Loading...
Park West CC(4)-LR 940201 lrerracon CONSULTANTS. INC. -£.=.:71 S:9'~£:"~ =r~e.'-.-~:~ ~ :e :_'-...:7 .-..-': h-:. -.'~.~:!~ .'::~ !' 2'.:: 2.:5-E.~:~:-' : ~, ,£'-' 3e':9c '.',' : "~- PE ,.':.le~e~' E ET. .... a' Es =L _e';. ~ '_':ar' el .--.'ael February 1, 1994 Dupey Management Corporation 9015 Sterling Street Irving, Texas 75063 Attn: Mr. Robert McCann Re: M J Designs Distribution Center Coppell, Texas Job No. 17931033 Dear Mr. McCann: A Terracon Consultants, Inc. representative has continued to perform earthwork observation and testing sen, ices for the referenced project. This report covers the services performed from January 17 to January 29, 1994. Sen, ices provided during this period consisted of performing field density tests on select fill placed in the building area and compacted clay fill placed in the storm sewer excavation on the south side of the project. Results of the field density tests performed during this period along with a standard Proctor tests performed on a sample of select fill. Tests 323-325, 332-340, 346-348, and 364-372 were performed in the storm sewer excavation. The remaining tests were performed on select fill and were referenced to the northwest building corner which was given an assumed station of 0 south and 0 east. Following the precipitation which occurred during the week of January 24, 1994, any wet and soft select fill soils were removed prior to continuing fill placement. Offices of The Terracon Companies, Inc. Geofechnical, Environmental and Materials Engineers ¢-' z. cq.q T..cfic- · .Er' .:.ra2c C-3 ?¢raLl.2- S2' ".g~. :::er'.'~' F' .";c ~ ":~. '3'~e e?' ..0".?' ::" ! · 3,-.'"': ~:: S:? · "T';~' E.l,:3m - ;;;c", ffi S-h~Dma D~a"Cm~ C:; -.;~a I ~',a~ Be ~ ;:'t ¢,'or:" I _:t~" Sat _:~-'e :: :.' O~[llf E~aI~EE~I~6 SI~CE 1~65 Dupey Management Corporation Terracon Job No. 17931033 February 1, 1994 If you have any questions regarding this report or it's attachments, please contact this office. Sincerely, Project Engineer ElC:kms Attachments Copy To: James, Harwick + Partners, Inc. Mr. Mark Wolf Albert Halff & Associates, Inc. Mr. Dennis Chovan Bob Moore Construction, Inc. Mr. Phil Bell City of Coppell Mr. Larry Davis 2 FIELD COMPACTION REPORT JobNo. 17931033 Job Name and Location M.J. DESIGNS DISTRIBUTION CENTER Date 2-2-94 Architect or Engineer JAMES,. HAR~CK + P~, INC. Contractor _BQB FDORE CONSTRUCTION, INC. Datum SITE DATUM Lift No. Maximum In-Place In-Place Test Date Location or Mtl. Lab Dry Wet Water Dry Percent Conments No. Elev. Mark Density Density Content Density Comp. 292 1-17 580 - S 30 - E LIFT 2 E 125.0 133.5 9.5 121.9 98 293 1-17 570 - $ LIFT 2 E 125.0 133.0 9.0 122.0 98 100 - E 294 1-17 560 - S 200 - E LIFT 2 E 125.0 134.4 9.3 122.9 98 295 1-17 580 - S 280 - E LIFT 2 E 125.0 132.7 9.0 121.7 97 296 1-18 280 - S LIFT 2 E 125.0 131.3 9.2 120.2 96 320 - E 297 1-18 280 - S 430 - E LIFT 2 E 125.0 131.0 9.0 120.1 96 298 1-18 280 - S 550 - E LIFT 2 E 125.0 133.5 9.5 121.9 98 299 1-18 220 - S 560 - E LIFT 2 E 125.0 132.0 9.2 120.8 97 300 1-18 220 - S 450 - E LIFT 2 E 125.0 131.7 8.8 121.0 97 301 1-18 220 - S 320 - E LIFT 2 E 125.0 132.4 9.4 121.0 97 302 1-18 170 - S LIFT 2 E 125.0 134.1 9.3 122.6 98 320 - E 303 1-18 170 - S LIFT 2 E 125.0 131.6 8.5 121.2 97 450 - E 304 1-18 170 - S 550 - E LIFT 2 E 125.0 132.5 9.4 121.1 97 305 1-19 180 - $ 30 - E LIFT 2 E 125.0 