Park West CC(11)-CS000831DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Park West Commerce Center, Site Plan Amendment and Replat of Lots I & 3,
Block 7, to amend the existing Site Plan to construct two oj~ce/warehouse
buildings and revise the parMng and landscaping on approximately 6. 79 acres
of praperty located at the northeast corner of Enterprise and Wrangler Drives,
at the request of Pac Trust Pacific Realty Associates, L.D.
DRC DA TE: August 31, 2000 and September 3, 2000
CONTA CT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STATUS: v"PREL~ARY
As per the Subdivision Ordinance the minimum driveway spacing for a 40 mph street is
120'. Therefore the driveway at the southeast corner must be shifted west.