Loading...
Park West CC(1)-LR 950823 (2)AU9 2 8 '"'- reed engineering GEOTECHNICAL CONSULTANTS August 23, 1995 Project No. 2166.2 Report No. 7 Marc Myers Company 3811 Turtle Creek Boulevard, Suite 1020 Dallas, Texas 75219 ATTN: Mr. Richard Crow Re: Construction Materials Testing Park West Commerce Center Airline Drive and Executive Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities for the period of July 27 through August 10, 1995. During the period of July 27 through August 8, 1995, a total of 22 field density tests were taken on sanitary sewer and water line backfill. Test results are shown on Plate 1. Where tested, materials were found to be in compliance with project specifications. Construction of piers resumed on August 10, 1995. Pier construction was observed and the piers were found to be in compliance with project plans and specifications. Pier designations and depths are shown on Plate 2. A sample of the pier concrete was also obtained. Compressive strength test results will be submitted under separate cover. 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-O019 Marc Myers Company Project No. 2166.2/Report No. 7 August 23, 1995 Page 2 Additional reports will be submitted as the work progresses. have any questions, do not hesitate to call. Sincerely, KEA/RFR/msm copies submitted: INC. (1) Marc Myers Company/Mr. Richard Crow ~1) McFadden & Miller/Mr. Dave VanDemeer (1) Comerica Bank/Mr. Alan Williams If you (1) AECC, Inc./Mr. Andy Brundige reed engineering PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 7 Test Date No. 07-27-95 290 291 292 07-28-95 293 294 295 296 297 07-29-95 298 299 300 301 08-07-95 302 303 304 305 306 08-08-95 307 308 309 310 311 Field Density Tests Location Depth Below Unit Final Dry S.G. Weight (feet) (pcf) 8" H20/STA 8" H20/STA 8" H20/STA 8" H20/STA 8" H20/STA 7+01 3 0 7+70 2 5 8+13 1 5 9+40 3 0 7+25 1 5 90 0 88 2 97 7 85 3 88 2 85 4 86 3 86 7 8" H20/STA 9+35 2 0 8" H20/STA 10+85 2 0 8" H20/STA 13+10 2 0 S.S. "A"/ STA 1+30 1.0 88.6 S.S. "A" / STA 0+90 1.0 88.7 S.S. "B" / STA 2+55 1.5 88.7 S.S. "B" / STA 1+85 1.5 89.1 8" H20 Supply Line/STA 0+90 0.0 92.1 8" H20 Supply Line/STA 0+30 0.0 92.9 S . S . "B" / STA 1+00 0.0 96.7 S.S. "B" / STA 2+50 0.0 92.5 S.S. "A" / STA 1+00 0.0 95.1 8" H20/STA 9+60 1.0 86.0 8" H20/STA 11+10 1.0 86.3 8" H20/STA 12+85 1.0 86.4 8" H20/STA 13+85 1.0 88.4 8" H20/STA 15+85 1.0 92.4 Com- pac- Moisture tion Content Curve Level (%) No. (%) 28.9 2 100.2 29.3 2 98.2 23.5 1 100.8 31.7 2 95.0 27.6 2 98.2 31.7 2 95.1 31.6 2 96.1 31.5 2 96.6 28.9 2 98.7 26.6 2 98.8 28.2 2 98.8 27.8 2 99.2 25.5 2 95.0 25.9 2 95.9 26.7 2 99.8 28.8 1 95.5 28.4 2 98.1 30.8 2 95.8 29.7 2 96.1 31.7 2 96.2 29.0 2 98.4 25.0 1 95.4 GEOTECHNICAL CONSULTANTS - PLATE 1 reed en, gin:=rJn, g PARK WEST COMMERCE CENTER AIRLINE DRIVE AND EXECUTIVE DRIVE COPPELL, TEXAS REPORT NO. 7 Date 08-10-95 Pier Summary Depth Final Pier Bell Before Pier Pier Diameter Size Bell Depth No. (in.) (in.) (ft.) (ft.) F.3-1 24 72 F.9-1 24 66 F.9-1.8 24 66 F.3-30 24 72 F.9-30 24 72 F.9-29.2 24 72 G-15 24 60 G-15.5 24 54 G-16 24 60 G-16.5 24 54 G-17 24 60 8 7 8 8 8 8 9 4 8 7 8 9 11 1 11 4 11 1 11.6 13.0 8.7 8.8 8.8 9.4 8.6 8.9 11.0 11.4 11.1 11.6 13.0 GEOTECHNICAL CONSULTANTS , PLAT[ 2