Loading...
Park West CC(7)-LR 9809174N-PLACE DENSITY / 'STING 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 09/08/1998 Client No.: 71765000 Client: Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9823656 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 09/17/1998 Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description 1 Lt Bm to Tan Sandy Clay w/Gravel & Limestone Pieces Maximum Project Requirements Moisture % Density pcf Moisture Density 20.5 99.5 - 1/+3% 95% FIELD DENSITY TESTS TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (PC0 (% max) 54" Storm Drain, Line "A" 233 ~ station 5+00,Final lift 234 ~ station 5+10, 1' below grade 48" Storm Drain, Line "A" 235 ~ station 6+50, Final lift 236 ~ station 6+60, 1' below grade 237 ~ station 7+40, Final lift 238 ~ station 7+50, 1' below grade 239 ~ station 8+90, Final lift 240 ~ station 9+00, 1' below grade 48" Storm Drain, Line "B" 241 ~ station 0+50, Final lift 1 20.4 97.4 98 1 20.9 97.5 98 1 20.5 97.0 98 1 20.7 97.2 98 1 20.9 97.1 98 1 21.0 97.4 98 1 20.7 96.8 97 1 21.0 97.1 98 1 20.9 96.8 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 1 of 2 Report No.: 9823656 TEST NO TEST LOCATION 242 ~ station 0+50, 1' below grade 243 ~ station 2+00, Final lift 244 ~ station 2+10, 1' below grade 245 ~ station 3+00, Final lift 246 ~ station 3+10, 1' below grade 42" Storm Drain, Line "B" ~ station 3+90, Final lift 247 248 249 250 251 252 M/D MOISTURE DRY DENSITY No. (%) (pc0 253 254 255 256 257 258 ~ station ~ station ~ station @ station @ station 36" RCP ~ station ~ station ~ station ~ station @ station @ station 4+00, 1' below grade 5+00, Final lift 5+10, 1' below grade 5+80, Final lift 5+90, 1' below grade Line "A-Z" 0+20, Final lift 0+30, 1' below grade 1+40, Final lift 1+50, 1' below grade 2+10, Final list 2+20, 1' below grade DENSrrY (%maO 1 21.2 97.0 98 1 20.6 97.1 98 1 20.9 97.4 98 1 20.9 97.1 98 1 21.4 96.9 97 1 21.0 97.1 98 1 21.3 97.0 98 1 2O.8 96.9 97 1 21.0 96.6 97 1 20.9 97.1 98 1 21.2 97.3 98 1 21.0 96.8 97 1 21.6 96.5 97 1 21.4 96.8 97 1 21.0 96.9 97 1 21.6 96.6 97 1 21.3 96.8 97 Test results on this report meet project specification. Technician: Tex King Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (1) HalffAssociates (1) Muilcn & Powcll Technistmctures, I (1) Butler Construction ( 1 ) City of Coppell (1) City of Coppell Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2