September 27, 1996
Jerry Mays
Prentis Properties Limited, Inc.
1717 Main St. Suite 5000
Dallas, TX 75201
RE: Parkwest Commerce Center, Lot 1, Block 5 (Replat of Lot 2, Block 5 & 6)
Development Fee Assessment
Dear Mr Mays:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $37,365.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,
· P.E.
A~istant City Manager/City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
Dennis Chovan, Halff & Associates
DEVELOPMENT FEE TABLE
Project: Parkwest Commerce Center, Lot I, Block 5 (Replat of LOt 2, Block 5 & 6)
Date: 9/27/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $195.98
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $5,357.78
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $105.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $25,440.00 $25,440.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $43,353.76
TOTAL AMOUN~ DUE PRIOR TO COUNCIL APPROVAL $37,365.00
br2VELOPMENT FEE WORKSHEET
PROJECT: Parkwest Commerce Center, Lot 1, Block 5 (Replat of Lot 2, Block 5 & 6)
DATE: 9/27/96
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 8 ESU's
Irrigation Meter(s): I - 2 inch = 8 ESU's
= ESU's
Fireline Meter(s): 2 - 8 inch = 2.5 ESU's
Total #: 18.5 ESU's @ $450.00 ea. $8,325.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea. $200.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: I Domestic Meter(s) @ $195.98 $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @ $195.98 $195.98
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 2 Fireline Meter(s) @ $2,580.90 $5,161.80
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $35.00 ea. $105.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 8 @ $450.00 ea. $3,600.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
bC:VELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family ~ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $25,440.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: information not
Assessed for signage in the City's right-of-way, available at this dine
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submiual of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Parkwest Commerce Center, Lot I, Block 5 (Replat of Lot 2, Block $ & 6)
DATE: 9/27/96
ROADWAY IMPACT FEE:
Service Area * 10
Category ** Industrial
Land Use ** General Light Industrial
Building Size (Sq. Ft.) 320,000
Development Units ** 320
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $101,760.00
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
75 % Credit as per approval by City Manager = $76,320.00