Loading...
Park West CC(4)-LR 940221 'l rracon CONSULTANTS, INC. '.:':-'-Z ' -?- ........ ::":.i :-'-:-: .'.t~. ~.,-:.: :- - · Z' :: -_'.:::-:-.:' '~ :,~vL:-'E 7,1 ','. - ~" ". ::- ?: e-- .-:-' :- 5 ~:.-',:-':~ ': F-:- r,... 2-.-.:..-.'-.:: -:: February 21, 1994 Dupey Management Corporation 9015 Sterling Street Irving, Texas 75063 Attn: Mr. Robert McCann Re: M J Designs Distribution Center Coppell, Texas Job No. 17931033 Dear Mr. McCann: A Terracon Consultants, Inc. representative has continued to perform earthwork observation and testing services for the referenced project. This report covers the services performed from January 31 to February 19, 1994. Services provided during this period consisted of performing field density tests on select fill placed in the building area and compacted clay fill placed in the storm sewer and water line excavations. Concrete and drilled pier observation and testing has also been performed during this time period and the reports of these services are being transmitted separately. Results of the field density tests performed during this period are attached. Tests 410-418, 458- 462,478-485, and 514-519 were performed in the utility excavations. The remaining tests were performed on select fill placed in the building area and were referenced to the northwest building corner which was given an assumed station of 0 south and 0 east. Offices of The Terracon Companies. inc. Geotechnical, Environmental and Materials Engineers A'ZC'Sa -~:~C~ · Ccc'ace CcoracloSp-~gs D£-r-ve'. F: Cclqs. S'eee'F Lc.~gmc~! · Idaho, ~:3~e ' :~-ois B co-'fii*~:c~ Oh:sago Rock Is a~c · io,,..~ Ceca. F~: Sm Ce. la' Rao =s. Dace"cc': Dss Mc qes ~q;or~ _a-e KanSaS _ere~a Tc. oe~a. ','-,:.c-i:a · Miqqesc:a S' =ac · %-' -~sc¢'. Ka-.s=_s C :,- · '-J£-~'As-~a ' qco - C. ma-a 04 ahcr"a. C-::arc,'-na S ti,' T¢lsa · Tera$ Dal as · L:a': S~J: _a.-,e C :; · ',¥73m ¢~ '~,hc?ez¢'~e QUALITY ENGINEERING SINCE 1965 Dupey Management Corporation Job No. 17931033 February 21, 1994 If you have any questions regarding this report or it's attachments, please contact this office. Sincerely, TERRACON COt~SI~TA~S, INC. Eric J. Cleveland, P.E. Project Engineer EJC:kms Attachments Copy To: James, Harwick + Partners, Inc. Mr. Mark Wolf Albert Halff & Associates, Inc. Mr. Paul Rielly Bob Moore Construction, Inc. Mr. Phil Bell City of Coppell Mr. Michael Hodge 2 FIELD COMPACTION REPORT Job No. 1.7931033 Job Name and Location M.J. DESIGNS DISTRIBUI'ION ~ Date 2-19-94 Architect or Engineer JAMES, ~CK + PA.qlIqERS, INC. Contractor BOB MOORE CONSTRUCTION, INC. - -- - Datum SITE DATUM Lift #o. Maximu~ In-Ptace ln-Ptace Test Date Location or Mt[. Lab Dry Uet Uater Dry Percent Cora~ents No. Etev. Hark Density Density Content Density Comp. 378 1-31 280 - S LIFT 3 E 125.0 133.6 9.3 122.2 98 310 - E 379 1-31 250 - S LIFT 3 E 125.0 131.2 9.0 120.3 96 410 - E 380 1-31 250 - S LIFT 3 E 125.0 132.3 9.8 120.4 96 510 - E 381 1-31 200 - S LIFT 3 E 125.0 131.9 9.1 120.8 97 570 - E 382 1-31 190 - S LIFT 3 E 125.0 133.7 9.3 122.3 98 450 - E 383 1-31 190 - S LIFT 3 E 125.0 132.5 9.5 121.0 97 390 - E 384 1-31 170 - S LIFT 3 E 125.0 133.0 9.0 122.0 98 540 - E 385 2-1 260 - S GRADE E 125.0 130.5 9.2 119.5 96 320 - E 386 2-1 260 - $ GRADE E 125.0 132.2 9.4 120.8 97 410 - E 387 2-1 260 - S GRADE E 125.0 131.0 9.1 120.0 96 510 - E 388 2-1 210 - s 570 - E GRADE E 125.0 130.8 9.6 119.3 95 389 2-1 170 - S 510 - E GRADE E 125.0 133.6 10.2 121.2 97 390 2-1 170 - S GRADE E 125.0 131.5 9.1 120.5 96 420 - E 391 2-1 170 - $ GRADE E 125.0 132.0 9.& 120.6 96 33O - E 392 2-2 130 - S LIFT 3 E 125.0 131.3 9.1 120.3 96 320 - E 393 2-2 130 - s 440 - E LIFT 3 E 125.0 133.0 9.5 121.4 97 394 2-2 130 - S LIFT 3 E 125.0 131.8 9.0 120.9 97 550 - E 395 2-2 80 - S LIFT 3 E 125.0 132.6 9.2 121.4 97 570 - E 396 2-2 80 - S LIFT 3 E 125.0 133.2 9.2 121.9 98 450 - E 397 2-2 80 - S 340 - E LIFT 3 E 125.0 131.9 9.0 121.0 97 398 2-2 30 - s 320 - E LIFT 3 E 125.0 133.5 9.5 121.9 98 399 2-2 30 - s 440 - E LIFT 3 E 125.0 132.5 9.3 121.2 97 400 2-2 30 - s 550 - E LIFT 3 E 125.0 133.6 9.2 122.3 98 401 2-3 130 - s 320 - E GRADE E 125.0 133.5 9.0 122.4 98 402 2-3 130 - S GRADE E 125.0 133.0 9.2 121.7 97 440 - E 403 2-3 130 - s 550 - E GRADE E 125.0 131.3 9.1 120.3 96 404 2-3 80 - S 570 - E GRADE E 125.0 132.6 9.2 121.4 97 NOTES: Densities sho,n: pounds per cubic foot Nater Content: Percent of dry,eight ] brracon Percent Compaction: Based on maximum dry density obtained on sampte indicated by materia[ mark. FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location M.J. DESIGNS DISTRIBUI~ON ~ Date 2-19-94 Architect or Engineer JAMES, HARPIICK + PARTNERS, INC. Contractor BOB MOORE (X)NSTRLK21~ON, INC. Datum SITE DA~TIM Lift No. Maximum ln-Ptace In-Ptace Test Date Location or Ht[. Lab Dry get Water Dry Percent Coneents No. E[ev. Hark Density Density Content Density Comp. 80 - S GRADE E 125.0 133.5 9.5 121.9 98 605 2-3 450 - E 606 2-3 80 - S GRADE E 125.0 131.8 9.0 120.9 97 340 - E 407 2-3 30 - S GRADE E 125.0 134.0 9.7 122.1 98 320 - E 408 2-3 30 - S GRADE E 125.0 132.6 9.2 121.6 97 440 - E 409 2-3 30 - S GRADE E 125.0 133.0 9.5 121.4 97 550 - E 410 2-3 STATION 8+00 GRADE C 98.5 119.7 26.3 94.8 96 STORM 411 2-3 STATION 