Loading...
Park West CC(7)-LR 980904MOISTURE DENSITY ".ELATIONS 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 08/28/1998 71765000 Prentiss Properties Limited, Inc. Attn: DavidGlass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9822789 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 09/04/1998 Services: Material sampled by technician for moisture density relations. CONTRACTOR: Butler Construction TEST FOR: Proposed Select Fill MATERIAL: Reddish Brown Clayey Sand with Clayballs/Gravel TEST M~IOD: ASTM D-698 PROJECT DATA DATE SAMPLV, D: 08/28/1998 SAMPLED BY: Tex King SAMPLE LOCATION: Imported Material MAXIMUM DRY DENSITY, pcf: 123.5 OPTIMUM MOISTURE CONTENT, %: 11.5 REQUIREMENTS LIQUID LIMIT: 25 Maximum 35 PLASTIC LIMIT: 13 PLASTICITY INDEX: 12 Range 6 - 15 Test results on this report meet project specificiations as noted above. Technician: Tex King Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Alliance Architects, Inc. (!) Halff Associates (!) Mullen & Powell Technistructures, l (1) Butler Construction (1) City of Coppell (1) City of Coppell REPORT OF TEST MOISTURE DENSITY RELATIONS Zerc air v ,ids cave Spec [ftc C avit~ 0.00 133 129 Dry Density (pc0 125 121 117 8 10 12 14 16 18 20 MOISTURE CONTENT (%) //'""x,~ ~ Engineerintr~nc. J Dennis Ttay~ Sr. C~chnician This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1 MOISTURE DENSITY ".ELATIONS 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 08/21/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9822084 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 09/04/1998 Services: Material sampled by technician for moisture density relations. CONTRACTOR: Butler Construction TEST FOR: Proposed Select Fill MnamatnL: Tannish Brown Clayey Sand with Gravel TEST METHOD: ASTM D-698 PROJECT DATA DATE SAMPLED: 08/21/1998 SAMPLED BY: Tex King SAMPLE LOCATION: Imported material MAXIMUM DRY DENSITY, pcf: 119.0 OPTIMUM MOISTURE CONTENT, %: 13.0 REQUIREMENTS LIQUID LIMIT: 19 Maximum 35 PLASTIC LIMIT: 17 PLASTICITY INDEX: 2* Range 6 - 15 An asterisk (*) appears next to test results which do NOT meet the project specifications as notes above. Technician: Tex King Report Distribution: (!) Prentiss Properties Limited, Inc. (i) Alliance Architects, Inc. (1) Halff Associates (1) Mullen & Powell Technistructures, I (1) Butler Construction (1) City of Coppell (1) City of Coppell REPORT OF TEST MOISTURE DENSITY RELATIONS Zero air w ~ids carve Spex tic G ravit 0.00 g ~ · : ? 121 119 Dry Density (pcf) 117 115 115 10 12 14 16 18 20 22 MOISTURE CONTENT (%)  I'-~ Engineer' , Inc. Dennis ~a~, CET Sr. CME'Technician This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1