Loading...
Park West CC(1)-LR 951113 reed engineering GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT 48 REPORT NO.: JOB NO.: Park West Commerce Center PROJECT: LOCATION: ARCHITECT/ENGINEER: McFadden & Miller CONTRACTOR: Marc Myers REPORTED TO: 2166.2 Panel leave-out - 150'S, 2'W of NE buildin9 corner DATE CAST: SPECIFICATION: QUANTITY REPRESENTED: 10/16/95 3000 PSI 30/90 yds S~.ED BY: B. Woolwine DATE: BY ORDER OF: 11/13/9s 10 / 23 / 95ORDE" NUMBER: Client (6 x 12 INCH) NOMINAL CYLINDER 81ZE: AREA-28.2~ SQ. IN. LABORATORY NUMBER FIELD NUMBER: PW101601 PW101602 PW101603 PW101604 82,600 111,300 113,300 7 28 28 2920 3940 4010 3980 MA~MUM LOAD. LBS: 82, 9 0 0 AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH, PSI: AVERAGE STRENGTH, PSI: 7 2930 2930 15'PE BREAK: CONICAL (U.N.O.) R~KS: Does comply with Specification METHOD OF CURING: FIELD DAYS, LABORATORY FROM 1 10/17/95 TEMPERATURE: AMBIENT ~IME OF ~AMPLE: 0 8: 3 5 ~U.CE OF CONCRSTE: TX I FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): Reed SLUMP 65 'F M~X 72 'F. AM/FJ~. TRANSPORTED BY AIR CONTENT %, 6 . 0 0 INCHES Y~ NO PICK-UP CHARGE: MiX CODE: 3 9 TICKET NO.: 4 7 3 0 6 3 UNIT WEIGHT PCF YIELD CF/CY D,Sm,SU~O,: (1) Marc Myers Company/Mr. Richard Crow (1) McFadden & Mi'ller Construction/Mr. Dave VanDemeE (1) Comerica Bank/Mr. Alan Williams (1) AECC, Inc./Mr. Andy Brundige () City of Coppell/Mr. Lee Stone ) City of Coppell/_Mr Larry ]~i,v~, 1~. TEST I~ETHODS: A~M C C 173, C 192, C 231, OR C 1064 PAGE I _ OF 1 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/35(~5600 · (FAX) 214/350~O019