8+50 GRADE C 98.5 119.0 26.0 94.4 96 STORM 412 2-3 STATION 9+00 GRADE C 98.5 118.8 26.1 94.2 96 STORM 413 2-3 STATION 9+50 GRADE C 98.5 120.3 26.0 95.5 97 STORM 414 2-3 STATION 10+00 GRADE C 98.5 119.5 26.5 94.5 96 STORM 415 2-4 STATION 10+50 GRADE C 98.5 120.3 26.1 95.4 97 STORM 416 2-4 STATION 11+00 GRADE C 98.5 119.5 26.0 94.8 96 STORM 417 2-4 STATION 11+50 GRADE C 98.0 119.0 26.3 94.2 96 STORM 418 2-4 STATION 12+00 GRADE C 98.0 121.5 27.0 95.7 98 STORM 419 2-4 590 - S GRADE E 125.0 131.9 9.0 121.0 97 20 - E 420 2-4 530 - S GRADE E 125.0 133.0 9.5 121.4 97 110 - E 421 2-4 590 - S GRADE E 125.0 131.3 9.1 120.3 96 170 - E 422 2-4 530 - S GRADE E 125.0 132.6 9.2 121.4 97 230 - E 423 2-4 590 - S 280 - E GRADE E 125.0 133.2 9.2 121.9 98 424 2-5 490 - S LIFT 2 E 125.0 134.7 9.8 122.6 98 280 - E 425 2-5 420 - S 280 - E LIFT 2 E 125.0 131.5 9.2 120.4 96 426 2-5 350 - S 280 - E LIFT 2 E 125.0 133.0 9.0 122.0 98 427 2-5 270 - S LIFT 2 E 125.0 132.6 9.4 121.2 97 280 - E 428 2-5 270 - S LIFT 2 E 125.0 133.1 9.0 122.1 98 190 - E 429 2-5 350 - S LIFT 2 E 125.0 132.4 9.1 121.3 97 180 - E 430 2-5 420 - S LIFT 2 E 125.0 133.6 9.5 122.0 98 180 - E 431 2-5 490 - S LIFT 2 E 125.0 132.5 9.3 121.2 97 180 - E NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry .eight ~ For?aeon Percent Compaction: Based on maximu~dry density obtained on sample indicated by material mark. FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location M.J. DESIGNS DISTRIBUTION ~ Date 2-19-94 Architect or Engineer JAMES, HARW-ICK + PARINERS, INC. Contractor BOB MOORE ODNSWRIJCTION, INC. Datum SITE DA~3M Lift No. Maximu~ ln-Ptace In-Ptace Test Date Location or Ntt. Lab Dry Wet Water Dry Percent Comments No. Etev. Mark Density Density Content Density Comp. 432 2-7 90 - S LIFT 2 E 125.0 130.5 9.0 119.7 96 40 - E 433 2-7 90 - S LIFT 2 E 125.0 133.2 9.2 121.9 98 130 - E 90 - S LIFT 2 E 125.0 131.5 9.6 119.9 96 434 2-7 270 - E 30 - S LIFT 2 E 125.0 132.8 9.5 121.2 97 435 2-? 270 - E 436 2-7 30 - s 150 - E LIFT 2 E 125.0 131.? 9.3 120.4 96 437 2-7 30 - S LIFT 2 E 125.0 133.0 9.5 121.4 9? 40 - E 438 2-? 130 - S LIFT 2 E 125.0 133.8 9.5 122.1 98 170 - E 439 2-7 130 - S LIFT 2 E 125.0 130.5 9.0 119.7 96 270 - E 150 - E LIFT 2 E 125.0 133.0 9.3 121.6 97 440 2-? 230 - S 230 - S LIFT 2 E 125.0 132.6 9.0 121.6 97 441 2-7 180 - E 442 2-7 220 - S LIFT 2 E 125.0 131.5 9.1 120.5 96 26O - E 463 2-7 500 - S LIFT 3 E 125.0 133.5 9.& 122.0 98 290 - E 400 - S LIFT 3 E 125.0 130.5 9.0 119.? 96 444 2-7 250 - E 300 - S LIFT 3 E 125.0 132.0 9.2 120.8 445 2-7 290 - E 200 - S LIFT 3 E 125.0 132.2 9.3 120.9 97 446 2-7 290 - E 100 - S LIFT 3 E 125.0 134.0 9.0 122.9 98 447 2-7 290 - E 448 2-? 