Loading...
Parkwood-CS 850823GINN, INC. CONSULTING ENGINEERS August 23, 1985 Mr. Sam Wyse General Homes Land Development 15301 Dallas Parkway, %1020 Dallas, TX 75248 Re: Parkwood Section II -- Final Acceptance Dear Mr. Wyse: A final inspection of the above referenced project has been confirmed by representatives of the Coppell Municipal Utility District #1, Ginn, Inc., and the City of Coppell. The utility and paving requirements are in compliance with standard requirements and are acceptable to the City of Coppell. As of this date, permits can be issued to start construction of the remaining homes with the limits of this phase. As-built drawings and one-year maintenance bonds have been received from both contractors. Maturity of the bonds will be one year from the date of completion for the following items: 1. Lower existing 12" water main and valve 2. Brick pavers at Parkway Boulevard - Samuels Boulevard Sincerely, H. Wayne Ginn, P.E. City Engineer RF/HWG/sr cc: Steve Goram Dean Youngblood Pierce-Lunsf0rd Associates Regional Utilities Southwestern Contracting Co. Randy Fleming 16135 Prcx:on Roafi · Suite 106 · Da!la~. 'l'cxa~ 7524~, · Phone 21-t :g86-661! For your information: Southwestern Contracting Co. 2720 Stemmons Freeway, %305 Dallas, TX 75207 631-1732 Regional Utilities 3901 Carbon Road P.O. Box 153186 Irving, TX 75015 252-6502