Loading...
Park West CC(4)-LR 940513 (2) cCEIVED MAY25 199 CONTRA CT INSPECTION SERVICE 75 GLENWOOD CT. PRE GRANBURY, TX 76049 (817) 326-4384 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: M J Designs Corporate Headquarters Report No: 3146-4 Coppell, Texas Attention: Client: Terracon Date of Service: 05-13-94 12801Stemmons Freeway, Suite 907 Page 1 of 1 Dallas, TX 75234 REPORT OF INSPECTION Drawings utilized: Contract Documents / AWS D1.1-94. Locations/item inspected: Column line J to s, grid line 1 to 10 except at Q to S line between 4 to 6 this has not been erected at this inspection. Discrepancies/Comments: 1) Joist to panel pocket welded connections - Welds comply except at P.1 x 1, no embed at this location. 2) Joist to joist girder welded connections - Welds comply. 3) Joist girder to expansion side - One (1) joist girder welded on the expansion side at J x 9, contractor was advised of this condition. Expansion bolts (A325) with washers over slotted holes were properly installed and tacked. 4) Joist girder to column welded connections - Welds comply except for two (2) locations, erector will review these connections before decking. 5) Joist girder to panel pocket welded connections - Same condition as item 4. David Wheeler, CAWI 94010524 Contract Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced ,ithout written aDpr0val from said client