Park West CC(7)-LR 981009· IN-PLACE DENSITY / STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: Services: 09/30/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 In-place density testing. Report No.: 9825433 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 10/09/1998 CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: MOISTURE DENSITY RELATIONS: MID No. Description 1 Reddish Brown Clayey Sand w/Clay Balls & Gravel Moisture Maximum Density pcf 11.5 123.5 FIELD DENSITY TESTS ASTM D-2922 ASTM D-3017 Project Requirements Moisture Density -2/+2% 95% TEST NO TEST LOCATION 6" Sanitary, Select 369 Line D at Station 0+20, 2nd Lift 370 Line D at Station 0+30, 1st Lift 371 Line C at Station 0+50, 2nd Lift 372 Line C at Station 0+60, 1st Lift 373 Line B at Station 0+20, 2nd Lift 374 Line B at Station 0+40, 1 st Lift g" Sanitary 375 Line A at Station 0+50, 2nd Lift 376 Line A at Station 0+60, 1 st Lift 377 Line A at Station 1+60, 2nd Lift 378 Line A at Station 1+70, 1st Lift M/D MOISTURE DRY DENSITY DENSITY No. (%) (PC0 (% max) 1 12.1 119.8 97 1 12.3 120.0 97 1 12.2 119.9 97 1 12.2 119.9 97 1 11.9 119.8 97 1 12.1 120.2 97 1 11.7 120.0 97 1 12.0 120.4 98 1 12.1 119.7 97 1 12.3 120.0 97 This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2 . Report No.: 9825433 TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (PC0 (% max) 379 Line A at Station 3+00, 2nd Lift 380 Line A at Station 3+10, 1st Lift 381 Line A at Station 4+50, 2nd Lift 382 Line A at Station 4+60, 1st Lift 383 Line A at Station 5+80, 2nd Lift 384 Line A at Station 5+90, 1st Lift 1 12.1 119.4 97 1 12.2 119.8 97 1 11.7 119.9 97 1 11.9 120.2 97 1 11.6 120.4 98 1 11.7 120.7 98 Test results on this report meet project specification. Technician: Tex King Report Distribution: (I) l¥~ntiss Properties Limited, Inc. (I) Alliance Architects, Inc. (I) Halff Associates (I) Mullen & Powell Technistructures, 1 (1) Butler Construction (I) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2 REPORT OF DRILLED BELLED PIERS 8901 Ca~peatcr Fmo,., Smtc #100 Dallas, Texas 75247 Project: Lakeview Center Coppell, Texas Project No.: 43-2170-98 Report No.: 9827090 Date of Service: 10/9/98 Technician: M. Shields Page: 1 of 1 Pier Identification 1/9 J/9 K/9 K/8 K/7 K/6 ,, Pier Diameter (in.) 24 24 24 24 24 24 Bell Diameter (in.) 66 66 66 66 66.0 66.0 , Top of Pier Elevation (ft) 99.0 99.0 99.0 99.0 99.0 99.0 _ Raq. Depth From Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 __ Initial Depth of Pier From Existing Grade (ft) 18.3 18.5 18.2 18.6 18.0 18.2 _ Final Depth of Pier From Existing Grade (ft) 18.4 _ 19.2 19.5 18.8 18.1 ..18.___~5 Depth From Top of Concrete (ft) 17.7 18.5 18.8 18.0 __ 17.3 17.8 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry _ Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 Length of Vertical Bars (ft.) 17.2 18.0 18.3 17.5 16.8 17.3 Time Drilling Was Completed 8:45 am 9:20 am 10:00 am 12:45 pm 11:5_0 am 12:10 pm Time Concrete Was Placed 12:00 pm 11:50 am 11:40 am 1:40 pm 1:45 pm 1:55 pm