ CONCRETE: 80 F TICKET NO: 83274 UNIT WEIGHT (pcf): N/A Piers- D/7.4, D/6.5, D/5.6, D/4.8, D/4, G.3/4 SAMPLE LOCATION: Pier D/6.5 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) I 1 5.75 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 11/02/1998 7 81050 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2870 1 2 5.75 1 3 5.75 11/23/1998 28 11/23/1998 28 Technician time: See Report #9829077 Technician: Mike Shields Report Distribution: (I) Prcntiss Properties Limited, Inc. (1) Alliance Architects, Inc. (I) Halff Associates (i) Mullcn & Powcll Technistmcturcs, I Started: (I) Butler Construction (1) City of Coppell (I) City of Coppcll Finished: ~ Eng~ Eugene ~aroour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt%n approval of HBC Engineering, Inc. 0iLL Page I of I