December 20, 1993
Dupey Management Corporation
9015 Sterling Street
Irving, Texas 75063
Attn: Mr. Robert McCann Re: M J Designs Distribution Center
Coppell, Texas
Job No. 17931033
Dear Mr. McCann:
As requested, a representative of Terracon Consultants, Inc. performed earthwork observation
and testing services for the referenced project. This report covers the services performed from
Decelnber 1 to December 15, 1993. Services provided during this period consisted of observing
stripping operations and performing field density tests, using a nuclear density gauge, on
compacted clay fill.
On December 1, 1993 the Distribution Center stripping operations were observed in the building
pad area, including the drainage ditch located along the east side of the Phase 1 construction.
Vegetation and topsoil removed from the building pad area was placed east of the proposed
construction. On-site clay fill was then placed in the drainage ditch and on the north side of the
building to an elevation of about 3 feet below final subgrade. Based on our Subsurface
Exploration Report (see Terracon Report No. 17935076, dated October 8, 1993), clay fill is to
be compacted at a density between 92 and 96% of it's maximum standard Proctor dry density
(ASTM D-698) at a moisture content at least 3% above it's optimum.
Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers
.~r.zoqa ~.:csor · C¢.oradc Coor~do Spr;'~§S. Denver F: Cc I-:,s, G-eeley. ~c.q.q:'"¢:~ · ,dado ~o,$e · ,h rois. Blcom ~.~:cn.
C"'ca§c-. -'q. oc.~ 's'a:~d · Iowa. Ccaar FA, S Ceda' P. aoos Da,er, po-i Des Moi'~es S:c'm LaKe · Kansas Leqex8. TopeKa.
W ch la · M ':~eso:a. S: Pau' · M~ssocr' Kansas C,W · Neu-as,<a. L qcol". Oma-a · Nevada. Las Vegas
· C-: ahoma On.aroma Ci;y. Td'sa · Texas: Da!:as Foal Wot:" · U:a" Sa!t ~a,<e C:ty · Wycr": qg. Cheyep-e
QUALITY ENGINEERING SINCE 1965
Dupey Management Corporation Terracon
Job No. 17931033
December 29, 1993
Results of the field density tests along with three standard Proctor tests are attached. Tests 1
to 40 were perlbrmed in the drainage ditch and tests 41 to 137 were performed in the building
area. Test 41 to 137 were referenced to the southeast building corner which was given an
assumed station of 0 north and 0 west.
If you have any questions regarding this report or in need of any further services, please do not
hesitate to contact this office.
Sincerely,
C'E~ic ~'ela~,, P-(E. Clement B. Bommarito, P.E.
Project Engineer Office Manager
EJC:CBB:kms
Attachments
Copy To: James, Harwick + Partners, Inc.
Mr. Mark Wolf
Albert Halff & Associates, Inc.
Mr. Dennis Chovan
Bob Moore Construction, Inc.
Mr. Phil Bell
City of Coppell
Mr. Larry Davis
2
FIELD COMPACTION REPORT
Job No. _17931033 _
Job Name and Location M.J. DESIGNS DISTRIBUTION ~ Date 12-15-93
Architect or Engineer JAMES, HARI~CK + P~, INC.
Contractor BOB___MQORE CONSTRUCTION, INC.
Method of Density Measurement Datum SITE DATtl~I
I 'Lift No. Haximum In-PLace I In-PLace
Test Date Location or Htr. Lab Dry Wet Water Dry Percent Comments
No. Etev. Hark Density Density Content Density Comp.
