Park West CC(4)-LR 940221 'l rracon
CONSULTANTS, INC.
'.:':-'-Z ' -?- ........ ::":.i :-'-:-: .'.t~. ~.,-:.: :- -
· Z' :: -_'.:::-:-.:' '~
:,~vL:-'E 7,1 ','. - ~" ". ::-
?: e-- .-:-' :- 5 ~:.-',:-':~ ': F-:-
r,... 2-.-.:..-.'-.:: -::
February 21, 1994
Dupey Management Corporation
9015 Sterling Street
Irving, Texas 75063
Attn: Mr. Robert McCann Re: M J Designs Distribution Center
Coppell, Texas
Job No. 17931033
Dear Mr. McCann:
A Terracon Consultants, Inc. representative has continued to perform earthwork observation and
testing services for the referenced project. This report covers the services performed from
January 31 to February 19, 1994. Services provided during this period consisted of performing
field density tests on select fill placed in the building area and compacted clay fill placed in the
storm sewer and water line excavations. Concrete and drilled pier observation and testing has
also been performed during this time period and the reports of these services are being
transmitted separately.
Results of the field density tests performed during this period are attached. Tests 410-418, 458-
462,478-485, and 514-519 were performed in the utility excavations. The remaining tests were
performed on select fill placed in the building area and were referenced to the northwest building
corner which was given an assumed station of 0 south and 0 east.
Offices of The Terracon Companies. inc. Geotechnical, Environmental and Materials Engineers
A'ZC'Sa -~:~C~ · Ccc'ace CcoracloSp-~gs D£-r-ve'. F: Cclqs. S'eee'F Lc.~gmc~! · Idaho, ~:3~e
' :~-ois B co-'fii*~:c~ Oh:sago Rock Is a~c · io,,..~ Ceca. F~: Sm Ce. la' Rao =s. Dace"cc': Dss Mc qes ~q;or~ _a-e
KanSaS _ere~a Tc. oe~a. ','-,:.c-i:a · Miqqesc:a S' =ac · %-' -~sc¢'. Ka-.s=_s C :,- · '-J£-~'As-~a ' qco - C. ma-a
04 ahcr"a. C-::arc,'-na S ti,' T¢lsa · Tera$ Dal as · L:a': S~J: _a.-,e C :; · ',¥73m ¢~ '~,hc?ez¢'~e
QUALITY ENGINEERING SINCE 1965
Dupey Management Corporation
Job No. 17931033
February 21, 1994
If you have any questions regarding this report or it's attachments, please contact this office.
Sincerely,
TERRACON COt~SI~TA~S, INC.
Eric J. Cleveland, P.E.
Project Engineer
EJC:kms
Attachments
Copy To: James, Harwick + Partners, Inc.
Mr. Mark Wolf
Albert Halff & Associates, Inc.
Mr. Paul Rielly
Bob Moore Construction, Inc.
Mr. Phil Bell
City of Coppell
Mr. Michael Hodge
2
FIELD COMPACTION REPORT
Job No. 1.7931033
Job Name and Location M.J. DESIGNS DISTRIBUI'ION ~ Date 2-19-94
Architect or Engineer JAMES, ~CK + PA.qlIqERS, INC.
Contractor BOB MOORE CONSTRUCTION, INC.
- -- - Datum SITE DATUM
Lift #o. Maximu~ In-Ptace ln-Ptace
Test Date Location or Mt[. Lab Dry Uet Uater Dry Percent Cora~ents
No. Etev. Hark Density Density Content Density Comp.