10 - S LIFT 3 E 125.0 133.5 9.1 122.3 98 230 - E 449 2-7 110 - S 240 - E LIFT 3 E 125.0 130.8 9.3 119.6 96 450 2-7 110 - S LIFT 3 E 125.0 132.6 9.5 121.0 97 240 - E 320 - S LIFT 3 E 125.0 133.3 9.1 122.1 98 451 2-7 240 - E 410 - S LIFT 3 E 125.0 132.0 9.5 120.5 96 452 2-7 240 - E 453 2-7 480 - S LIFT 3 E 125.0 134.5 9.6 122.? 98 170 - E 454 2-7 380 - S LIFT 3 E 125.0 132.2 9.0 121.2 97 170 - E 455 2-7 280 - S LIFT 3 E 125.0 133.9 9.8 121.9 98 170 - E 456 2-7 160 - S LIFT 3 E 125.0 131.1 9.0 120.2 96 170 - E 457 2-7 60 - S LIFT 3 E 125.0 132.6 9.5 121.0 97 170 - E 458 2-7 STATION 12+50 GRADE C 98.5 121.& 26.5 96.0 97 STORM NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry welght I E~rracon Percent Compaction: Based on maximum dry density obtained on sampte indicated by materia[ mark. FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location M.J. DESIGNS DISTRIBt/I'ION ~ Date 2-19-94 Architect or Engineer JAMES, HARW-ICK + PARIIqERS, INC. Contractor BOB MOORE OONSTRUCTION, Datum SITE DA~T~I Lift No. Maximum In-Ptace ln-Ptace Test Date Location or Mt[. Lab Dry ~et Water Dry Percent Comnents No. E[ev. Mark Density Density Content Density Comp. 459 2-7 STATION 13+00 GRADE C 98.5 119.1 26.0 94.5 96 STORM 460 2-7 STATION 13+50 GRADE C 98.5 121.0 25.8 96.2 98 STORM 461 2-7 STATION 14+00 GRADE C 98.5 118.8 26.0 94.3 96 STORM 462 2-7 STATION 14+50 GRADE C 98.5 121.3 26.2 96.1 98 STORM 500 - S GRADE E 125.0 131.2 9.1 120.2 96 463 2-8 280 - S 400 - S GRADE E 125.0 133.5 9.3 122.1 98 464 2-8 280 - E 465 2-8 300 - S GRADE E 125.0 131.8 9.0 120.9 97 280 - E 466 2-8 200 - S GRADE E 125.0 132.5 9.2 121.3 9r 280 - E 467 2-8 100 - S GRADE E 125.0 133.9 9.4 122.3 98 280 - E 468 2-8 10 - S GRADE E 125.0 131.6 9.1 120.6 96 230 - E 469 2-8 110 - S GRADE E 125.0 133.0 9.0 122.0 98 230 - E 210 - S GRADE E 125.0 132.5 9.4 121.1 470 2-8 230 - E 471 2-8 310 - S GRADE E 125.0 131.6 9.1 120.6 96 230 - E 472 2-8 410 - S GRADE E 125.0 134.0 9.5 122.3 98 230 - E 500 - S GRADE E 125.0 133.5 9.5 121.9 98 47'5 2-8 170 - E 474 2-8 390 - S GRADE E 125.0 132.6 9.1 121.5 97 170 - E 475 2-8 290 - S GRADE E 125.0 131.8 9.0 120.9 97 170 - E 476 2-8 190 - S GRADE E 125.0 134.5 9.8 122.4 98 170 - E 477 2-8 90 - S GRADE E 125.0 132.5 9.2 121.3 97 170 - E 478 2-8 STATION 0+50 LIFT 1 C 98.5 120.6 26.5 95.3 97 STORM 479 2-8 STATION 1+00 LIFT 1 C 98.5 118.5 26.0 94.0 95 STORM 480 2-8 STATION 1+50 LIFT 1 C 98.5 119.0 26.8 93.8 95 STORM 481 2-8 STATION 2+00 LIFT 1 C 98.5 121.0 27.3 95.1 96 STORM 482 2-8 STATION 0+50 GRADE C 98.5 120.1 26.2 95.2 