Park West CC(7)-LR 981023CONCRETE COMP IVE STRENGTH Date of Service: 10/15/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9828117 43-2170-98 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 3000 psi @ 28 Days 5-7" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier H.6/1 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/15/1998 aATCU T:M~: 11:32am TnVm SAMPLED: 12:35pm aY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRt~CK NO: 512 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sunny and dry 76 F CONCRE~I~: 86 F TICKET NO: 77687 UNIT WEIGHT (pc0: N/A Piers J.4/1, L/l, K.4/1,1.8/1, K.3/1.6 through B.2/I REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.75 10/22/1998 7 78440 ACCUMULATIVE YARDS: 30 COMPRESSIVE STRENGTH (psi) 2770 1 2 5.75 11/12/1998 28 1 3 5.75 11/12/1998 28 Technician Time: See Report #9828116 Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Teclmistructures, l Started: Finished: (1) Butler Construction (1) City of Coppell (1) City of Coppell ~ E~ng, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 1 of 1 CONCRETE COMPRE SIVE STRENGTH Date of Service: Client No.: Client: 10/14/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9828024 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, T~s 7S247 Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: cowr~croR: Butler Construction CONCRETE SUPPLIER: Pioneer I'~NT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @ 28 Days 5-7" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier H.2/7.6 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 6.00 10/21/1998 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/14/1998 BATCH TAYto: 10:00am TIM~ SAMPLEO: 10:40am aY: Mike Shields WEATHER CONDITIONS: TEMPERATURE CF) - AIR XaUCKNO: 852 AIR CONTENT (%): N/A PLACEMENT LOCATION: Sunny and dry 76 F CONCRETE: 81 F XlCK~T NO: 77528 uNrr wElolrr (pc0: N/A Piers H.2/7, H.2f/.6, H.2/8.5, H.2J9.5 through L/2.2 REPORT OF TESTS AGE LOAD (days) (lbs. force) 7 86390 1 2 6.00 11/11/1998 1 3 6.00 11/11/1998 28 28 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 305O Technician Time: See Report #9828023 Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullcn & Powell Technisiructures, Started: Finished: (1) Butler Construction (1) City of Coppell (1) City of Coppell ~ Engin~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 1 of 1 2ONCRETE COMPRES olVE STRENGTH TES )ate of Service: 10/15/1998 Report No.: 9828101 Client No.: 71765000 Project No.: 43-2170-98 Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Lakeview Center Coppell, Texas ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 20' E of W/30' S of N PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 10/15/1998 BATC}{ ?nVIF,: 3:30am TIME SAMPLED: 4:05am BY: Joe Moore WEATHER CONDITIONS: Cloudy and cool TEMPERATURE (F) - AIR 69 g CONCRETE: 80 F TRUCK NO: 829 TICKET NO: 58325 AIR CONTENT (%): 4 UNIT WEIGHT (per): N/A PLACEMENT LOCATION: Floor slab, norht half of building, line 1 to 10 and line F to A REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLemER M~SUREO mXJMt~ coMpRESSlVZ MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 10/22/1998 7 97580 3450 1 2 5.00 11/12/1998 28 ! 3 5.00 11/12/1998 28 1 4 5.00 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Pace 1 of 7 . ONCRETE COMPRES' ' IVE STRENGTH TES late of Service: Client No.: Client: 10/15/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 D~!!os, Texas 75247 Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: FEST METHOD: 2ON-TRACTOR: Butler Construction 2ONCRETE SUPPLIER: Pioneer ~LANT: 22 ~PECIFICATION REQUIREMENTS S~U~NGT~: 4000 psi @ 28 Days 3-5" 2-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 4:45am WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 1882 AIR CONTENT (%): 5 PLACEMENT LOCATION: See page 1 9349 10/15/1998 BATCH TIM~: 4:00am BY: Joe Moore Cloudy and cool 72 F CONCRETE: 83 F TICKET NO: 77599 UNIT WEIGHT (pcf): N/A SAMPLE LOCATION: 70' E of W/60' S of N REPORT OF TESTS ACCUMULATIVE YARDS: 120 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.50 10/22/1998 7 111510 3940 2 2 5.50 11/12/1998 28 2 3 5.50 11/12/1998 28 2 4 5.50 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Paee 2 of 7 . ONCRETE COMPRES oIVE STRENGTH TES ,; 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 )ate of Service: 10/15/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9828101 43-2170-98 Lakeview Cenmr Coppell, Texas Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5" 2-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 200' E of WI40' N of S PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 6:15am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 193 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: See page I 9349 10/15/1998 BATCH TIME: 5:44am BY: Joe'Moore Cloudy and cool 73 1. CONCRETE: 80 F TICKET NO: 114035 UNIT WEIGHT (pcB: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 230 CYL~a>ER MEASURED MAXgRr~ CO~PRgSSIW MARKED SL~ DA~ AGE LOAD ST~NG~ F~C~ SET NO. (~ch~) ~STED (days) (lbs. force) (~O ~PE 3 1 5.