378 1-31 280 - S LIFT 3 E 125.0 133.6 9.3 122.2 98
310 - E
379 1-31 250 - S LIFT 3 E 125.0 131.2 9.0 120.3 96
410 - E
380 1-31 250 - S LIFT 3 E 125.0 132.3 9.8 120.4 96
510 - E
381 1-31 200 - S LIFT 3 E 125.0 131.9 9.1 120.8 97
570 - E
382 1-31 190 - S LIFT 3 E 125.0 133.7 9.3 122.3 98
450 - E
383 1-31 190 - S LIFT 3 E 125.0 132.5 9.5 121.0 97
390 - E
384 1-31 170 - S LIFT 3 E 125.0 133.0 9.0 122.0 98
540 - E
385 2-1 260 - S GRADE E 125.0 130.5 9.2 119.5 96
320 - E
386 2-1 260 - $ GRADE E 125.0 132.2 9.4 120.8 97
410 - E
387 2-1 260 - S GRADE E 125.0 131.0 9.1 120.0 96
510 - E
388 2-1 210 - s
570 - E GRADE E 125.0 130.8 9.6 119.3 95
389 2-1 170 - S
510 - E GRADE E 125.0 133.6 10.2 121.2 97
390 2-1 170 - S GRADE E 125.0 131.5 9.1 120.5 96
420 - E
391 2-1 170 - $ GRADE E 125.0 132.0 9.& 120.6 96
33O - E
392 2-2 130 - S LIFT 3 E 125.0 131.3 9.1 120.3 96
320 - E
393 2-2 130 - s
440 - E LIFT 3 E 125.0 133.0 9.5 121.4 97
394 2-2 130 - S LIFT 3 E 125.0 131.8 9.0 120.9 97
550 - E
395 2-2 80 - S LIFT 3 E 125.0 132.6 9.2 121.4 97
570 - E
396 2-2 80 - S LIFT 3 E 125.0 133.2 9.2 121.9 98
450 - E
397 2-2 80 - S
340 - E LIFT 3 E 125.0 131.9 9.0 121.0 97
398 2-2 30 - s
320 - E LIFT 3 E 125.0 133.5 9.5 121.9 98
399 2-2 30 - s
440 - E LIFT 3 E 125.0 132.5 9.3 121.2 97
400 2-2 30 - s
550 - E LIFT 3 E 125.0 133.6 9.2 122.3 98
401 2-3 130 - s
320 - E GRADE E 125.0 133.5 9.0 122.4 98
402 2-3 130 - S GRADE E 125.0 133.0 9.2 121.7 97
440 - E
403 2-3 130 - s
550 - E GRADE E 125.0 131.3 9.1 120.3 96
404 2-3 80 - S
570 - E GRADE E 125.0 132.6 9.2 121.4 97
NOTES: Densities sho,n: pounds per cubic foot
Nater Content: Percent of dry,eight ] brracon
Percent Compaction: Based on maximum dry density obtained on
sampte indicated by materia[ mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRIBUI~ON ~ Date 2-19-94
Architect or Engineer JAMES, HARPIICK + PARTNERS, INC.
Contractor BOB MOORE (X)NSTRLK21~ON, INC.
Datum SITE DA~TIM
Lift No. Maximum ln-Ptace In-Ptace
Test Date Location or Ht[. Lab Dry get Water Dry Percent Coneents
No. E[ev. Hark Density Density Content Density Comp.
