Park West CC(4)-LR 940104 'l rracon CONSULTANTS. INC. .~.~.~ /..- ~ ~.~ ......:.~. ~.~ .':: January 4, 1994 Dupey Management Corporation 9015 Sterling Street Irving, Texas 75063 Attn: Mr. Robert McCann Re: M J Designs Distribution Center Coppell, Texas Job No. 17931033 Dear Mr. McCann' As requested, a representative of Terracon Consultants, Inc. performed earthwork observation and testing services for the referenced project. This report covers the services performed from Dece~nber 16 to December 31, 1993. Services provided during this period consisted of performing field density tests on compacted clay fill in the parking lot, and observing the water injection in the building area. The moisture evaluations for the water injection will be transmitted as results become available. On-site clay fill was placed in the parking lot area on the north side of the building to an elevation of about final subgrade. Based on our Subsurface Exploration Report (see Terracon Report No. 1793507{3, dated October 8, 1993), fill placed below parking areas is to be compacted to at least 95% of it's maximum standard Proctor dry density (ASTM D-698). Results of the field density tests are attached. Tests 138 to 167 were performed directly north of the building and tests 168 to 177 were performed northwest and northeast of the building. The tests were referenced to the northeast building corner which was given an assumed station of 0 north and 0 Offices of The Terracon Companies, Inc. Geolechnical, Environmental and Materials Engineers '-,c5- BDc~rgto~.C"cagc Fog< Islaqc I io,,..e Cecar Ua s Seda- Uaccs. Bare"cc-: E.~s [.-'c qe5 ~:9r~ _.a~e Kaqg~S ~e-exa. ~::-ek~ W 2- ts I L' r"-esc:a' SI ~at I t,.tissc.r ' <a~sas ,Si:~- I '4eg-as.~a- L qcc - :,q~a"e QUALITY ENGINEESING SINCE 1965 Dnpey Management Corporation Terracon Job No. 17931033 January 4, 1994 If you have any questions regarding this report, please do not hesitate to contact this office. Sincerely, Project Engineer EJC:kms Attach ments Copy To: James, Harwick + Partners, Inc. Mr. Mark Wolf Albert Halff & Associates, Inc. Mr. Dennis Chovan Bob Moore Construction, Inc. Mr. Phil Bell City of Coppell Mr. Larry Davis FIELD COMPACTION REPORT Job No. 17931033 Job Name and Location M.J. DESIGNS DISWRIBUTION CElqTER Date 12-29-93 Architect or Engineer J/LIVIF_B, HAR~CK + P~, INC. Contractor BOB I~OORE OONS'TRUCI'ION, INC. Datum SITE DArlUlVl i Lift No. Haximum In-Ptace In-Ptace Test I Date i Location or Ht[. Lab Dry Wet Water Dry PercentI Comments ~o. -4 Etev. Hark Density Density Content Density Comp.' _.. 138 12-16 / 25 N, 600 W LIFT 1 C 98.5 120.3 25.6 95.8 97 N. PARKING 139 , 12-16 50 N, 480 W LIFT 1 C 98.5 119.5 26.0 94.8 96 N. PARKING 140 i 12-16 , 100 N, 250 W LIFT 1 C 98.5 119.1 25.0 95.3 97 N. PARKING 1--~41 I ........... ~ ..... 12-16 : 65 N, 200 W LIFT 1 C 98.5 119.6 25.5 95.3 97 N. PARKING 142 12-16 20 N, 50 ~ LIFT 1 C 98.5 118.9 25.8 94.5 96 N. PARKING 143 12-16 95 N, 20 ~ LIFT 2 C 98.5 119.6 25.4 95.4 97 N. PARKING 144 I 12-16 65 N, 280 W LIFT 2 C 98.5 120.4 25.0 96.3 98 N. PARKING 145 12-16 20 N, 300 W LIFT 2 C 98.5 119.2 25.5 95.0 96 N. PARKING 146 ! 