Loading...
Park West CC(7)-LR 981102,REPORT OF DRILLEb PIER INSPECTION 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/26/1998 Report No.: 9829077 Report Date 11/02/1998 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Atto: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Drilled pier inspection. On this date, an HBC jobsite as scheduled recorded data. Engineering technician arrived at for drilled pier inspection. See the above referenced attached sheet for Technician Time: 6:30 am to 4:00 pm Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I (1) Butler Construction (1) City of Coppell (I) City of Coppell I--I~~, Inc. Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99TMP Page 1 of 1