Loading...
Northlake 635(7)-LR 980602 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: 05/'12/1998 Report No.: 9812177 Report Date 06/02/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Arm: David Glass Coppell, Texas CoPy 3890 W. N.W. Hx~9', Suite 400 Dallas TX 75220 Services: Drilled pier inspection. On uhis dane, an HBC Encineerinu 5echnician arrived at The above referenced ~cbsite as scheduled foror_l_=a' :~'- ~ pier inspection. See at~ached sheet for recorded data. Technician Time: 6:00am to 5:O0pm Technician: Terry L. Smith ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Halff Associates, Inc. (1) Butler Construction (1) City of Coppell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Con',:'actors Senior Project Engineer (1) Brockette Davis Drake, Inc. (1) City of Coppell This report is exclusively for the use of the client indicated abox e and shall not be :-eproduced except in f,.,ll without the written approval of HBC Engineering, Inc. 99TMP Page I of 1