Loading...
Park West CC(4)-LR 940505 (2) CONTRACT INSPECTION SERVICE 75 GLENWOOD CT. PRE GRANBURY, TX 76049 (817) 326-4384 REPORT OF STRUCTURAL STEEL ERECT[ON INSPECTION Project: M J Designs Corporate Headquarters Report No: 3040-4 Coppell, Texas Attention: Client: Terracon Date of Service: 05-05-94 12801 Stemmons Freeway, Suite 907 Page 1 of 1 Dallas, TX 75234 REPORT OF INSPECTION Drawings utilized: Contract Documents / AWS D1.1-94 / AISC Locations/item inspected: Mezzanine level column line C to J.5 grid line I to 4. Roof level framing at column line A to J, 1 to 3. Discrepancies/Comments: MEZZANINE LEVEL Item 1 - Joist to beam welded connections - We]ds comply except at areas where joist have not been placed. Item 2 - Beam to tilt pane] welded connections - Erector needs to review these connections. We]ds need to be slaged and cleaned. Also the lengths are ]ess than those specified on sheet S402 detail 17. Item 3 - Bolts - A325 3/4 inch high strength tension control bolts were used. Visual inspection per AISC showed bolts properly tensioned except where the erector has not tensioned. ROOF LEVEL Item 1 - Joist girder to panel pocket - Welds comply. Item 2 - Joist to panel pocket - Welds comply. Item 3 - Joist to joist girder - Welds comply. Item 4 - Joist girder to column cap bolted connections - Welded in lieu of bolts. David Wheeler, CAW[ #94010524 This reD0rt is for the exclusive use of our client and shah no[ be ,0dified or re~r0duced ~ithout ,r~t[en apDr0va! fr0a said clien[