Loading...
Park West CC(6)-CS 971205  Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 Jerry Mays ~~ December 5, 1997 Prentis Properties Limited, Inc. 1717 Main St., Suite 5000 Dallas, TX 75201 RE: Parkwest Commerce Center, Lot 1, Block 5 ( Replat of Lot 2, Block 5 & 6) Development Fee Assessment Dear Mr. Mays: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. The amount shown is an additional assessment do to the increased domestic meter size from a 2 inch to a 3 inch. Please make payment to the City of Coppell in the amount of $7,200.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griff.~_, P.E. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Parkwest Commerce Center, Lot 11, Block 5 (Replat of Lot 2, Block 5 & 6) Date: 12/5/97 REVISED TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee ** $3,600.00 $3,600.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $200.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,144.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) ~ - $5,114.18 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee ** $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee ** $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $13,893.68 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,200.00 ** See attached development fee worksheet DEVELOPMENT FEE WORKSHEET PROJECT: Parkwest Commerce Center, Lot 11, Block 5 (Replat of Lot 2, Block 5 & 6) DATE: 12/5/97 REVISED Water Impact Fee: Domestic Meter(s): 1 - 3 inch 16 ESU's Irrigation Meter(s): I - 2 inch 8 ESU's ESU's Fireline Meter(s): 2 - 8 inch 2.5 ESU's Total 8: 26.5 ESU's @ $450.00 ea. $11,925.00 (100% due prior to Council approval of the final plat) * (-$8,325.00) Water Tap Inspection Fee: Total 8: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total 8: 1 Domestic Meter(s) @ $1,144.50 $1,144.50 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total 8: I Irrigation Meter(s) @ $195.98 $195.98 Total 8: 0 Additional Irrigation Meter(s) @ $0.00 Total 8: 2 Fireline Meter(s) @ $2,459.10 $4,918.20 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total 8: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 8: 3 Meter(s) @ $35.00 ea. $105.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 16 @ $450.00 ea. $7,200.00 * (-$3,600.00) Wastewater Tap Inspection Fee: Total 8: I Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 8: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) * Previously Paid amount on 12/11/96 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150,00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $25,440.00 * (-$25,440.00) Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development conwacts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) · Previously Paid amount on 12/11/96 Page 2