97 STORM 483 2-8 STATION 1+00 GRADE C 98.5 122.9 27.3 96.5 98 STORM 484 2-8 STATION 1+50 GRADE C 98.5 121.4 26.1 96.3 98 STORM 485 2-8 STATION 2+00 GRADE C 98.5 122.5 27.0 96.5 98 STORM NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry weight ] E~rracan Percent Compaction: Based on maximum dry density obtained on sample indicated by materia[ mark. FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location M.J. DI~iTGNS DTSTR~BUTXON ~ Date 2-19-94 Architect or Engineer Contractor BOB MOOR~ CON~~ON, INC. Datum SITE DA2~3M Lift No. Maximc~ In-PLace In-PLace Teat Date Location or Htr. Lab Dry get Water Ory Percent Conments No. E[ev. Hark Density Density Content Density Comp. 486 2-12 500 - S 130 - E LIFT 2 E 125.0 131.5 9.4 120.2 96 487 2-12 400 - S 130 - E LIFT 2 E 125.0 133.8 9.5 122.1 98 488 2-12 300 - S LIFT 2 E 125.0 132.0 9.0 121.1 97 130 - E 489 2-12 200 - S 130 - E LIFT 2 E 125.0 134.0 9.3 122.5 98 490 2-12 100 - S LIFT 2 E 125.0 131.7 9.0 120.8 97 130 - E 491 2-12 30 - S 70 - E LIFT 2 E 125.0 133.3 9.6 121.6 97 492 2-12 100 - S LIFT 2 E 125.0 132.9 9.1 121.8 97 30 - E 493 2-12 200 - 30 - E LIFT 2 E 125.0 131.5 9.0 120.6 96 49~ 2-12 300 - S 30 - E LIFT 2 E 125.0 132.0 9.5 120.5 96 495 2-12 400 - S LIFT 2 E 125.0 134.2 9.1 123.0 98 30 - E 496 2-12 500 - $ 30 - E LIFT 2 E 125.0 132.6 9.3 121.3 97 497 2-12 450 - S 80 - E LIFT 2 E 125.0 134.2 9.3 122.? 98 498 2-14 190 - S 120 - E LIFT 3 E 125.0 133.9 9.6 122.1 98 499 2-14 120 - S 120 - E LIFT 3 E 125.0 132.1 9.2 120.9 97 500 2-14 30 - S 110 - E LIFT 3 E 125.0 134.0 9.5 122.3 98 501 2-16 20 - S LIFT 3 E 125.0 133.5 9.9 121.4 97 40 - E 502 2-14 90 - S LIFT 3 E 125.0 132.8 9.3 121.5 97 40 - E 503 2-14 160 - S 40 - E LIFT 3 E 125.0 131.6 9.1 120.6 96 504 2-15 230 - S LIFT 3 E 125.0 134.5 9.5 122.8 98 120 - E 505 2-15 300 - S 120 - E LIFT 3 E 125.0 131.0 9.1 120.0 96 506 2-15 400 - S 120 - E LIFT 3 E 125.0 133.8 9.6 122.0 98 507 2-15 480 - S 120 - E LIFT 3 E 125.0 133.0 9.0 122.0 98 508 2-15 480 - S 50 - E LIFT 3 E 125.0 132.r 9.5 121.1 97 509 2-16 60 - s GRADE E 125.0 132.0 9.3 120.7 120 - E 510 2-16 150 - S 120 - E GRADE E 125.0 133.4 9.0 122.3 98 511 2-16 250 - S 120 - E GRADE E 125.0 132.2 9.2 121.0 97 512 2-16 350 - S 120 - E GRADE E 125.0 131.3 9.3 120.1 96 NOTES: Densities sho~: pounds per cubic foot Water Content: Percent of dry geight ] Ferracan Percent Compaction: Based on maximum dry density obtained on sample indicated by materiaL mark. FIELD COMPACTION REPORT Job No. 1793~1033 Job Name and Location FI. 3. DESIGNS D~ISTRIBUTIOI~I ~ Date 2-19-94 Architect or Engineer JAMES~ HARW-ICK + P~~ INC. Contractor