Park West CC(7)-LR 980929 , -PLACE DENSITY T TING
8901 Carpenter Frwy., Suite #100
Dall~% Texas 75247
Date of Service:
Client No.:
Client:
09/19/1998
71765000
Prentiss Properties Limited, Inc.
Attn: David Glass
3860 W. Northwest Hwy.
Dallas TX 75220
Report No.:
Project No.:
Project:
9824894
43-2170-98
Lakeview Center
Coppell, Texas
Report Date
09/29/1998
Services: In-place density testing.
CONTRACTOR: Butler Construction
PROJECT DATA
Laboratory Test Method: ASTM D-698
Field Test Method:
ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
M/D No.
Description
Maximum
Moisture % Density pcf
Project R~uirements
Moisture Density
Light brown to tan shaley clay
w/gravel & limestone pieces
20.5 99.5
FIELD DENSITY TESTS
-1~3% 95%
TEST
NO TEST LOCATION
M/D MOISTURE DRY DENSITY DENSITY
No. (%) (pcf) (% max)
Storm Drain, Lateral Lines
280 A-2B @ 1+90, 1st lift
281 A-2B @ 2+00, 2nd lift
282 A-2B @ 2+10, f'mal
283 A-2C @ 1+05, 1st lift
284 A-2C @ 1+10, 2nd lift
285 A-2C @ 1+20, final
286 A-4 @ 3+00, 1st lift
287 A-4 @ 3+10, 2nd lift
288 A-4 @ 3+20, final
289 A-4 @ 4+50, 1st lift
290 A-4 @ 4+60, 2nd lift
291 A-4 @ 4+70, final
1 21.9 95.6 96
1 21.6 95.4 96
1 21.8 95.2 96
1 22.0 95.5 96
1 21.7 95.8 96
1 22.1 95.7 96
1 22.3 95.9 96
i 22.1 95.9 96
1 22.2 95.6 96
I 21.9 95.9 96
1 22.2 95.4 96
1 22.3 95.6 96
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the. written approval of HBC Engineering, Inc.
~7KG Page 1 of 2
~.eport No.:
9824894
TEST
NO
TEST LOCATION
M/D MOISTURE DRY DENSITY DENSITY
No. (%) (pc0 (% max)
292 A-4 @ 6+00, 1st lift
293 A-4 @ 6+10, 2nd lift
294 A-4 @ 6+20, final
295 A-4 @ 7+50, 1st lift
296 A-4 @ 7+60, 2nd lift
297 A-4 @ 7+70, final
1 22.0 95.5 96
! 22.3 95.6 96
1 22.1 95.1 96
1 21.9 95.2 96
1 22.1 95.6 96
1 22.4 95.5 96
Test results on this report meet project specification.
Technician: Tex King
Report Distribution:
(1) Prentiss Properties Limited, Inc.
(1) Alliance Architects, Inc.
(1) Halff Associates
(1) Mullen & Powell Technistructures, I
(1) Butler Construction
(1) City of Coppell
(1) City of Coppell
I'~ Engin~
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 2