Loading...
Park West CC(1)-LR 950817 21 REPORT HO.: JOB NO.: Park West Commerce Center Tilt wall panel - #55 LOCATION: ARCHITECT/ENGINEER: McFadden & Miller CONTRACTOR: Marc Myers REPORTED TO: reed engineering GEOTECHNICAL CONSULTANTS DATE OAST: CONCRETE COMPRESSION TEST REPORT 2166.2 QUANTITY REPRESENTED: 07/20/95 3000 PSI 20/160 yds DATE: SAMPLED BY: B ' Lucas 08 / 17 / 95 BY ORDER OF: 07/27/95 ORDER NUMBER: Client (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA-28.26 SQ. IN. LABORATOFIY NUMBER FIELD NUMBER: PW072001 PW072002 PW072003 117,000 120,000 28 28 4140 4240 4190 88,000 MAXIMUM LOAD, LBS: 7 AGE WHEN TESTED, DAYS: 3110 COMPRESSIVE STRENGTH, PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REM*RKS: Does comply with Specification METHOD OF CURING: FIELD TEMPERATURE: AMBIENT TIME OF SAMPLE: 0 6: 4 5 SOURCE OF CONCRetE: TXI I DAYS. LABORATORY FROM 07 / 21 / 95 7 5 'F M,X 8 5 'F, AIR CONTENT M,X CODE.' 39 TRANSPORTED BY Reed SLUM, 8.25 PICK-UP CHARGE: Y~ TICKET NO.: 421739 INCHES NO FINE AGGREGATE: COARSE AGGREGATE: WATEP; CEMENT: FLY ASH: ADMixTURE(S): UNIT WEIGHT YIELD PCF C, FK~Y D,Sm,S~ON: (1) Marc Myers Company/Mr. Richard Crow ~) McFadden & Miller Construction/Mr. Dave vanDeme( (1) Comerica Bank/Mr. Alan Williams (1) AECC, Inc./Mr. Andy Brundige SE,ED TEST METHODS: ASTM C31, C39, C143, C173, C192, C231, ORC1064 1 2424 5TUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/35C~5600 · (FAX) 214/35CH)019