Park West CC(11)-CS 980619TEA UE NALL AND PERKINS
ENt~INEERS · SURVEYORS · MUNICIPAL CONSULTANTS
June 19, 1998
Mr. Michael A. Martin, P.E.
City of Coppeil
Engineering Depaxhi-,ent
P.O. Box 478
Coppell, Texas 75019
Re,'
Wrangler Drive Reconstruction Project (Project No. ST 96-01)
Proposed Plans for Park West Commerce Center
Dear Michael:
At your request, David Littleton of Haiff Associates provided us with plans for the two (2) proposed sites
at the intersection of Wrangler Drive and Enterprise Drive for our review (See attached letter of transmittal
from David Littleton). We have, therefore, performed a cursory review of these plans as they relate to
the Wrangler Drive design and offer the following comments:
Proposed Site at the Northwest Corner of Wrangler Drive and Enterprise Drive -
The proposed inlets along Wrangler Drive at Sm. 5+83.88 and Sta. 10+08 conflict with the
location of the proposed driveway improvements for this site. Halff Associates is proposing to
relocate these inlets further to the east to avoid the conflict. This will require the extension of the
21" RCP leads for both inlets as shown on the enclosed exhibits provided by David Littleton.
There does not appear to be any problems with the proposed inlet relocations. However, Halff
Associates will need to provide the centerline station for the new inlet locations and the revised
slope for the 21" leads.
The proposed landscape improvements at the intersection of Wrangler and Enterprise do not appear
to accommodate the proposed sidewalk ramp construction in the Wrangler Drive project or future
sidewalk improvements along Wrangler and Enterprise.
The alignment for Wrangler Drive was established with the understanding that an additional five
(5) feet of right-of-way would be dedicated along the frontage of this property when it developed.
However, the plat does not appear to reflect any additional right-of-way dedication.
Proposed Site at the Northeast Corner of Wrangler Drive and Enterprise Drive -
Halff Associates' storm drain Line "B" ties into the Wrangler Drive storm drain system via a
proposed 18" RCP stub-out at Sta. 18+75. However, the proposed drainage area for the Halff
Associates' Line "B" (2.53 acres) is slightly larger than the drainage area shown in the Wrangler
Drive design for the proposed 18" stub-out (1.80 acres). Halff's design, therefore, requires a 27"
pipe size rather than the 18" stub-out provided in the Wrangler Drive project.
Mr. Michael Martin, P.E. - City of Coppell
Wrangler Drive Reconstruction Project - Proposed Plans for Park West Conunerce Center
June 19, 1998
Page 2
We recommend that either: 1) the proposed drainage patterns on the subject site be revised to
better match the drainage areas in the Wrangler Drive plans or 2) that a portion of the storm drain
system in Wrangler Drive be increased in size to better accommodate the proposed drainage from
the subject site. To revise the Wrangler Drive system would require that 35 linear feet of 18" RCP
be increased to a 27" RCP stub-out at Sra. 18 +92.50 and that approximately 258 linear feet of 27"
RCP be increased to 30" RCP from Sra. 18-4-87.50 to Sra. 21 +50.
The proposed landscape improvements at the intersection of Wrangler and Enterprise do not appear
to accommodate the proposed sidewalk ramp construction in the Wrangler Drive project or future
sidewalk improvements along Wrangler and Enterprise.
The City may want to consider abandoning the existing sanitary sewer line along the east side of
Enterprise Drive at the intersection of Wrangler Drive, in conjunction with the Wrangler Drive
project or the proposed site development, since it appears that it is not needed for service to the
adjacent tracts.
Should you have any questions, please do not hesitate to give me a call.
Sincerely,
UE NALL AND PERKINS, INC.
XC:
B. David Littleton, P.E.
Halff Associates, Inc.
TO:
Engineers · Scientisls S~ 'rs
8616 Northwest Plaz~ Drive
Dallas, Texas 75225
214-739-0094 · FAX214-739-7086
Tesgue Nail & Perkins
916 Florence Street
Fort Worth, Texas 76102
LETTER OF TRANSMITTAL
DATE: June t8, t~8 [ AVO: 16906, 19607
A'~i~NTION: Mr. Mike Jones
RE: PARK WEST COMMERCE CENTER
WE ARE SENDING YOU _XB Attached Under Separate cover via the following items:
Shop Drawings Prints Plans Tracings Specifications
Copy of letter Change order Other
COPIES DATE NO. DESCRIPTION
I Set Blue Line Prints of Current Development Plans (Two Sites)
2 8-112" x 14" Sketch Showing New Inlet Locations
THESE ARE TRANSMITTED as checked below:
_ mFor approval
_ mFor your use
__.~ requested
For review and comment
Approved as submitted
Approved as noted
Returned for corrections
Resubmit
Submit
Return
copies for approval
copies for distribution
corrected prints
FOR BIDS DUE
PRINTS RETURNED AFTER LOAN TO US
COMMENTS: Mr. Jones, the encl0~ed plans do not Include required City revisions which are fairly minor and do
not affect the drive and Inlet locations. Please let me know if you need additional Information to accomplish this
change. Also, we may want to trY and coordinate a leave out location for the proposed drive approach locations.
We are developing paving plans for the two projects and will keep you informed with regard to the locations.
Please let me know your schedule regarding paving for this project. Thanksl
COPY TO:
SIGNED: B. David Littleton,
If enclosures am not es noted, kindly notify us at once.
MATCH
~LI E S Ai 5+0
32.5'
45'
I _Iii
!
.... ~ :'~111111' I
1'