Loading...
Park West CC(4)-LR 940420 75GLENWOOD CT. PRE GRANBURY, TX76049 (817)326-4384 REPORT OF STRUCTURAL STEEL ERECTION INSPECTION Project: M J Designs Corporate Headquarters Report No: 3095-4/R Coppe11, Texas Attention: Eric Cleveland Client: Terracon Date of Service: 04-20-94 12801Stemmons Freeway, Suite 907 Page 1 of 1 Dallas, TX 75234 REPORT OF INSPECTION Drawings utilized: Contract Documents / Vulcraft's Deck Prints. Locations/item inspected: 1) Reinspection of Report 3024-4, dated 4-14-94. 2) Initial inspection of deck spot welds, grid line 10.2 to 17, column line G to d. Discrepancies/Con~nents: 1) Reinspection of deck spot welds noted as not meeting requirements in Report 3024, dated 04-14-94. We]ds have now been properly repaired. 2) Initial inspection - After corrections were made for a) missed welds b) welds with non-fusion and c) undersize we]ds, it was noted that this area of the roof deck has been properly welded. ~ LAP,,".',' 'L -~ .. ~. ~, ~,:r..~..-~: .~, Larry ~G./'Pee], CWI ~89120661 -~. ,:,,....:::'.; Contra~t Inspection Service This report is for the exclusive use of our client and shall not be mooifieo or reproduceO .ithout .ritten approval from saic client