Loading...
Park West CC(11)-CS 980724David Littleton, P.E. Halff Associates 8616 Northwest Plaza Drive Dallas, TX 75225 Parkwest Commerce Center, Lots 1 & 3, Block Development Fee Assessment PO. Box 478 CoppelI, Texas 75019 972-462-0022 July 24, 1998 Dear Mr. Littleton: Enclosed is a copy of the City of Coppell Development Fee Assessment robie, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $21,083.40 and forward ,,o the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Parkwest Commerce Center, Lots 1 & 3, Block 7 Date: 7/24/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.15 (100% due at Issnance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,956.65 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Iss_uonce of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issoance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Iss,_ar~ce of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $9,158.40 $9,158.40 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts, TOTAL $27,657.20 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $21,083.40 PROJECT: DATE: DEVELOPMENT FEE WORKSHEET Parkwest Commerce Center, Lots 1 & 3, Block 7 7/24/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's I - 2 inch = 8 ESU's = ESU's 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Metar(s) @ (100% due prior to issuance of water meters) $192.15 $2,882.25 Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $8,325.00 $200.00 $192.15 $192.15 $0.00 $5,764.5O $35.00 $90.00 $3,600.00 $50.00 $50.00 Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: NIA N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $9,158.40 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 4 ROAD WAY IMPACT FEE CALCULA'iIONS PROJECT: DATE: 7/24/98 ROADWAY IMPACT FEE; Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** ee per Vehicle Mile *** adway Impact Fee due -- (Development Units) x ehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- 10 Industrial General Light Industrial 115,200 115.2 1.06 $300 $36,633.,6O * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 75 % Credit as per approval by City Manager $27,475.20