Loading...
Park West CC(7)-LR 980921IN-PLACE DENSITY STING 8901 Carpenter Frwy. Suite #I00 Dalla,n, Texas 75247 Date of Service: Client No.: Client: 09/09/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9823785 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 09/21/1998 Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Te~t Method: AST1V[ D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Maximum Description Moisture % Density pcf Project Requirements Moisture Density Reddish Brown Clayey 11.5 123.5 Sand w/Clay Balls and Gravel FIELD DENSITY TESTS -2/+2% 95% TEST NO M/D TEST LOCATION No. MOISTURE DRY DENSITY DENSITY (%) (PC0 (% max) Northwest Wing 259 NW Comer, 60'S+30'E, Select, 2nd Lift 260 NW Comer, 60'S+70'E, Select, 2nd Lift 261 N-W Comer, 60'S+140'E, Select, 2ndLift 262 NW Comer, 60'S+170'E, Select, 2nd Lift 263 NW Comer, 60'S+200'E, Select, 2nd Lift North Half of East Wing 264 NE Comer, 60'W+20'S, Select, 2nd Lift 265 NE Comer, 60'W+50'S, Select, 2nd Lift 266 NE Comer, 60'W+80'S, Select, 2nd Lift 267 NE Comer, 60'W+140'S, Select, 2nd Lift 268 NE Comer, 60'W+160'S, Select, 2nd Lift 1 11.7 119.9 97 1 11.9 119.8 97 1 11.6 120.2 97 1 12.0 119.7 97 1 11.9 119.9 97 1 12.3 119.4 97 1 12.1 119.7 97 1 12.2 118.9 96 1 12.0 119.4 97 1 12.3 119.2 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0TTMP Page I of 2 . Report No.: 9823785 TEST M/D MOISTURE NO TEST LOCATION No. (%) 269 NE Comer, 60'W+190'S, Select, 2nd Lift 1 12.1 270 NE Comer, 60'W+230'S, Select, 2nd Lift 1 12.4 Test results on this report meet project specification. DRY DENSITY (pc0 119.3 119.4 DENSITY (% max) 97 97 Technician: Tex King Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. ( i ) Halff Associates (1) Mullen & Powell Technistructures, I (I) Butler Construction (1) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2