12-16 70 N, 500 ~ LIFT 2 C 98.5 120.7 26.0 95.8 97 N. PARKING 147 i' 12-16 85 N, 600 W LIFT 21i C 98.5 119.2 25.? 94.8 96 N. PARKING 148 12-16 35 N, 550 W LIFT 3I C 98.5 118.7 25.0 95.0 I 96 N. PARKING 149 12-16 55 N, 300 ~ LIFT 3 C 98.5 118.5 25.0 94.8 ~ 96 N. PARKING 150 12-16 85 N, 450 N LIFT 3 C 98.5 119.3 25.5 95.1 96 N. PARKING 151 12-16 80 N, 150 ~ LIFT 31 C 98.5 119.5 24.8 95.8 97 N. PARKING I I 152 12-16 140 N, 120 W LIFT 3i C 98.5 119.0 25.3 95.0 96 N. PARKING 153 12-17 i 24 N, 550 ~ LIFT 4I B 103.5 123.6 23.0 100.4 ! 97 N. PARKING i 154 12-17 25 N, 500 W LIFT 4i B 103.5 123.8 22.0 101.4 i 98 N. PARKING 155 12-17 90 N, 300 ~ LIFT 41 B 103.5 124.3 23.0 101.0 i 98 N. PARKING 156 ! 12-17 55 N~ 100 W LIFT 4 B 103.5 124.? 27.4 97.9 95 N. PARKING 157 12-17 15 N, 50 ~ LIFT 4 B 103.5 125.0 24.0 100.8 97 N. PARKING 158 12-17 30 N~ 45 N LIFT 5 C 98.5 119.3 2?.2 93.8 95 N. PARKING 159 12-17 70 No 350 N LIFT 5 C 98.5 118.9 2?.4 93.3 95 N. PARKING 160 12-17 100 N, 150 W LIFT 5) C 98.5 120.3 25.0 96.2 98 N. PARKING 161 12-17 30 N, 200 g LIFT 5 C 98.5 119.7 28.0 93.5 95 N. PARKING 162 12-17 15 N, 300 g LIFT 5' C 98.5 119.9 26.8 94.6 96 N. PARKING 163 12-17 45 N, 600 W LIFT 6 C 98.5 118.4 26.6 93.5 95 I N. PARKING 164 12-17 i 85 N, 550 W LIFT 6 C 98.5 J 118.9 25.5 94.7 96 N. PARKING _z_ NOTES: Densities shown: pounds per cubic foot Water Content: Percent of dry weight I E~rracon Percent Compaction: Based on maximum dry density obtained on sample indicated by materia[ mark. FIELD COMPACTION REPORT Job No. _1..7_.9_3_1__0__3__3_ .......... Job Name fi,id Location M.J. DESIGNS DISTRIBUTION CI~XlTER Date 12-29-93 Architect or Engineer __J~_~___HARWICK + PA.RIIqERS, INC. Contractor _BOB lvEIORE CONSTRUCTION, INC ....... Datmn SITE DATL~4 LiftNo.I Maximum ] In-PLace In-PLace Test Date Location or I Htr. Lab Dry Wet Uater Dry Percent Comments .... rio. _ Etev. I Mark Density Density Content Density Comp. 165 12-17 90 N, 300 W LIFT 6 C 98.5 i 120.1 27.7 94.0 95 N. PARKING 166 12-17 60 N, 250 W LIFT 6 C 98.5 119.6 2?.3 94.0 95 N. PARKING 167 I 12-17 40 N, 50 N LIFT 6 C 98.5 118.5 26.0 94.0 95 N. PARKING ~6~ ii 12-27 NW PARKING ,i LIFT 1 C 98.5 119.5 28.2 93.2 95 169 i 12-27 NW PARKING LIFT 1 C 98.5 119.1 I 26.0 94.5 96 170 12-27 INW PARKING LIFT 1 C 98.5 120.0 I 25.0 96.0 97 171 12-27 i NN PARKING i LIFT 1 C 98.5 119.6 25.3 95.5 97 172 12-27 I N~ PARKING I LIFT 1 C 98.5 119.0 26.0 94.4 96 173 12-31 NE PARKING LIFT 1 C 98.5 120.4 26.0 95.6 97 174 12'31 NE PARKING LiFT 1 C 98.5 119.? 25.0 95.8 175 12-31 NE PARKING LIFT 1 C 98.5 120.5 25.4 96.1 98 176 12-31 NE PARKING LIFT 1 C 98.5 120.2 24.4 96.6 98 177 12-31 NE PARKING LIFT 1 C 98.5 120.8 26.0 95.9 NOIE$: Densities shown: pounds per cubic foot Water Content: Percent of dry weight 1 E~rracon Percent Compaction: Based on maximum dry density obtained on sampte indicated by material mark.