Loading...
ST9801-LR000905 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: Location: Project: Contractor: Reported To: 111 Job No.: 1520COP03 Coppell Road, Inlets at Stas. 3+00 and 26+00 Coppell Road Paving and Drainage Improvements Ed Bell Construction City of Coppell - Kenneth Gdffin, P.E. (6 x 12 Inch) Nominal Cylinder Size: Area - 28.27 SO. IN. Date Cast: Specification: Quantity Represented: Sampled By: By Order Of: Field Number: Test Date: Maximum Load, LBS: Age When Tested, Days: Compressive Strength, PSh Average Strength, PSh Type Break: Conical (U.N.O.) Remarks: 09/05/00 4000 psi @ 28 days 4.5 of 4.5 S. Adli CP090501 CP090502 CP090503 CP090504 09/12/00 10/03/00 10/03/00 HOLD I O2490 7 28 28 HOLD 3630 Temperature: Ambient Time of Sample: 1:20 PM Soume of Concrete: 100 o F Mix 95 o F TXI - 8205 Air Content 5.0 % Slump Pick-Up Charge: Yes N/A Ticket No.: 2727098 4.0 Inches Fine Aggregate: Coarse Aggregate: Water: Cement: Fly Ash: Admixture(s): Distribution: City of Coppell - Larry Davis Unit Weight PCF Ymld CF/CY Test Methods: ASTM C 31, C 39, C 173, C 192, C 231 and C 1064 OUR LETTERS AND REPORTS ARE FOR THE EXCLUSIVE USE OF THE CLIENT TO WHOM THEY ARE ADDRESSED AND APPLY ONLY TO THE SAMPLES TESTED. TEST RESULTS ARE NOT NECESSARILY INDICATIVE OF THE QUALITY OF APPARENTLY IDENTICAL OR SIMILAR SAMPLES. THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL WITHOUT THE APPROVAL OF STANTECH.