Loading...
Park West CC(1)-LR 950905 reed engineering GE'OTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT REPORT NO.: PROJECT: LOCATION: 27 Park West Commerce Center Tilt wall panel - #56 2166.2 DATE CAST: SPECIFICATION: QUANTITY REPRESENTED: 08/08/95 3000 PSI 20/200 yds ARCHITECT/EHGINEER: ~ddPLED BY: S. Lucas CONTRACTOR: REPORTED TO: McFadden & Miller Marc Myers DATE: BY ORDER OF: 09/05/95 08/15/95 ORDER NUMBER: Client (a x 12 INCH) NOMINAL CYLINDER SIZE: AREA.2~.2~ SQ. IN. FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH. PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: PW080801 97,000 7 3430 ~BORATORY NUMBER PW080802 128,200 28 4530 Does comply with Specification PW080803 126,000 28 4460 4500 METHOO OF CURING: FIELD TEMPERATURE: AMBiEN~F TIME OF 8AMPLE: 07:10 SOURCE OF CONCRETE: FINE AGGREGATE: COARS, E AGGREGATE: WATER: CEMENT: FLY A~H: ADMIXTURE(B): DAYS, LABORATORY FROM 1 MIX 78 87 08/09/95 "F, AIR CONTENT TX I u~x coc,~: 39 TRANSPORTED BY Reed %, SLUMP PICK-UP CHARGE: TICK~ NO.: 431424 UN~' WEIGHT YIELD 5.75 ,NCHES NO CF/CY DtSTRIBUll(~: l(1) McFadden & Miller Construction/Mc. Dave (1) Marc Myers Company/Mr. Richard Crow (1) COmerica Bank/Mr. Alan Williams (1) AECC, Inc./Mr. Andy Brundige SIGNED 1 TEST METHODS: ASTM C 31, C 38, (.~ 1,13, C 173, C 192, C 231, OR C 1064 PAGE OF imm 2424 STUTZ DRIVE · SUITE400 · DALLAS, TE'XA~S75235 · 214/350-5600 · (FAX) 214/350-0019