80 - S GRADE E 125.0 133.5 9.5 121.9 98
605 2-3 450 - E
606 2-3 80 - S GRADE E 125.0 131.8 9.0 120.9 97
340 - E
407 2-3 30 - S GRADE E 125.0 134.0 9.7 122.1 98
320 - E
408 2-3 30 - S GRADE E 125.0 132.6 9.2 121.6 97
440 - E
409 2-3 30 - S GRADE E 125.0 133.0 9.5 121.4 97
550 - E
410 2-3 STATION 8+00 GRADE C 98.5 119.7 26.3 94.8 96 STORM
411 2-3 STATION 8+50 GRADE C 98.5 119.0 26.0 94.4 96 STORM
412 2-3 STATION 9+00 GRADE C 98.5 118.8 26.1 94.2 96 STORM
413 2-3 STATION 9+50 GRADE C 98.5 120.3 26.0 95.5 97 STORM
414 2-3 STATION 10+00 GRADE C 98.5 119.5 26.5 94.5 96 STORM
415 2-4 STATION 10+50 GRADE C 98.5 120.3 26.1 95.4 97 STORM
416 2-4 STATION 11+00 GRADE C 98.5 119.5 26.0 94.8 96 STORM
417 2-4 STATION 11+50 GRADE C 98.0 119.0 26.3 94.2 96 STORM
418 2-4 STATION 12+00 GRADE C 98.0 121.5 27.0 95.7 98 STORM
419 2-4 590 - S GRADE E 125.0 131.9 9.0 121.0 97
20 - E
420 2-4 530 - S GRADE E 125.0 133.0 9.5 121.4 97
110 - E
421 2-4 590 - S GRADE E 125.0 131.3 9.1 120.3 96
170 - E
422 2-4 530 - S GRADE E 125.0 132.6 9.2 121.4 97
230 - E
423 2-4 590 - S
280 - E GRADE E 125.0 133.2 9.2 121.9 98
424 2-5 490 - S LIFT 2 E 125.0 134.7 9.8 122.6 98
280 - E
425 2-5 420 - S
280 - E LIFT 2 E 125.0 131.5 9.2 120.4 96
426 2-5 350 - S
280 - E LIFT 2 E 125.0 133.0 9.0 122.0 98
427 2-5 270 - S LIFT 2 E 125.0 132.6 9.4 121.2 97
280 - E
428 2-5 270 - S LIFT 2 E 125.0 133.1 9.0 122.1 98
190 - E
429 2-5 350 - S LIFT 2 E 125.0 132.4 9.1 121.3 97
180 - E
430 2-5 420 - S LIFT 2 E 125.0 133.6 9.5 122.0 98
180 - E
431 2-5 490 - S LIFT 2 E 125.0 132.5 9.3 121.2 97
180 - E
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry .eight ~ For?aeon
Percent Compaction: Based on maximu~dry density obtained on
sample indicated by material mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRIBUTION ~ Date 2-19-94
Architect or Engineer JAMES, HARW-ICK + PARINERS, INC.
Contractor BOB MOORE ODNSWRIJCTION, INC.
Datum SITE DA~3M
Lift No. Maximu~ ln-Ptace In-Ptace
Test Date Location or Ntt. Lab Dry Wet Water Dry Percent Comments
No. Etev. Mark Density Density Content Density Comp.
432 2-7 90 - S LIFT 2 E 125.0 130.5 9.0 119.7 96
40 - E
433 2-7 90 - S LIFT 2 E 125.0 133.2 9.2 121.9 98
130 - E
90 - S LIFT 2 E 125.0 131.5 9.6 119.9 96
434 2-7 270 - E
30 - S LIFT 2 E 125.0 132.8 9.5 121.2 97
435 2-? 270 - E
436 2-7 30 - s
150 - E LIFT 2 E 125.0 131.? 9.3 120.4 96
437 2-7 30 - S LIFT 2 E 125.0 133.0 9.5 121.4 9?
40 - E
438 2-? 130 - S LIFT 2 E 125.0 133.8 9.5 122.1 98
170 - E
439 2-7 130 - S LIFT 2 E 125.0 130.5 9.0 119.7 96
270 - E
150 - E LIFT 2 E 125.0 133.0 9.3 121.6 97
440 2-? 230 - S
230 - S LIFT 2 E 125.0 132.6 9.0 121.6 97
441 2-7 180 - E
442 2-7 220 - S LIFT 2 E 125.0 131.5 9.1 120.5 96
26O - E
463 2-7 500 - S LIFT 3 E 125.0 133.5 9.& 122.0 98
290 - E
400 - S LIFT 3 E 125.0 130.5 9.0 119.? 96
444 2-7 250 - E
300 - S LIFT 3 E 125.0 132.0 9.2 120.8
445 2-7 290 - E
200 - S LIFT 3 E 125.0 132.2 9.3 120.9 97
446 2-7 290 - E
100 - S LIFT 3 E 125.0 134.0 9.0 122.9 98
447 2-7 290 - E