BOB FIDORE CEg/~GN, INC. Datum SITE DATUM Lift No. Maximum In-Place In-Ptace Test Date Location or Mt[. Lab Dry Net Water Dry Percent Coe~nents No. Etev. Mark Oensity Density Content Density Comp. 513 2-16 450 - S GRADE E 125.0 133.6 9.6 121.8 97 120 - E 514 2-16 STATION 28+00 LIFT 1 C 98.5 119.3 26.3 94.5 96 WATER 515 2-16 STATION 28+00 LIFT 2 C 98.5 121.5 27.0 95.7 97 ~ATER 516 2-16 STATION 28+00 GRADE C 98.5 120.0 26.6 94.8 96 WATER 517 2-16 STATION 26+00 LIFT 1 C 98.5 121.3 26.4 96.0 97 WATER 518 2-16 STATION 26+00 LIFT 2 C 98.5 123.0 26.0 97.6 99 WATER 519 2-16 STATION 26+00 GRADE C 98.5 122.4 26.5 96.8 98 WATER 520 2-17 500 - S 70 - E LIFT 3 E 125.0 133.6 9.6 121.8 521 2-17 400 - S 70 - E LIFT 3 E 125.0 132.2 9.2 121.0 97 522 2-17 300 - S LIFT 3 E 125.0 132.0 9.3 120.7 70 - E 523 2-17 200 - S 70 - E LIFT 3 E 125.0 133.3 9.5 121.7 97 524 2-17 100 - s LIFT 3 E 125.0 132.8 9.2 121.6 97 70 - E 525 2-17 20 - S LIFT 3 E 125.0 134.9 9.7 122.9 98 40 - E 526 2-17 100 - S 10 - E LIFT 3 E 125.0 132.5 9.4 121.1 527 2-17 200 - S LIFT 3 E 125.0 133.0 9.1 121.9 98 10 - E 528 2-17 300 - S LIFT 3 E 125.0 132.6 9.4 121.2 97 10 - E 529 2-17 400 - S LIFT 3 E 125.0 133.0 9.0 122.0 98 20 - E 530 2-17 500 - S 10 - E LIFT 3 E 125.0 132.9 9.4 121.4 97 531 2-19 500 - S GRADE E 125.0 132.8 9.2 121.6 70 - E 532 2-19 400 - S GRADE E 125.0 133.0 9.1 121.9 98 70 - E 533 2-19 300 - S GRADE E 125.0 133.3 9.5 121.7 97 70 - E 534 2-19 200 - S 70 - E GRADE E 125.0 132.6 9.4 121.2 97 535 2-19 100 - S 70 - E GRADE E 125.0 133.6 9.6 121.8 97 536 2-19 20 - S 40 - E GRADE E 125.0 132.5 9.4 121.1 97 537 2-19 100 - S 10 - E GRADE E 125.0 132.0 9.3 120.7 97 538 2-19 200 - S GRADE E 125.0 132.6 9.4 121.2 97 10 - E 539 2-19 300 - S 10 - E GRADE E 125.0 132.2 9.2 121.0 97 NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry ueight ] rerracon Percent Compaction: Based on maximum dry density obtained on sampte indicatedbymateriat mark. FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location M.J. DESIGNS DISTRIBIJI~ON ~ Date 2-19-94 Architect or Engineer __JP241~, ~CK + PARIIqERS, lRqC. Contractor BOB MOORE CONS2~UCTION, INC. Datu, n S_ITE DATUM Lift No. Maximum In-Place In-Ptace Test Date Location or Hit. Lab Dry Net Water Dry Percent Comments No. Eiev. Hark Density Density Content Density Comp. 400 - S GRADE E 125.0 133.4 9.5 121.8 97 540 2-19 10 - E 500 - $ GRADE E 125.0 132.0 9.3 120.? 97 541 2-19 10 - E NOTES: Densities shoun: pounds per cubic foot 14ater Content: Percent of dry ueight ] brracan Percent Compaction: Based on maxinun dry density obtained on sampte indicated by materJat mark.