Loading...
Park West CC(7)-LR 981008 IN-PLACE DENSITY rt, STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 09/29/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9825427 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 10/08/1998 Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Dark Gray Shaley Clay 23.0 95.5 FIELD DENSITY TESTS +4% or above 92% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (per) (% max) 8" Sanitary Line A 355 at Station 1+00, 3' Below Grade 356 at Station 1+20, 2' Below Grade 357 at Station 2+50, 3' Below Grade 358 at Station 2+60, 2' Below Grade 359 at Station 4+00, 3' Below Grade 360 at Station 4+10, 2' Below Grade 361 at Station 5+50, 3' Below Grade 362 at Station 5+60, 2' Below Grade 6" Sanitary Line B 363 at Station 0+60, 3' Below Grade 364 at Station 0+70, 2' Below Grade 6" Sanitary Line C 1 27.9 88.9 93 1 27.7 88.8 93 1 27.8 89.1 93 1 27.7 89.3 94 1 27.9 89.4 94 1 27.6 89.3 94 1 27.6 89.1 93 1 27.4 89.3 94 1 27.6 88.8 93 1 27.2 89.0 93 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2 Report No.: 9825427 TEST NO 365 366 367 368 TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pcf) (% max) at Station 0+20, 2' Below Grade at Station 0+40, 2' Below Grade 6" Sanitary Line D at Station 0+20, 3' Below Grade at Station 0+40, 2' Below Grade 1 27.9 88.8 93 1 27.2 89.0 93 1 27.8 89.4 94 I 27.6 89.1 93 Test results on this report meet project specification. Technician: Tex King Report Distribution: (1) Prentis$ Properties Limited, Inc. (1) Alliance Architects, Inc. (i } Haiff Associates (I) Mullen & Powell Technistmctures, I (1) Butler Construction (1) City of Coppell (1) City of Coppell ~ Eng~c. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2