448 2-? 10 - S LIFT 3 E 125.0 133.5 9.1 122.3 98
230 - E
449 2-7 110 - S
240 - E LIFT 3 E 125.0 130.8 9.3 119.6 96
450 2-7 110 - S LIFT 3 E 125.0 132.6 9.5 121.0 97
240 - E
320 - S LIFT 3 E 125.0 133.3 9.1 122.1 98
451 2-7 240 - E
410 - S LIFT 3 E 125.0 132.0 9.5 120.5 96
452 2-7 240 - E
453 2-7 480 - S LIFT 3 E 125.0 134.5 9.6 122.? 98
170 - E
454 2-7 380 - S LIFT 3 E 125.0 132.2 9.0 121.2 97
170 - E
455 2-7 280 - S LIFT 3 E 125.0 133.9 9.8 121.9 98
170 - E
456 2-7 160 - S LIFT 3 E 125.0 131.1 9.0 120.2 96
170 - E
457 2-7 60 - S LIFT 3 E 125.0 132.6 9.5 121.0 97
170 - E
458 2-7 STATION 12+50 GRADE C 98.5 121.& 26.5 96.0 97 STORM
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry welght I E~rracon
Percent Compaction: Based on maximum dry density obtained on
sampte indicated by materia[ mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRIBt/I'ION ~ Date 2-19-94
Architect or Engineer JAMES, HARW-ICK + PARIIqERS, INC.
Contractor BOB MOORE OONSTRUCTION,
Datum SITE DA~T~I
Lift No. Maximum In-Ptace ln-Ptace
Test Date Location or Mt[. Lab Dry ~et Water Dry Percent Comnents
No. E[ev. Mark Density Density Content Density Comp.
459 2-7 STATION 13+00 GRADE C 98.5 119.1 26.0 94.5 96 STORM
460 2-7 STATION 13+50 GRADE C 98.5 121.0 25.8 96.2 98 STORM
461 2-7 STATION 14+00 GRADE C 98.5 118.8 26.0 94.3 96 STORM
462 2-7 STATION 14+50 GRADE C 98.5 121.3 26.2 96.1 98 STORM
500 - S GRADE E 125.0 131.2 9.1 120.2 96
463 2-8 280 - S
400 - S GRADE E 125.0 133.5 9.3 122.1 98
464 2-8 280 - E
465 2-8 300 - S GRADE E 125.0 131.8 9.0 120.9 97
280 - E
466 2-8 200 - S GRADE E 125.0 132.5 9.2 121.3 9r
280 - E
467 2-8 100 - S GRADE E 125.0 133.9 9.4 122.3 98
280 - E
468 2-8 10 - S GRADE E 125.0 131.6 9.1 120.6 96
230 - E
469 2-8 110 - S GRADE E 125.0 133.0 9.0 122.0 98
230 - E
210 - S GRADE E 125.0 132.5 9.4 121.1
470 2-8 230 - E
471 2-8 310 - S GRADE E 125.0 131.6 9.1 120.6 96
230 - E
472 2-8 410 - S GRADE E 125.0 134.0 9.5 122.3 98
230 - E
500 - S GRADE E 125.0 133.5 9.5 121.9 98
47'5 2-8 170 - E
474 2-8 390 - S GRADE E 125.0 132.6 9.1 121.5 97
170 - E
475 2-8 290 - S GRADE E 125.0 131.8 9.0 120.9 97
170 - E
476 2-8 190 - S GRADE E 125.0 134.5 9.8 122.4 98
170 - E
477 2-8 90 - S GRADE E 125.0 132.5 9.2 121.3 97
170 - E
478 2-8 STATION 0+50 LIFT 1 C 98.5 120.6 26.5 95.3 97 STORM
479 2-8 STATION 1+00 LIFT 1 C 98.5 118.5 26.0 94.0 95 STORM
480 2-8 STATION 1+50 LIFT 1 C 98.5 119.0 26.8 93.8 95 STORM
481 2-8 STATION 2+00 LIFT 1 C 98.5 121.0 27.3 95.1 96 STORM
482 2-8 STATION 0+50 GRADE C 98.5 120.1 26.2 95.2 97 STORM
483 2-8 STATION 1+00 GRADE C 98.5 122.9 27.3 96.5 98 STORM
484 2-8 STATION 1+50 GRADE C 98.5 121.4 26.1 96.3 98 STORM
485 2-8 STATION 2+00 GRADE C 98.5 122.5 27.0 96.5 98 STORM
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry weight ] E~rracan
Percent Compaction: Based on maximum dry density obtained on
sample indicated by materia[ mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DI~iTGNS DTSTR~BUTXON ~ Date 2-19-94
Architect or Engineer
Contractor BOB MOOR~ CON~~ON, INC.