1 12-6 50 FT NORTH OF LIFT 1 A 94.5 112.7 29.8 86.8 92 DRAINAGE
SOUTH END DITCH
2 12-6 100 FT NORTH LIFT 1 A 94.5 113.3 28.0 88.5 94 DRAINAGE
SOUTH END : DITCH
3 12-6 150 FT NORTH OF LIFT 1 A 94.5 113.8 29.6 87.8 93 DRAINAGE
SOUTH END DITCH
4 12-6 200 FT NORTH OF LIFT 1 A 94.5 114.6 28.9 88.9 94 DRAINAGE
SOUTH END DITCH
5 12-6 250 FT NORTH OF LIFT 1 A 94.5 113.4 29.2 87.8 93 DRAINAGE
SOUTH END DITCH
6 12-7 50 FT NORTH OF LIFT 2 A 94.5 114.4 28.0 89.4 95 DRAINAGE
SOUTH END DITCH
7 12-7 100 FT NORTH OF LIFT 2 A 94.5 113.6 28.1 88.7 94 DRAINAGE
SOUTH END DITCH
8 12-7 150 FT NORTH OF LIFT 2 A 94.5 113.6 28.0 88.8 94 DRAINAGE
SOUTH END DITCH
9 12-7 200 FT NORTH OF LIFT 2 A 94.5 112.9 28.0 88.2 93 DRAINAGE
SOUTH END DITCH
10 12-7 250 FT NORTH OF LIFT 2 A 94.5 113.2 28.5 88.1 93 DRAINAGE
SOUTH END DITCH
11 12-7 50 FT NORTH OF LIFT 3 A 94.5 115.0 29.6 88.7 94 DRAINAGE
SOUTH END DITCH
12 12-7 100 FT NORTH OF LIFT 3 A 94.5 113.7 28.8 88.3 93 DRAINAGE
SOUTH END DITCH
13 12-7 150 FT NORTH OF LIFT 3 A 94.5 113.8 28.0 88.9 94 DRAINAGE
SOUTH END DITCH
14 12-7 200 FT NORTH OF LIFT 3 A 94.5 114.5 29.3 88.6 94 DRAINAGE
SOUTH END DITCH
15 12-7 250 FT NORTH OF LIFT 3 A 94.5 114.2 28.5 88.9 94 DRAINAGE
SOUTH END DITCH
16 12-7 50 FT NORTH OF DRAINAGE
SOUTH END LIFT 4 A 94.5 114.6 28.9 88.9 94 DITCH
17 12-7 100 FT NORTH OF LIFT 4 A 94.5 113.3 28.8 88.0 93 DRAINAGE
SOUTH END DITCH
18 12-7 150 FT NORTH OF LIFT 4 A 94.5 113.8 29.6 87.8 93 DRAINAGE
SOUTH END DITCH
19 12-7 200 FT NORTH OF LIFT 4 A 94.5 114.1 29.0 88.4 94 DRAINAGE
SOUTH END DITCH
20 12-7 250 FT NORTH OF LIFT 4 A 94.5 114.2 28.6 88.8 94 DRAINAGE
SOUTH END DITCH
21 12-7 50 FT NORTH OF LIFT 5 A 94.5 113.7 29.3 87.9 93 DRAINAGE
SOUTH END DITCH
22 12.7 100 FT NORTH OF LIFT 5 A 94.5 112.4 29.0 87.1 92 DRAINAGE
SOUTH END DITCH
23 12-7 150 FT NORTH OF LIFT 5 A 94,5 114.8 28.0 89.7 95 DRAINAGE
SOUTH END DITCH
24 12-7 200 FT NORTH OF LIFT 5 A 94.5 113.9 28.8 88.4 94 DRAINAGE
SOUTH END DITCH
25 12-7 250 FT NORTH OF LIFT 5 A 94.5 113.5 29.6 87.6 93 DRAINAGE
SOUTH END DITCH
26 12-8 50 FT NORTH OF LIFT 6 A 94.5 113.8 29.2 88.1 93 DRAINAGE
SOUTH END DITCH
27 12-8 100 FT NORTH OF LIFT 6 A 94.5 113.2 28.6 88.0 93 DRAINAGE
SOUTH END DITCH
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry weight I rerracon
Percent Compaction: Based on maximum dry density obtained on
sample indicated by material mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DE. SIGNS DISTR~BU~IC~ ~ Date 12-15-93
Architect or Engineer J/LMF~t H/LRg~CK + PA.RTNIgRS, ~'qC.
Contractor ...... 13OB lvlOORE O01qSTRUC~IOlq, la'qt.
Method of Density Measurement Dalum SIT~: DATUlVl
Lift No. Haximum In-Ptace In-Place
Test Date Location or Mt[. Lab Dry Net Nater Dry Percent Comments
No. Etev. Hark Density Density Content Density Comp.
