Park West CC(7)-LR 981008 IN-PLACE DENSITY rt, STING
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
09/29/1998
71765000
Prentiss Properties Limited, Inc.
Attn: David Glass
3860 W. Northwest Hwy.
Dallas TX 75220
Report No.: 9825427
Project No.: 43-2170-98
Project: Lakeview Center
Coppell, Texas
Report Date
10/08/1998
Services: In-place density testing.
CONTRACTOR: Butler Construction
PROJECT DATA
Laboratory Test Method: ASTM D-698
Field Test Method:
ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
M/D No.
Description
Maximum
Moisture % Density pcf
Project Requirements
Moisture Density
Dark Gray Shaley Clay
23.0 95.5
FIELD DENSITY TESTS
+4% or above 92%
TEST
NO TEST LOCATION
M/D MOISTURE DRY DENSITY DENSITY
No. (%) (per) (% max)
8" Sanitary Line A
355 at Station 1+00, 3' Below Grade
356 at Station 1+20, 2' Below Grade
357 at Station 2+50, 3' Below Grade
358 at Station 2+60, 2' Below Grade
359 at Station 4+00, 3' Below Grade
360 at Station 4+10, 2' Below Grade
361 at Station 5+50, 3' Below Grade
362 at Station 5+60, 2' Below Grade
6" Sanitary Line B
363 at Station 0+60, 3' Below Grade
364 at Station 0+70, 2' Below Grade
6" Sanitary Line C
1 27.9 88.9 93
1 27.7 88.8 93
1 27.8 89.1 93
1 27.7 89.3 94
1 27.9 89.4 94
1 27.6 89.3 94
1 27.6 89.1 93
1 27.4 89.3 94
1 27.6 88.8 93
1 27.2 89.0 93
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07TMP Page 1 of 2
Report No.:
9825427
TEST
NO
365
366
367
368
TEST LOCATION
M/D MOISTURE DRY DENSITY DENSITY
No. (%) (pcf) (% max)
at Station 0+20, 2' Below Grade
at Station 0+40, 2' Below Grade
6" Sanitary Line D
at Station 0+20, 3' Below Grade
at Station 0+40, 2' Below Grade
1 27.9 88.8 93
1 27.2 89.0 93
1 27.8 89.4 94
I 27.6 89.1 93
Test results on this report meet project specification.
Technician: Tex King
Report Distribution:
(1) Prentis$ Properties Limited, Inc.
(1) Alliance Architects, Inc.
(i } Haiff Associates
(I) Mullen & Powell Technistmctures, I
(1) Butler Construction
(1) City of Coppell
(1) City of Coppell
~ Eng~c.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07TMP Page 2 of 2