~ 10/22/1998 7 124140 4390 3 2 5.00 11/12/1998 28 3 3 5.00 11/12/1998 28 3 4 5.00 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Pa~e 3 of 7 CONCRETE COMPRES" " IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/15/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9828101 43-2170-98 Lakev~w Cen~r Coppell, Texas Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy and cool STR~NGT~I: 4000 psi @ 28 Days TEM~'ERATURE (V)- AIR 74 F CONCRETE: 83 F SLtrMP: 3-5" TRUCK NO: 829 TlCI~T NO: 77622 AIR: 2-5% Am CONTENT (%): 3.75 UNIT W~IGHT (pc0: N/A TEST M~THOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 230' E of W/90' S of N PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 10/15/1998 BATC}I TIM~: 6:25am TIME SAMPLED: 7:15am BY: Joe Moore REPORT OF TESTS ACCUMULATIVE YARDS: 330 CYLmOER ~nV_,ASVR~ ~SAY. nS~ COMPR~Sn'~ MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.50 10/22/1998 7 103300 3650 4 2 5.50 11/12/1998 28 4 3 5.50 11/12/1998 28 4 4 5.50 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ~ISS Page 4 of 7 gONCRETE COMPRES IVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 )ate of Service: 10/15/1998 Client No.: 71765000 Report No.: 9828101 Project No.: 43-2170-98 Report Date 10/23/1998 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy and cool S~NOTI~: 4000 psi @ 28 Days TEMPEaAaXrRE (F)- AIR 74 V CONCRETW: 83 V SLtrMP: 3-5" TRUCI4:NO: 1824 TICI~? NO: 77633 AIR: 2-5% AIR CONTENT (%): 4.5 UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 300' E of W/60' S of N PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 10/15/1998 BATCH TIME: 7:20am TIME SAMPLED: 8:00am BY: Joe Moore REPORT OF TESTS ACCUMULATIVE YARDS: 420 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 6.00 10/22/1998 7 108200 3830 5 2 6.00 11/12/1998 28 5 3 6.00 11/12/1998 28 5 4 6.00 12/10/1998 56 This report is exclusively for the use of the client indicated above a~d shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Pa~e 5 of 7 3ONCRETE COMPRES VE STRENGTH TEST ,, 8901 Carpenter Frwy., Suite #100 Dallng, Texas 75247 }ate of Service: 10/15/1998 Client No.: 71765000 Report No.: 9828101 Project No.: 43-2170-98 Report Date 10/23/1998 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Project: Lakeview Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: IEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 ]PECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 2-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 60' E of W/100' N of S PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 10/15/1998 BATCH T~m: 8:06am TIME SAMPLED: 9:00am BY: Joe Moore WEATHI~R CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 936 AIR CONTENT (%): 4 PLACEMENT LOCATION: See page 1 Cloudy and cool 74 F CONCRETE: 84 F TICKET NO: 77645 UNIT WEIGHT (pcf): N/A REPORT OF TESTS ACCUMULATIVE YARDS: 530 cv~ra MEASt~ ~A~ COMPRE~SSn~ MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force~ (psi) TYPE 6 1 5.00 10/22/1998 7 101460 3590 6 2 5.00 11/12/1998 28 6 3 5.00 11/12/1998 28 6 4 5.00 12/10/1998 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Paee 6 of 7 ONCRETE COMPRE (' 'i VE STRENGTH TES )ate of Service: Client No.: Client: 10/15/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9828101 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 $PECIEICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 2-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 20' N of S/70' E of W CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 7 1 6.00 7 2 6.00 7 3 6.00 7 4 6.00 DATE TESTED 10/22/1998 PROJECT DATA CONCRETE CLASS: 9349 PLAC~ENT DATE: 10/15/1998 BATC~t TIME: 10:07am TIME SAMPLED: 11:00am BY: Joe Moore WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRVCKNO: 1805 AIR CONTENT (%): 4 PLACEMENT LOCATION: See page 1 Cloudy and cool 75 F CONCRETE: 86 F TICKET NO: 77663 UNIT WEIGHT (pcf): N/A REPORT OF TESTS ACCUMULATIVE YARDS: 680 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. forctO (psi) 7 99620 3520 11/12/1998 11/12/1998 12/10/1998 28 28 FRAC~RE ~PE 56 Technician: Joe Moore Report Distribution: (1) Prentis$ Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistmctures, I Started: 4:00am (i) Butler Construction (!) City of Coppell (1) City of Coppell Finished: 1 ~ :00pm g, Inc. . Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ~ g~ Pa~e 7 of 7 CONCRETE COMPRE" SIVE STRENGTH TES? Date of Service: 10/13/1998 Report No.: Client No.: 71765000 Project No.: Client: Prentiss Properties Limited, Inc. Project: Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 9827881 43-2170-98 Lakeview Center Coppell, Texas 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 10/23/1998 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 3000 psi @ 28 Days 5-7" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier- G/2 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 10/13/1998 BATCH TIME: 9:31am Tn4E SAMPLEO: 10:15am BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 756 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers-G/2, I-I/2, G/3, H/3, I/3, 1.8/3, I/3.6. Sunny/Dry 72 F CONCRETE: 82 F TICKETNO: 76910 UNITWEIGIrr(~0: N/A CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 6.0 REPORT OF TESTS DATE AGE LOAD TESTED (days) (lbs. force) 10/20/1998 7 102770 ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 3630 FRACTURE TYPE 1 2 6.0 1 3 6.0 11/10/1998 28 11/10/1998 28 Technician time: See Technician: Mike Shields Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I Report #9827881 Started: Finished: (1) Butler Construction (I) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of 1 REPORT OF DRILLED BELLED PIERS ENGI~ERING, I~C. 8901 Ca.enter Frwy., Suite #100 Dallas, Texas 75247 Project: Lakeview Center Report No.: 9828898 Coppell, Texas Date of Service: 10/23/98 Project No.: 43-2170-98 Technician: j. Smith/T. Smith Page: 1 of 2 I Pier Identification N1 A/1.8 N2.2 N2.7 , N3.4 A/4.2 A/5.2 A/5.4 N6.3 N7.2 I Pier Diameter (in.) 24 24 24 24 ._ 24 ___ 24 24 24 24 24 Bell Diameter (in.) 72 72 72 72 ~ 72 72 72 72 72 72 Top of Pier Elevation (fi) 97.11 97.11 97.11 97.11 97.11 .... 97.11 97.11 97.11 97.11 97.11 Req. Depth From Exist. Grade (fi) 18.0 18.0 18.0 18.0 18.0 __ 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier From Existing Grade (ft) 18.5 18.6 18.5 18.0 18.0 18.5 19.0 18.0 18.2 18.0 ..... Final Depth of pier From Existing i Grade (fi) 18.5 18.6 18.6 18.0 .......18.2 18.7 19.5 18.0 18.5 18.3 Depth From Top of Concrete (ft) 16.7 16.8 16.8 16.2 _1~:4 16,9 17.7 16.2 16.7 16.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry D~_ Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Y~es_ Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 16.1 16.2 16.2 15.6 15.8 16.3 17.1 15.8 16.1 15.9 Time Drilling Was Completed 7:50 am 8:04 am 8:29 am 8:46 am__ 9:05 am 9:14 am 9:36 am 10:00 am 10:08 am 10:30 am Time Concrete Was Placed 10:45 am 10:50 am 10:55 am 11:05 am 12:06 pm 12:11 pm 12:18 pm 12:30 pm 1:20 pm 1:10 pm REPORT OF DRILLED BELLED PIERS Carp~t~r Frwy., Suite #100 Dallas, Texas ?5247 Project: Lakeview Center Report No.: 9828898 Coppell, Texas Date of Service: 10/23/98 Project No.: 43-217.0-98 Technician: j. Smith/T. Smith Page: 2 of 2 Pier !dentification A/8.1 A/9.1 A/9.6 N10 A.3/10 A.8/10 B.6/10 C.4/10 D/10 ,D/9.2 D/8.3 Pier Diameter (in.) 24 24 24 24 24 _ 24 24 24 24 24 24 Bell Diameter (in.) 72 72 72 72 72 72 72 72 72 72 72 Top of Pier Elevation (ft) 97.11 97.11 97.11 97.11 97.11 97.11_. 97.11 97.11 97.11 97.11 97.11 Req. Depth From Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 1~8.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier From Existing Grade (ft) 18.3 18.5 18.0 18.3 __J8~.1__ 18.4 _._ 18.5 18.4 18.0 18.3 18.5 Final Depth of Pier From Existing Grade (fi) 18.3 18.5 18.5 18.5 18.5 18.5 19.0 18.4 19.0 18.5 18.8 Depth From Top of Concrete (ft) 16.5 16.7 16.7 16.7 _16.7 16.7 17.2 16.6 17.2 16.7 17.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry .... Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes _ yes Yes Yes Yes Yes Yes casing Diameter (in) N/A N/A N/A N/A N/A N/A' N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 6 Le n gth of Verti cai Bars (ff.) 15.9 16.1 16.1 16.1 16.1 16.1 16.6 16.0 16.6 16.1 16.4 Time Drilling Was Completed 10:40 am 10:57 am 11:26 am 11:46 am 12:09 pm 11:57 am 12:28 pm 12:42 pm 1:05 pm 1:27 pm 1:44 pm Time Concrete Was Placed 1:25 pm 1:35 pm 1:48 pm 1:58 pm 2:07 pm 2:12 pm 2:17 pm 2:23 pm 2:33 pm 3:15 pm 3:23 pm