Loading...
Park West CC(7)-LR 980827.IN-PLACE DENSITY _ "' STING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 08/14/1998 7 ! 765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9821497 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 08/27/1998 Services: in-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Lt. Brn to Tan Sandy Clay w/Gravel & Limestone Pieces 20.5 99.5 FIELD DENSITY TESTS +4% or Above 92% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY · No. (%) (pc0 (% max) 71 72 73 74 75 76 77 78 79 80 81 82 Southeast Corner 40'W & Southeast Corner 40'W & Southeast Corner 40'W & Southeast Corner 40'W & Southeast Corner 4ffW & Southeast Corner 40'W & Southeast Corner 40'W & Southeast Corner 40'W & 240'N Southeast Corner 40'W & 250'N Southeast Corner 90'W & 240'N Southeast Corner 90'W & 230'N Southeast Corner 90'W & 220'N 70'N, Subgrade 75'N, 1st Lift 80'N, 2nd Lift 140'N, Subgrade 150'N, 1st Lift 160'N, 2nd Lift 230'N Subgrade 1 st Lift 2nd Lift Subgrade I st Lift 2nd Lift 1 26.1 92.2 93 1 25.7 92.1 93 I 25.6 92.5 93 1 25.9 92.6 93 1 25.6 92.8 93 1 25.3 92.9 93 1 26.0 92.1 93 1 25.7 92.6 93 1 25.5 92.4 93 1 25.6 92.0 93 I 25.5 92.4 93 I 25.3 92.5 93 This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.. 07TMP Page 1 of 2 Report No.: 9821497 ~ H~ TEST NO 83 84 85 86 87 88 TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pcO (% max) Southeast Corner 90'W & 180'N, Subgrade Southeast Corner 90'W & 170'N, 1 st Lift Southeast Corner 90'W & 160'N, 2nd Lift Southeast Corner 90'W & 60'N, Subgrade Southeast Corner 90'W & 50'N, I st Lift Southeast Comer 90'W & 40'N, 2nd Lift 1 25.9 92.2 93 1 25.7 92.4 93 1 25.6 92.7 93 I 25.9 92.4 93 1 25.7 92.6 93 l 25.6 92.8 93 Test results on this report meet project specification. Technician: Tex King Report Distribution: (l) Prentiss Properties Limited, Inc. (I) Alliance Architects, Inc. (1) Halff Associates (l} Mullen & Powell Technistructures. I ( 1 ) Butler Construction (1) City of Coppell (1) City of Coppell I"'l~ Engineering, Inc. Vice President This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2 FIN-PLACE DENSITY 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 08/15/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9821552 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 08/27/1998 Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Moisture % Maximum Density pcf Project Requirements Moistu re Density Lt. Brown to Tan Sandy Clay w/Gravel & Limestone Pieces 20.5 99.5 FIELD DENSITY TESTS +4% or Above 92% TEST NO TEST LOCATION M/D MOISTURE DRY DENSITY DENSITY No. (%) (pc0 (% max) 89 Southeast Comer of Pad, 60'W 90 Southeast Comer of Pad, 60'W 91 Southeast Comer of Pad, 60'W 92 Southeast Comer of Pad, 60'W 93 Southeast Comer of Pad, 60°W 94 Southeast Comer of Pad, 60'W 95 Southeast Comer of Pad, 60'W 96 Southeast Comer of Pad, 60'W 97 Southeast Comer of Pad, 60'W 98 Southeast Comer of Pad, 60'W 99 Southeast Comer of Pad, 60'W 100 Southeast Comer of Pad, 60'W & 502q, 4th Lift & 55~N, 3rd Lift & 100'N 4th Lift & 110'N 3rd Lift & 150'N 4th Lift & 155'N 3rd Lift & 200'N 4th Lif & 210'N 3rd Lift & 230'N 4th Lift & 240'N 3rd Lift & 270'N 4th Lift & 2602q 3rd Lift 1 25.9 92.9 93 1 25.7 93.1 94 1 25.6 92.5 93 1 25.8 92.8 93 1 25.3 92.9 93 1 25.6 93.0 94 1 25.7 92.8 93 1 25.9 93.0 94 1 25.5 92.7 93 1 25.8 93.1 94 1 25.6 92.9 93 1 25.8 93.0 94 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval Of HBC Engineering, Inc. 0TYMP Page I of 2 IN-PLACE DENSITY '2STING 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 08/17/1998 71765000 Prentiss Properties Limited, Inc. Attn: David Glass 3860 W. Northwest Hwy. Dallas TX 75220 Report No.: 9821673 Project No.: 43-2170-98 Project: Lakeview Center Coppell, Texas Report Date 08/27/1998 Services: In-place density testing. CONTU~,croR: Butler Construction PROJECT DATA Laboratory Test Method: AST]~ D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: M/D No. Description Maximum Moisture % Density pcf Project Requirements Moisture Density Lt. Brown to Tan Sandy Clay w/Gravel & Limestone Pieces 20.5 99.5 FIELD DENSITY TESTS +4% or Above 92% TEST NO 101 102 103 104 105 106 107 108 109 110 111 112 TEST LOCATION Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Southeast Comer of Pad, Northeast Comer of Pad, Northeast Comer of Pad, 50'W & 40'N, 6th Lift 50'W & 50'N, 5th Lift 50'W & 90'N, 6th Lift 50'W & 100'N, 5th Lift 50'W & 140'N, 6th Lift 50'W & 1502q, 5th Lift 50'W & 1902q, 6th Lift 50'W & 200'N, 5th Lift 50'W & 230'N, 6th Lift 50'W & 250'N, 5th Lift 60'W & 30'S, Subgrade 60'W & 40'S, 1 st Lift MfD MOISTURE DRY DENSITY DENSITY No. (%) (PCO (% max) 1 24.9 92.5 93 1 25.1 92.2 93 1 25.0 92.8 93 1 25.2 92.6 93 ! 25.0 92.5 93 1 25.3 92.5 93 1 25.1 92.9 93 1 25.5 92.6 93 1 25.2 93.0 94 1 25.3 92.8 93 1 25.7 92.5 93 1 25.5 92.2 93 This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval Of HBC Engineering, Inc. 07TMP Page I of 2 .- } eoon r o.: 982 673 "' TEST NO TEST LOCATION Northeast Comer of Pad, 60'W & 90'S, Subgrade 113 114 Northeast Comer of Pad, 60'W & 100'S 115 Northeast Comer of Pad, 60'W & 150'S 116 Northeast Comer of Pad, 60'W & 155'S 117 Northeast Comer of Pad, 60'W & 190'S 118 Northeast Comer of Pad, 60'W & 195'S 119 Northeast Comer of Pad, 60'W & 210'S 120 Northeast Comer of Pad, 60'W & 230'S M/D MOISTURE DRY DENSITY DENSITY No. (%) (PC0 (% max) 1 25.4 92.4 93 1 st Lift 1 25.6 92.2 93 Subgrade 1 25.8 92.4 93 1 st Lift 1 25.5 92.1 93 Subgrade 1 25.9 92.2 93 1st Lift 1 25.5 92.3 93 Subgrade 1 25.6 91.8 92 1 st Lift 1 25.4 92.0 93 Test results on this report meet project specification. Technician: Tex King Report Distribution: (1) Prentiss Properties Limited, inc. (I) Alliance Architects, Inc. (1) Halff Associates (1) Muilen & Powell Technistmctures, I (1) Butler Construction (1) City of Coppell (1) City of Coppell ~ Eng.. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2