Loading...
Park West CC(7)-LR 981029IN-PLACE DENSITY STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 10/13/1998 Report No.: 9828343 Report Date 10/29/1998 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Attn: DavidGlass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. 1 2 Description Lt bm tan sa clay w/limestone Red bm cl sa w/cl balls/grvl Mglxilxlnm Moisture % Density pcf 20.5 99.8 11.5 123.5 FIELD DENSITY TESTS Project Requirements Moisture Density +4% or above 92% -2/+2% 95% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pcf) (% max) 4" Sanitary Sewer 434 at grid 3.7-C.4 435 at grid 3.7-C.6 436 at grid 3.7-C.7 437 at grid 3.7-D.5 438 at grid 3.7-D.7, 439 at grid 3.7-D.9 440 at grid 3.7-E.6 441 at grid 3.7-E.8 442 at grid 3.7-F.0 1st Lift 2nd Lift 3rd Lift 1st Lift 2nd Lift 3rd Lift 1st Lift 2nd Lift 3rd Lift Technician: Tex King Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Teclmistructures, 1 1 24.9 92.1 92 2 11.9 118.7 96 2 11.6 118.4 96 I 24.7 92.0 92 2 11.7 118.9 96 2 11.5 118.7 96 1 24.9 92.2 92 2 11.7 118.7 96 2 11.3 119.1 96 Test results on this report meet project specification. (1) Butler Construction (1) City of Coppell (1) City of Coppell H~ Engi~ Eugene Harbour Vice President This report is exclusively for ltze use of the client indicated above.and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 1 .'TN-PLACE DENSITY 2 ;STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/12/1998 Report No.: 9828338 Report Date 10/29/1998 Client No.: 71765000 Project No,: 43-2170-98 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: AST1V[ D-698 Field Test Method: MOISTURE DENSITY RELATIONS: MfD No. Description ASTM D-2922 ASTM D-3017 1 2 Lt bm tan sa clay w/limestone Reddish brown clayey sand w/clay balls and gravel Maximum Project Requirements Moisture % Density pef Moisture Density 20.5 99.5 +4% or above 92% 11.5 123.5 -2/+2% 95% TEST NO FIELD DENSITY TESTS M/l) MOISTURE DRY DENSITY DENSITY TEST LOCATION No. (%) (pcf) (% max) 1 25.1 92.1 93 2nd Lift 2 12.5 119.7 97 3rd Lift 2 12.1 119.9 97 1st Lift 1 25.4 92.3 93 2nd Lift 2 12.3 119.5 97 3rd Lift 2 11.9 119.8 97 1 st Lift 1 25.2 91.9 92 2nd Lift 2 12.4 119.4 97 3rd Lift 2 12.0 119.7 97 1st Lift 1 24.9 91.8 92 4" Sanitary Sewer 422 at Grid C.4-4.0, 1 st Lift 423 at Grid C.4-3.8, 424 at Grid C.4-3.6, 425 at Grid C.4-5.1. 426 at Grid C.4-5.3, 427 at Grid C.4-5.5 428 at Grid C.4-7.0 429 at Grid C.4-7.3 430 at Grid C.4-7.6 431 at Grid C.4-8.5 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2 ?Report No.: 9828338 TEST NO 432 433 MID MOISTURE TEST LOCATION No. (%) DRY DENSITY (PC0 at Grid C.4-8.7, 2nd Lift at Grid C.4-9.1, 3rd Lift 2 12.6 2 12.4 Test results on this report meet project specification. 119.7 120.0 DENSITY (% max) 97 97 Technician: Tex King Report Distribution: (I) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. ( 1 ) Halff Associates (1) Mullen & Powell Technistructures, I H~ Engineering, Inc. (1) Butler Construction ~'~ (1) City of Coppell Eu~"~e Harbour (1) City of Coppell Vice President This report is exclusively for the use of the client indicated above an~ shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2 IN-PLACE DENSITY 'ESTING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 10/14/1998 71765000 Prentiss Properties Limited, Inc. Attn: DavidGlass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9828350 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 10/29/1998 Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Moisture % Maximum Density pcf Project Requirements Moisture Density Reddish brown clayey sand w/clay balls and gravel 11.5 123.5 FIELD DENSITY TESTS -2/+2% 95% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) Recheck prior to concrete Placement at grid B. 1 - 9.0 443 444 Placement at grid 445 Placement at grid 446 Placement at grid 447 Placement at grid 448 Placement at grid 449 Placement at grid 450 Placement at grid 451 Placement at grid 452 Placement at grid B.1 - 6.5 B.1 - 4.0 B.1 -2.1 C.5- 1.9 C.5 - 4.0 C.5 - 7.0 C.5 -9.0 2.3 - D.5 2.3 - G.5 Technician: Tex King Report Distribution: (I) Prentiss Properties Limited, Inc. (l) Alliance Architects, Inc. (i) HalffAssociates (1) Mullen & Powell Technistructures, ! 1 12.1 118.9 96 1 12.2 119.2 97 1 11.9 119.8 97 1 12.0 119.4 97 1 11.7 119.7 97 I 11.9 119.4 97 1 11.8 118.9 96 1 12.0 119.:2 97 1 12.3 119.7 97 I 12.1 119.5 97 Test results on this report meet project specification. (1) Butler Construction . (1) City of Coppell (I) City of Coppell ~ E~ing, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07DG Page 1 of 1