Loading...
Park West CC(1)-LR 950824REPORT NO.: PROJECT: LOCATION: 25 JOB NO.: Park West Commerce Center Tilt wall panel - #50 reed engineering CONCRETE COMPRESSION TEST REPORT 2166.2 SPECIFICATION: QUANTITY REPRESEHTED: 07/27/95 3000 PSI 10/180 yds ARCH~NGINEER: McFadden & Miller Marc Myers REPORTED TO: DATE: 8AM~EDBY: B. Lucas 08/24/95 s¥ ORDER OF: 08/03/95 ORDER NUMBER: Client (6 x 12 INCH) NOMINAL CYUNDER SIZE: AREA-28.26 SQ. IN. LABORATORY NUMBER FIE~ .UMBER: PW072701 PW072702 103,500 128,000 MAXIMUM LOAD, LBS: 7 28 AGE WHEN TESTED, DAYS: 3660 4530 AVERAGE STRENGTH, PSI: 4740 BREAK: CON.AL (U.N.O.) REM~S: Does comply with Specification PW072703 140,000 28 4950 METHOO OF CURING: FIELD TEMPERATURE: AMBIENT TIME OF SAMPLE: 07: 15 SOU~,CE O~ C~NCRETE: TX I 1 D^YS, LA~RATORY ~ROM 07 / 28 / 95 .,X 89 '~, MIX CODE: AIR CONTENT 39 77 'F TRANSPORTED BY Reed SLUM, 5.00 PICK-UP CHARGE: Y~ T,CKET NO.: 426647 INCHES NO FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): UNIT WEIGHT PCF YIELD CF/CY D~.~BU~ON: (1) Marc Myers Company/Mr. Richard Crow ~1) McFadden & Miller Construction/Mr. Dave (1) Comerica Bank/Mr. Alan Williams (1) AECC, Inc./Mr. Andy Brundige $~NED TEST METHOOS: ASTM C $,. C 39, C ,4~. C 17~. C 192. C 23,.OR C 1064 PAGE 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019