Datum SITE DA2~3M
Lift No. Maximc~ In-PLace In-PLace
Teat Date Location or Htr. Lab Dry get Water Ory Percent Conments
No. E[ev. Hark Density Density Content Density Comp.
486 2-12 500 - S
130 - E LIFT 2 E 125.0 131.5 9.4 120.2 96
487 2-12 400 - S
130 - E LIFT 2 E 125.0 133.8 9.5 122.1 98
488 2-12 300 - S LIFT 2 E 125.0 132.0 9.0 121.1 97
130 - E
489 2-12 200 - S
130 - E LIFT 2 E 125.0 134.0 9.3 122.5 98
490 2-12 100 - S LIFT 2 E 125.0 131.7 9.0 120.8 97
130 - E
491 2-12 30 - S
70 - E LIFT 2 E 125.0 133.3 9.6 121.6 97
492 2-12 100 - S LIFT 2 E 125.0 132.9 9.1 121.8 97
30 - E
493 2-12 200 -
30 - E LIFT 2 E 125.0 131.5 9.0 120.6 96
49~ 2-12 300 - S
30 - E LIFT 2 E 125.0 132.0 9.5 120.5 96
495 2-12 400 - S LIFT 2 E 125.0 134.2 9.1 123.0 98
30 - E
496 2-12 500 - $
30 - E LIFT 2 E 125.0 132.6 9.3 121.3 97
497 2-12 450 - S
80 - E LIFT 2 E 125.0 134.2 9.3 122.? 98
498 2-14 190 - S
120 - E LIFT 3 E 125.0 133.9 9.6 122.1 98
499 2-14 120 - S
120 - E LIFT 3 E 125.0 132.1 9.2 120.9 97
500 2-14 30 - S
110 - E LIFT 3 E 125.0 134.0 9.5 122.3 98
501 2-16 20 - S LIFT 3 E 125.0 133.5 9.9 121.4 97
40 - E
502 2-14 90 - S LIFT 3 E 125.0 132.8 9.3 121.5 97
40 - E
503 2-14 160 - S
40 - E LIFT 3 E 125.0 131.6 9.1 120.6 96
504 2-15 230 - S LIFT 3 E 125.0 134.5 9.5 122.8 98
120 - E
505 2-15 300 - S
120 - E LIFT 3 E 125.0 131.0 9.1 120.0 96
506 2-15 400 - S
120 - E LIFT 3 E 125.0 133.8 9.6 122.0 98
507 2-15 480 - S
120 - E LIFT 3 E 125.0 133.0 9.0 122.0 98
508 2-15 480 - S
50 - E LIFT 3 E 125.0 132.r 9.5 121.1 97
509 2-16 60 - s GRADE E 125.0 132.0 9.3 120.7
120 - E
510 2-16 150 - S
120 - E GRADE E 125.0 133.4 9.0 122.3 98
511 2-16 250 - S
120 - E GRADE E 125.0 132.2 9.2 121.0 97
512 2-16 350 - S
120 - E GRADE E 125.0 131.3 9.3 120.1 96
NOTES: Densities sho~: pounds per cubic foot
Water Content: Percent of dry geight ] Ferracan
Percent Compaction: Based on maximum dry density obtained on
sample indicated by materiaL mark.
FIELD COMPACTION REPORT
Job No. 1793~1033
Job Name and Location FI. 3. DESIGNS D~ISTRIBUTIOI~I ~ Date 2-19-94
Architect or Engineer JAMES~ HARW-ICK + P~~ INC.