133.8 9.8 121.8 97 306 1-19 180 - S 420 - E LIFT 2 E 125.0 131.5 9.3 120.3 96 307 1-19 180 - S 550 - E LIFT 2 E 125.0 134.0 9.6 122.2 98 3O8 1-19 80 S 560 - E LIFT 2 E 125.0 133.4 9.3 122.0 98 3O9 1-19 80 - S 440 - E LIFT 2 E 125.0 132.2 9.0 121.2 97 310 1-19 80 - S LIFT 2 E 125.0 133.0 9.0 122.0 98 32O - E 311 1-19 20 - S LIFT 2 E 125.0 134.2 9.6 122.4 98 320 - E 312 1-19 20 - S 440 - E LIFT 2 E 125.0 133.5 9.5 121.9 98 313 1-19 20 - S 550 - E LIFT 2 E 125.0 132.6 9.2 121.4 97 314 1-20 580 - S 320 - E LIFT 3 E 125.0 134.2 9.8 122.2 98 315 1-20 580 - S 420 - E LIFT 3 E 125.0 132.6 9.3 121.3 97 316 1-20 580 - S LIFT 3 E 125.0 133.3 9.5 121.7 97 540 - E 317 1-20 530- $ 560 - E LIFT 3 E 125.0 133.0 9.2 121.7 97 318 1-20 530 - S 470 - E LIFT 3 E 125.0 135.4 9.7 123.4 99 NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry weight I rerracon Percent Coovpaction: Based on maximum dry density obtained on sample indicated by material mark. FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location I~I.3. DESIGNS DISWRII31~ION ~ Date 2-2-94 Architect or Engineer JAMEB, HARgTICK + PARIIxlERS, INC. Contractor BOB I,'ODRE ODNSTRUCWION, INC. Datum SITE DATUM lift No. Maxin~n In-Place In-Place Test Date Location or Mt[. Lab Dry Uet Water Dry Percent Cor~ents No. Ete~.' .... Mark Density Density Content Density Comp. _ ................ 319 1-20 530 - S LIFT 3 E 125.0 132.8 9.3 121.5 97 35O - E 320 1-20 470 - S 320 - E lIFT 3 E 125,0 133.3 9.5 121.7 97 321 1-20 470 - S LIFT 3 E 125.0 134.6 9.2 123.2 99 440 - E 322 1-20 470 - S 550 - E LIFT 3 E 125.0 133.5 9.4 122.0 98 323 1-20 STATION 0+20 FT LIFT 1 C 98.5 119.7 25.2 95.6 97 STORM 324 1-20 STATION 0+40 FT LIFT I C 98.5 121.2 26.0 96.2 98 STORM 325 1-20 STATION 0+40 FT LIFT 1 C 98.5 119.3 25.5 95.1 96 STORM 326 1-21 430 - S LIFT 3 E 125.0 133.0 9.2 121.7 97 32O - E 430 - S LIFT 3 E 125.0 134.6 9.2 123.2 99 327 1-21 440 - E 328 1-21 430 - S LIFT 3 E 125.0 132.7 9.0 121.7 97 55O - E 329 1-21 380 - S 550 - E LIFT 3 E 125.0 134.0 9.5 122.3 98 330 1-21 380 - S 440 - E LIFT 3 E 125.0 133.5 9.3 122.1 98 331 1-21 380 - S LIFT 3 E 125.0 134.5 9.6 122.7 98 340 - E 332 1-21 STATION 0+20 LIFT 2 C 98.5 118.6 25.3 94.7 96 STORM 333 1-21 STATION 0+40 LIFT 2 C 98.5 119.0 25.5 94.8 96 STORM 334 1-21 STATION 0+60 LIFT 2 C 98.5 119.3 26.0 94.7 96 STORM 335 1-21 STATION 0+20 LIFT 3 C 98.5 121.4 25.8 96.5 98 STORM 336 1-21 STATION 0+40 L FT 3 C 98.5 120.1 25.1 96.0 97 STORM 337 1-21 STATION 0+60 L FT 3 C 98.5 119.6 26.0 94.9 96 STORM 338 1-21 STATION 0+20 L FT 4 C 98.5 119.3 26.2 94.5 96 STORM 339 1-21 STATION 0+40 L FT 4 C 98.5 121.1 25.8 96.3 98 STORM 340 1-21 STATION 0+60 L FT 4 C 98.5 119.5 26.1 94.8 96 STORM 341 1-27 580 - S 40 - E L FT 3 E 125.0 133.7 9.8 121.7 97 342 1-27 520 - S 120 - E L FT 3 E 125.0 135.0 10.0 122.7 98 343 1-27 590 - S 190 - E I FT 3 E 125.0 132.5 9.5 121.0 97 344 1-27 530 - S LIFT 3 E 125.0 134.0 9.0 122.9 98 260 - E 345 1-27 590 - S 280 - E LIFT 3 E 125.0 133.5 9.4 122.0 98 NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry weight lbrracan Percent Compaction: Based on maximum dry density obtained on sample indicated by material mark. FIELD COMPACTION REPORT Job No. 17931.033 Job Name and Location }4.J. DESIGNS DISTRIBUTION ~ Date 2-2-94 Architect or Engineer 0'bI4ES, HARNICK + P~, INC. Contractor BOB I~IOORE CONSrIRUCI'ION, INC. Datum SITE DATUM Lift No. Maximum