28 12-8 150 FT NORTH OF DRAINAGE
SOUTH END LIFT 6 A 94.5 114.8 28.2 89.5 95 DITCH
29 12-8 200 FT NORTH OF DRAINAGE
SOUTH END LIFT 6 A 94.5 113.6 28.6 88.3 93 DITCH
30 12-8 250 FT NORTH OF LIFT 6 A 94.5 114.4 30.1 87.9 93 DRAINAGE
SOUTH END DITCH
31 12-8 EAST BLD. LINE LIFT 7 A 94.5 113.7 28.6 88.4 94 DRAINAGE
20 FT WEST DITCH
32 12-8 EAST BLD. LINE LIFT 7 A 94.5 115.6 29.6 89.2 94 DRAINAGE
40 FT NEST DITCH
33 ~ 12-8 EAST BLD. LINE DRAINAGE
80 FT NEST LIFT 7 A 94.5 113.5 29.6 87.6 93 DITCH
34 12-8 EAST BLD. LINE LIFT 7 A 94.5 114.3 30.2 87.8 93 DRAINAGE
20 FT WEST DITCH
35 12-8 EAST BLD. LINE LIFT 7 A 94.5 114.8 29.6 88.6 94 DRAINAGE
40 FT NEST DITCH
36 12-8 50 FT NORTH OF DRAINAGE
SOUTH END LIFT 8 A 94.5 114.7 28.8 89.1 94 DITCH
37 12-8 100 FT NORTH OF LIFT 8 A 94.5 114.4 29.5 88.3 93 DRAINAGE
SOUTH END DITCH
38 12-8 150 FT NORTH OF DRAINAGE
SOUTH END LIFT 8 A 94.5 [13.8 29.2 88.1 93 DITCH
39 12-8 200 FT NORTH OF DRAINAGE
SOUTH END LIFT 8 A 94.5 114.6 30.3 88.0 93 DITCH
40 12-8 250 FT NORTH OF DRAINAGE
SOUTH END LIFT 8 A 94.5 113.9 29.8 87.8 93 DITCH
41 12-9 25 N, 25 g LIFT 1 A 94.5 113.9 29.4 88.0 93
42 12-9 125 N, 60 N LIFT 1 A 94.5 114.2 30.2 87.7 93
43 12-9 300 N, 100 ~ LIFT 1 A 94.5 113.5 29.1 87.9 93
.... 44 12-9 400 N, 70 N I LIFT 1 A 94.5 113.5 29.5 87.6 93
45 12-9 620 N, 25 N ~ LIFT 1 A 94.5 113.3 29.6 87.4 93
46 12-9 30 N, 100 N ! LIFT 2 A 94.5 114.? 29.2 88.8 94
47 12-9 175 N, 50 N LIFT 2 A 94.5 114.4 29.5 88.3 93
48 12-9 290 N, 10 N LIFT 2 A 94.5 113.9 29.8 87.8 93
49 12-9 450 N, 60 N LIFT 2 A 94.5 114.4 29.4 88.4 94
50 12-9 610 N, 100 N LIFT 2 A 94.5 115.3 29.5 89.0 94
51 12-9 70 N, 50 N LIFT 3 C 98.5 119.3 29.2 92.3 94
52 12-9 170 N, 25 N LIFT 3 C 98.5 120.2 29.6 92.7 94
53 12-9 325 N, 75 N LIFT 3 C 98.5 118.8 29.0 92.1 93
54 12-9 420 N, 30 N LIFT 3 C 98.5 119.5 28.4 93.1 94
NOTES: Densities shown: pounds per cubic foot
Nater Content: Percent of dry weight 1 Ferracon
Percent Com4~action: Based on maximum dry density obtained on
sample indicated by materiat mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRIBUTION ~ Date 12-15-93
Architect or Engineer JAMES, HARW'ICK + PARI~IERS, INC.
Contractor BOB MOORE CONSTRUCTION, INC.
Method of Density Measurement Datum SITE DATUM
Lift No. Maximum ln-Ptace In-Ptace
Test Date Location or Mt[. Lab Dry Uet gater Dry Percent Comments
No. E[ev. Mark Density Density Content Density Comp.
