Loading...
Park West CC(7)-LR 980916.tN-PLACE DENSITY STING Date of Service: Client No.: Client: 09/02/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report No.: 9823246 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 09/16/1998 Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. 1 R. cddish Bm Clayey Sand w/Clay Balls & Gravel Description Maximum Project Requirements Moisture % Density pcf Moisture Density 11.5 123.5 -2/+2% 95% FIELD DENSITY TESTS TF~T NO M/D MOISTURE DRY DENSITY DENSITY TEST LOCATION No. (%) (pcf) (% max) North Half of E Wing NE Comer 30'W & 50'S, Select, 1 st Lift NE Corner 30'W & 100'S Select, 1st Lift 200 201 202 NE Comer 30'W & 150'S 203 NE Comer 30'W & 200'S 204 NE Comer 30'W & 230'S 205 NE Comer 90'W & 210'S 206 NE Comer 90'W & 170'S 207 NE Comer 90'W & 140'S 208 NE Comer 90'W & 90'S, 209 NE Comer 90'W & 60'S, 210 NE Comer 90'W & 10'S, 1 12.6 118.7 96 1 12.3 118.4 96 Select, 1st Lift 1 12.5 119.3 97 Select, 1st Lift 1 12.1 118.9 96 Select, 1st Lift 1 12.6 118.8 96 Select, 1st Lift 1 12.3 118.8 96 Select, 1 st Lift 1 12.1 118.9 96 Select, 1st Lift 1 12.0 119.8 97 Select, 1st Lift 1 12.4 119.4 97 Select, 1st Lift 1 12.3 119.2 97 Select, 1st Lift 1 12.2 119.3 97 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page I of 2