Park West CC(6)-CS 960328 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Park West Cotntnerce Center. Replat of Lot 2. Block 5 and 6, to create
two new lots that will allow the development of a $20,000 square foot
offtce warehouse facility and a 200, 000 square foot offtce warehouse
building, located on 29.38 acres of property west of Belt_line Road,
between Airline and Wrangler Drives, at the request of Halff
Associates, Inc.
DRC DATE: March 28, 1996 and April 4, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679)
,/PRELIMINARY REVISED
ILt'TER P-&Z
Replat Comments
1. Show fire lanes, visibility triangle easements at all driveways.
2. Water, sanitary sewer and roadway impact fees will be required.
Site Plan
1. Show medians on Belt Line Road.
2. Show fire lanes.
3. Construct deceleration lanes at the driveway located at the southeast corner of Lot 1,
Block 5 (100' storage w/100' transition 12' wide). Also, the driveway should be a
shared driveway with the property to the south since it will probably have a median
opening.
4. Provide south bound deceleration lane 12' wide (100' storage w/100' transition) at Belt
Line Road/Wrangle drive.
5. Provide 40' radius for trucks at driveways adjacent to loading docks.
6. Provide water, wastewater, drainage and irrigation plans.
7. Any driveways onto Belt Line will be required to have brick pavers.