55 12-9 600 N, 60 W i LIFT 3 C 98.5 120.5 28.1 94.1 95
56 12-9 20 N, 50 W LIFT 4 ¢ 98.5 119.6 28.5 93.1 94
57 12-9 120 N, 90 W LIFT 4 C 98.5 118.5 29.0 91.9 93
58 12-9 270 N, 50 W LIFT 4 C 98.5 119.5 28.4 93.1 94
59 12-9 370 N, 60 W LIFT 4 C 98.5 119.8 28.3 93.4 95
60 12-9 500 N, 25 W LIFT 4 C 98.5 119.9 28.1 93.6 95
61 12-10 220 N, 120 W LIFT 1 C 98.5 119.6 28.3 93.2 95
62 12-10 250 N, 140 W LIFT 1 C 98.5 119.1 29.5 92.0 93
63 12-10 300 N, 125 W LIFT 1 C 98.5 118.6 28.8 92.1 93
64 12-I0 350 N, 140 W LIFT 1 C 98.5 119.3 29.3 92.3 94
65 12-10 375 N, 140 W LIFT 1 C 98.5 118.5 29.0 91.9 93
66 12-10 425 N, 125 W LIFT 2 C 98.5 118.8 28.5 92.5 94
67 12-10 475 N, 110 W LIFT 2 C 98.5 119.3 29.2 92.3 94
68 12-10 500 N, 150 ~ LIFT 2 C 98.5 119.3 29.0 92.5 94
69 12-10 550 N, 130 W I LIFT 2 C 98.5 118.? 29.4 91.7 93
?0 12-10 600 N, 100 W LIFT 21 c 98.5 119.2 28.8 92.5 94
71 12-10 250 N, 170 ~ LIFT 1 C 98.5 119.5 28.2 93.2 95
72 i 12-10 350 N, 200 g LIFT 1 C 98.5 118.9 28.2 92.7 94
73 12-10 425 N, 170 W LIFT 1 C 98.5 120.1 29.6 92.7 94
74 12-10 550 N, 160 W LIFT 1 C 98.5 119.3 29.0 92.5 94
75 12-10 620 N, 190 W LIFT 1 C 98.5 119.8 28.? 93.1 94
76 12-10 220 N, 180 W LIFT 2 C 98.5 118.? 29.5 91.7 93
7? 12-10 350 N, 175 g LIFT 2 C 98.5 119.5 28.9 92.7 94
78 12-10 440 N, 170 W LIFT 2 C 98.5 119.0 29.3 92.0 93
79 12-10 510 N, 180 9 LIFT 2 C 98.5 119.6 29.6 92.3 94
80 12-10 630 N, 170 W LIFT 2 C 98.5 119.4 29.2 92.4 94
81 12-10 280 N, 150 W LIFT 3 C 98.5 118.8 28.5 92.5 94
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry weight 1Ferracan
Percent Compaction: Based on maximum dry density obtained on
sample indicated by material mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DE. SIGNS DISTRIBUTION CI~XlTER Date 12-15-93
Architect or Engineer JAI~S, ~CK + PARTRERS, ]~lC.
Contractor BOB MOORE OONSTRUCTION, INC.
Method of Density Measure~nent Datum SITE DATUIVl
Lift No. Haximum ln-Ptace In-Ptace ]
Test Date Location or Htr. Lab Dry Wet Water Dry I Percent Conments
No. Etev. Mark Density Density Content Density Comp.
82 12-10 400 N, 100 W ] LIFT 3 C 98.5 119.3 29.0 92.5 94
83 12-10 430 N, 140 W LIFT 3 C 98.5 119.5 28.2 93.2 95
84 12-10 525 N, 120 W LIFT 3 C 98.5 118.6 28.8 92.1 93
85 12-10 600 N, 150 W LIFT 3 C 98.5 119.2 28.8 92.5 94
86 , 12-11 250 N, 190 W LIFT 3 C 98.5 119.3 29.0 92.5 94
87 12-11 350 N, 175 W LIFT 3 C 98.5 119.1 29.5 92.0 93
88 12-11 420 #, 175 W LIFT 3 C 98.5 118.7 29.5 91.7 93
89 12-11 500 N, 180 W LIFT 3 C 98.5 120.5 28.9 93.5 95
90 12-11 500 N, 200 W LIFT 3 C 98.5 118.9 28.2 92.7 94
91 12-11 230 N, 120 W LIFT 4 C 98.5 120.1 29.6 92.7 94
92 12-11 310 N, 140 W LIFT 4 C 98.5 118.8 28.5 92.5 94
93 12-11 400 N, 125 W LIFT 4 C 98.5 119.8 28.? 93.1 94
94 12-11 510 N, 125 W LIFT 4 C 98.5 118.5 29.0 91.9 93
