Park West CC(4)-LR 940520 (2) C(JNTRA CT INSPECTiOIV SEFIVlCE 75 GLENWOOD CT. PRE GRANBUR¥, TX 76049 (817) 3264384 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: M J Designs Corporate Headquarters Report No: 3151-4 Coppel], Texas Attention: Client: Terracon Date of Service: 05-20-94 12801Stemmons Freeway, Suite 907 Page 1 of 1 Dallas, TX 75234 REPORT OF INSPECTION Drawings utilized: Contract Documents / AWS D1.1-94 / AISC Locations/item inspected: 1) Roof decking spot we]ds and side ]ap screws at column line J to S, grid line I to 10. 2) Mezzanine level at Column line J.5 to S, grid 1 to 4. Discrepancies/Comments: 1) Visual welding inspection of roof decking spot welds - We]ds and lap screws are in compliance with job specifications and drawing. 2) a) Joist to beam welded connections - Welds comply. b) Beam to pane] pocket welded connections - Some of the weld lengths are less than those specified on sheet S402 detail 17. Also embed missing (south side) at R x 1. c) X bridging incomplete at this time. d) A325, 3/4 inch high strength (Tension Control Bo]ts) were used. Visual inspection is ali that is required for this type of bolt. Bolts have been properly tensioned except at R x 2 (W24 x 84), Q.5 x 2 (W33 x 118), Q x 2, P.5 x 2 and P x 2. These bo]ted connections were welded 100%. David Wheeler, CAWI #94010924 Contract Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced ~ithout ~ritten aoeroval from said client