Loading...
PA9601-LR 970430OILTECH ENGINEERING AND TESTING INC. 7415 White Hall, Suite ~109 Fort Worth. Texas 76118 Fax 817-595-0708 817-595-0064 SOIL MOISTURE - DENSITY TEST REPORT IN - PLACE TESTS BY NUCLEAR METHODS CLIENT: Pavement Construction & Maint. PROJECT: Copperstone Trail REPORT DATE: April 30, 1997 REPORT NO.: 97-058.104 Percent Compaction: Moisture Content (%): SPECIFICATIONS Don James TEST DATA CURVE TEST NO. METHOD 1 B698 2 A698 MATERIAL REFERENCE CURVE DATA MATERIAL DESCRIPTION MAX. DRY OPTIMUM DENSITY (pc1~ MOISTURE (%) Brown Sandy Clay w/gravel 123.8 10.7 Brown Dark Brown Sandy Clay 110.5 15.4 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017. RESPECTIVELY TEST LIFT OR REF. NO. ELEVATION LOCATION CURVE 1 Grade Trail 1+75 1 2 Grade Trail 4+95 2 3 Grade Trail 8+15 2 DRY DENSITY MOISTURE % Of MAX. (pcQ (%) DRY DENSITY 110.5 11.7 89* 95.0 20.4 86* 95.4 18.6 86* NUCLEAR GAUGE I.D.: STD. DENSITY COUNT: 3875 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. Remarks: STD, MOISTURE COUNT: 514 SO~T,~ECH ENLG..I__N,E~ERlyI'~' AND TESTING, INC. -/,~' ,,:/,~C~I'j ~- i' i' LL",~-c~9 Ja '~s M. Perdue rials Testing Manager