Loading...
Park West CC(7)-LR 981020 REPORT OF DRILLE "BELLED PIER INSPE ION 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/09/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9827090 Project No.: 43-2170-98 Report Date 10/20/1998 Project: Lakeview Center Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. NOTE: Drillers used levels to plumb all piers drilled. Technician Time: 6:30 am to 3:30 pm Technician: Mike Shields Report Distribution: (I) Prentiss Properties Limited, loc. (1) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, 1 (I) Butler Construction (1) City of CoppeH (I) City of Coppcll Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99TMP Page 1 of I