In-Ptace In-Ptace Test Date Location or Ntt. Lab Dry Net Water Dry Percent Comments No. E[ev. Mark Density Density Content Density Comp. 346 1-27 STATION 0+60 LIFT 1 C 98.5 119.3 26.4 94.4 96 STORM 347 1-27 STATION 0+100 LIFT I C 98.5 122.2 25.1 97.7 99 STORM 348 1-27 STATION 1+50 LIFT 1 C 98.5 120.0 25.0 96.0 97 STORM 349 1-28 580 - S 320 - E GRADE E 125.0 134.2 9.5 122.5 98 350 1-28 580 - S 390 - E GRADE E 125.0 135.0 10.0 122.7 98 351 1-28 580 - S GRADE E 125.0 133.5 9.4 122.0 98 450 - E 352 1-28 580 - S 510 - E GRADE E 125.0 133.0 9.2 121.7 97 353 1-28 580 - S 580 - E GRADE E 125.0 134.0 9.0 122.9 98 354 1-28 490 - S 580 - E GRADE E 125.0 133.7 9.8 121.7 97 355 1-28 490 - S GRADE E 125.0 132.6 9.4 121.2 97 510 - E 356 1-28 480 - S 440 - E GRADE E 125.0 132.5 9.5 121.0 97 357 1-28 480 - S GRADE E 125.0 134.0 9.8 122.0 98 350 - E 358 1-28 410 - S 310 - E GRADE E 125.0 133.4 9.9 121.3 97 359 1-28 410 - S 410 - E GRADE E 125.0 134.5 10.2 122.0 98 360 1-28 410 - S 510 - E GRADE E 125.0 132.5 9.5 121.0 97 361 1-28 380 - S 580 - E GRADE E 125.0 134.8 9.3 123.3 99 362 1-28 380 - S 470 - E GRADE E 125.0 133.5 9.4 122.0 98 363 1-28 370 - S 350 - E GRADE E 125.0 133.3 9.0 122.2 98 364 1-28 STATION 0+60 LIFT 2 C 98.5 120.1 27.0 94.6 96 STORM 365 1-28 STATION 1+00 LIFT 2 D 98.5 119.5 26.8 94.2 96 STORM 366 1-28 STATION 1+50 LIFT 2 C 98.5 121.3 26.6 95.8 97 STORM 367 1-28 STATION 0+60 LIFT 3 C 98.5 122.5 25.7 97.5 99 STORM 368 1-28 STATION 1+00 LIFT 3 C 98.5 121.8 26.1 96.6 98 STORM 369 1-28 STATION 1+50 LIFT 3 C 98.5 119.5 26.0 94.8 96 STORM 370 1-28 STATION 0+60 LIFT 4j C 98.5 120.0 27.3 94.3 96 STORM 371 1-28 STATION 1+00 LIFT 4 C 98.5 119.8 26.8 94.5 96 STORM 372 1-28 STATION 1+50 LIFT 4 C 98.5 119.0 26.6 94.0 95 STORM NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry weight ] ~rracan Percent Compaction: Based on maximum dry density obtained on sampte indicated by materiat mark. HELD COMPACTION REPORT Job No. _1.793]_033 Job Name and Location M.J. DESIGNS DISTRIBUTION C~X~fER Date 2-2-94 Architect or Engineer JAMES, HA..q~CK + P~, INC. Contractor BOB MOORE CONSTRUCTION,. INC. Datum SITE DATUM Lift No. Maximum In-Ptace In-Ptace Test Date Location or Ntt. Lab Dry get Water Dry Percent Comments ~o. Etev. Mark Density_ Density Content Density Comp. 373 1-29 340 -S GRADE E 125.0 133.6 9.5 122.0 98 310 - E 374 1-29 290 - S GRADE E 125.0 131.0 9.2 119.9 96 380 - E 375 1-29 340 - S 450 - E GRADE E 125.0 134.1 9.5 122.4 98 376 1-29 280 - S GRADE E 125.0 132.4 9.2 121.2 97 520 - E 377 1-29 330 - $ GRADE E 125.0 133.5 9.3 122.1 98 580 - E NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry weight 1 l'erracon Percent Compaction: Based on maximc~n dry density obtained on sample indicated by material mark. · ll'err can 135 ,  \ MOISTURE-DENSITY RELATIONSHIP Job No. 17931033 Date 1/2119~1 13o ~ ~ Project MJ DESIGNS DISTRIBUTION CENTER - COPPELL. TEXAS ~ Source of Material OFF SITE-FORT WORTH 125 ~, Description of Material REDDISH TAN CI.AYEY SAND 120 ~ Material Designation F Test Method ASTM D-698 {METllOD A) 115 ~ TEST RESISTS o -- Maximum Dry Densily 117.0 PCF o Optimum Water Content 13.5 % .9. 11o ~ o ATTERBERG LIMITS a. ~05 LL PL PI -o 25 14 11 o '-' CURVES OF 100% SATURATION I00 FOR SPECIFIC GRAVITY EQUAL TO: H -- 2.80 -- 2.70 >- 95 n. -- 2.60 90 85 80 75 0 5 10 15 20 25 30 35 40 45 I41~TER CONTENT (Percent Drg Weight)