Contractor BOB FIDORE CEg/~GN, INC.
Datum SITE DATUM
Lift No. Maximum In-Place In-Ptace
Test Date Location or Mt[. Lab Dry Net Water Dry Percent Coe~nents
No. Etev. Mark Oensity Density Content Density Comp.
513 2-16 450 - S GRADE E 125.0 133.6 9.6 121.8 97
120 - E
514 2-16 STATION 28+00 LIFT 1 C 98.5 119.3 26.3 94.5 96 WATER
515 2-16 STATION 28+00 LIFT 2 C 98.5 121.5 27.0 95.7 97 ~ATER
516 2-16 STATION 28+00 GRADE C 98.5 120.0 26.6 94.8 96 WATER
517 2-16 STATION 26+00 LIFT 1 C 98.5 121.3 26.4 96.0 97 WATER
518 2-16 STATION 26+00 LIFT 2 C 98.5 123.0 26.0 97.6 99 WATER
519 2-16 STATION 26+00 GRADE C 98.5 122.4 26.5 96.8 98 WATER
520 2-17 500 - S
70 - E LIFT 3 E 125.0 133.6 9.6 121.8
521 2-17 400 - S
70 - E LIFT 3 E 125.0 132.2 9.2 121.0 97
522 2-17 300 - S LIFT 3 E 125.0 132.0 9.3 120.7
70 - E
523 2-17 200 - S
70 - E LIFT 3 E 125.0 133.3 9.5 121.7 97
524 2-17 100 - s LIFT 3 E 125.0 132.8 9.2 121.6 97
70 - E
525 2-17 20 - S LIFT 3 E 125.0 134.9 9.7 122.9 98
40 - E
526 2-17 100 - S
10 - E LIFT 3 E 125.0 132.5 9.4 121.1
527 2-17 200 - S LIFT 3 E 125.0 133.0 9.1 121.9 98
10 - E
528 2-17 300 - S LIFT 3 E 125.0 132.6 9.4 121.2 97
10 - E
529 2-17 400 - S LIFT 3 E 125.0 133.0 9.0 122.0 98
20 - E
530 2-17 500 - S
10 - E LIFT 3 E 125.0 132.9 9.4 121.4 97
531 2-19 500 - S GRADE E 125.0 132.8 9.2 121.6
70 - E
532 2-19 400 - S GRADE E 125.0 133.0 9.1 121.9 98
70 - E
533 2-19 300 - S GRADE E 125.0 133.3 9.5 121.7 97
70 - E
534 2-19 200 - S
70 - E GRADE E 125.0 132.6 9.4 121.2 97
535 2-19 100 - S
70 - E GRADE E 125.0 133.6 9.6 121.8 97
536 2-19 20 - S
40 - E GRADE E 125.0 132.5 9.4 121.1 97
537 2-19 100 - S
10 - E GRADE E 125.0 132.0 9.3 120.7 97
538 2-19 200 - S GRADE E 125.0 132.6 9.4 121.2 97
10 - E
539 2-19 300 - S
10 - E GRADE E 125.0 132.2 9.2 121.0 97
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry ueight ] rerracon
Percent Compaction: Based on maximum dry density obtained on
sampte indicatedbymateriat mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRIBIJI~ON ~ Date 2-19-94
Architect or Engineer __JP241~, ~CK + PARIIqERS, lRqC.
Contractor BOB MOORE CONS2~UCTION, INC.
Datu, n S_ITE DATUM
Lift No. Maximum In-Place In-Ptace
Test Date Location or Hit. Lab Dry Net Water Dry Percent Comments
No. Eiev. Hark Density Density Content Density Comp.
400 - S GRADE E 125.0 133.4 9.5 121.8 97
540 2-19 10 - E
500 - $ GRADE E 125.0 132.0 9.3 120.? 97
541 2-19 10 - E
NOTES: Densities shoun: pounds per cubic foot
14ater Content: Percent of dry ueight ] brracan
Percent Compaction: Based on maxinun dry density obtained on