Loading...
Park West CC(6)-CS 980820 August 20, 1998 Mr. Alex Rakisits Butler Construction, Inc. 2553 E. Loop 820 N. Fort Worth, TX 76118 Re: IBM Call Center Coppell, Texas Dear Alex: Per my conversations with Larry Davis, the following items are still outstanding and need to be completed before he will issue a final acceptance letter. 1. Control wire for traffic signals along Beltline was cut during excavation of the median turn land and needs to be repaired immediately. 2. "As built" information needs to be relayed to Dennis Chovan so he can revise his drawings accordingly and resubmit to the City. 3. The berm at the Beltline Road southbound right turn lane must not have a slope that exceeds 3:1. 4. All testing reports need to be sent to Larry Davis and Lee Stone. Items 1 and 2'are BCI's responsibility and need to be rectified immediately. Item 3 is currently being evaluated by PPL. HBC has been instructed to copy and transmit the testing reports in Item 4. Please notif3,' me irranediately when Items 1 and 2 are complete. Cc: Larry Davis (City of Coppell) Craig Anderson (IBM) Jerry Mays (PPL) Charles Reagan (Alliance Architects) File 9703-4.8.1 PRENTISS PROPERTIES 3860 WEST .NORTHWEST H!I,'¥.. S[1TE 400 DALLAS, TEXAS 75221) 214 654-0886 lrAX: 214 358-7122