Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Park West CC(7)-LR 981015
REPORT OF DRILLED BELLED PIERS 8901 Carpenter Fnvy., Suite #100 DnlI~, Texas 75247 Project: Lakeview Center Report No.: 9828116 Coppell, Texas Date of Service: 10/15/98 Project No.: 43-2170-98 Technician: M. Shields Page: 1 of 2 - Pier Identification J.4/1 L/1 K.4/1 1.8/1 K.3/1.6 J.8/1 ' L/2.1 H.6/1 H.4/1 G.9/1 F.7/1 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 72 72 72 72 72 72 72 72 72 72 72 Top of Pier Elevation (ft) 97-11 97-11 97-11 97-11 97-11 97-11 97-11 97-11 97-11 97-11 97-11 Req. Depth From Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier From Existing Grade (ft) 18.0 18.1 18.0 18.0 18.0 18.0 18.0 18.1 18.0 18.0 18.6 Final Depth of Pier From Existing Grade (ft) 18.3 18.3 18.1 18.1 18.0 18.2 18.2 18.2 18.0 18.1 19.0 Depth From Top of Concrete (ft) 16.6 16.6 16.4 16.4 16.3 16.5 16.5 16.5 16.3 16.4 17.3 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 16.1 16.0 16.0 16.0 15.8 16.0 16.0 16.0 15.8 16.0 16,8 Time Drilling Was Completed 8:15 am 8:00 am 9:15 am 8:50 am 10:10 am 10:20 am 9:40 am 10:35 am 11:00 am 11:25 am 12:50 pm Time Concrete Was Placed 10:20 am 10:00 am 10:10 am 12:25 pm 11:20 am 11:00 am 11:10 am 12:35 pm 12:45 pm 1:00 pm 1:10 pm REPORT OF DRILLED BELLED PIERS 8901 Carpenter Ftwy., Suite #100 Dall~s, Tex~s 75247 Project: Lakeview Center Report No.: 9828116 Coppell, Texas Date of Service: 10/15/98 Prolect No.: 43-2170-98 Technician: M. Shields Page: 2 of 2 Pier Identification F.4/1 G.4/1 E.6/1 E. 1/1 D.4/1 D.2/1 C.3/1 B.5/1 B.2/1 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 72 72 72 72 72 72 72 72 72 Top of Pier Elevation (ft) 97-11 97-11 97-11 97-11 97-11 97-11 97-11 97-11 97-11 Req. Depth From Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier From Existing Grade (ft) 18.0 18.0 18.3 18.1 18.2 18.1 18.0 18.2 19.1 Final Depth of Pier From Existing Grade (ft) 18.1 18.0 18.5 18.3 18.3 18.3 18.3 18.4 18.3 Depth From Top of Concrete (ft) 16.4 16.3 16.8 16.6 16.6 16.6 16.6 16.7 16.6 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bare (ea.) 6 6 6 6 6 6 6 6 ,6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 16.0 15.8 16.3 16.0 16.0 16.0 16.1 16.2 16.0 Time Drilling Was Completed 12:20 pm 11:45 am 1:00 pm 1:25 pm 1:45 pm 2:10 pm 2:30 pm 2:45 pm 3:05 pm Time Concrete Was Placed 1:20 pm 1:30 pm 1:40 pm 3:00 pm 3:10 pm 3:20 pm 3:30 pm 4:15 pm 4:30 pm