95 12-11 610 N, 150 W LIFT 4 C 98.5 119.4 29.2 92.4 94
96 12-11 250 N, 160 W LIFT 4 C 98.5 118.2 28.3 92.1 94
97 12-11 380 N, 190 W J LIFT 4 C 98.5 118.1 28.0 92.3 94
98 12-11 510 N, 180 W LIFT 4 C 98.5 120.3 28.5 93.6 95
99 12-11 590 N, 160 W LIFT 4 C 98.5 119.4 29.3 92.3 94
100 12-11 620 N, 200 W i LIFT 4 C 98.5 118.8 29.0 92.1 93
101 12-11 380 N, 210 W I LIFT 1 C 98.5 118.9 28.2 92.? 94
102 12-11 430 N, 240 W I LIFT 1 C 98.5 118.5 29.0 91.9 93
103 12-11 500 N, 230 W LIFT 1 C 98.5 119.3 29.0 92.5 94
104 12-11 580 N, 220 W LIFT 1 C 98.5 120.1 29.6 92.7 94
105 12-11 630 N, 235 W LIFT 1 C 98.5 119.6 28.3 93.2 95
106 12-12 350 N, 220 W LIFT 2 C 98.5 118.8 28.6 92.4 94
107 12-12 410 N, 240 W LIFT 2 C 98.5 118.5 29.2 91.? 93
108 12-12 480 N, 210 W LIFT 2 C 98.5 119.6 28.4 93.1 95
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry ,eight I brracan
Percent Compaction: Based on maximum dry density obtained on
sample indicated by material mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRXBt~IOH ~ Date 12-15-93
Architect or Engineer J/LIvIE. S, ~CK + P~, ]~IC.
Contractor BOB_..~RE CONSTRUCTION, XNC.
Method of Density Measurement Datum SITE DATUM
I Lift No. Maximum In-Ptace ln-Ptace
Test Date Location or Ht[. Lab Dry Wet Water Dry Percent Comments
No. Etev. Mark Density Density Content Density Comp.
109 12-12 550 N 240 W LIFT 2 C 98.5 118.5 29.4 91.6 93
110 12-12 600 N, 210 W LIFT 2 C 98.5 118.5 29.0 91.9 93
111 12-14 320 N, 250 W LIFT 3 C 98.5 119.8 29.6 92.4 94
112 12-14 380 N, 225 W LIFT 3 C I 98.5 119.3 29.2 92.3 94
113 12-14 460 N, 210 W ' LIFT 3 C 98.5 118.7 29.3 91.8 93
114 12-14 540 N, 225 W LIFT 3 C 98.5 119.4 29.8 92.0 93
115 12-14 620 N, 240 W LIFT 3 C 98.5 119.2 29.6 92.0 93
116 12-14 320 N, 260 N LIFT 1 C 98.5 120.5 29.3 93.2 95
117 12-14 380 N, 270 W LIFT I C 98.5 118.7 29.6 91.6 93
118 12-14 450 N, 280 W LIFT 1 C 98.5 118.5 30.0 91.2 93
119 12-14 520 N, 275 W LIFT 1 C 98.5 119.6 29.3 92.5 94
120 12-14 610 N, 275 W LIFT 1 C 98.5 119.? 29.6 92.4 94
121 12-14 350 N, 300 W LIFT 1 C 98.5 118.5 29.3 91.6 93
122 12-14 400 N, 325 W LIFT 1 C 98.5 120.8 29.7 93.1 95
123 12-14 575 N, 350 W LIFT 1 C 98.5 120.3 30.3 92.3 94
124 12-14 550 N, 325 W LIFT 1 C 98.5 119.6 29.4 92.4 94
125 12-14 620 N, 310 W LIFT 1 C 98.5 119.5 29.8 92.1 93
126 12-15 480 N, 360 N LIFT 1 C 98.5 119.6 29.3 92.5 94
127 12-15 540 N, 390 W LIFT 1 C 98.5 119.9 29.5 92.6 94
128 12-15 610 N, 400 W LIFT 1 C 98.5 118.? 29.4 91.? 93
129 12-15 475 N, 410 W LIFT 1 C 98.5 120.2 30.3 92.2 94
130 12-15 550 N, 425 W LIFT 1 C 98.5 119.3 29.2 92.3 94
131 12-15 610 N, 440 9 LIFT 1 C 98.5 119.6 28.8 92.8 94
132 12'15 460 N, 450 W LIFT 1 C 98.5 119.6 29.9 92.1 93
133 12-15 530 N, 480 W I LIFT 1 C 98.5 120.4 29.8 92.8 94
134 12-15 600 N, 490 W LIFT 1 C 98.5 118.8 30.2 91.2 93
135 12-15 500 N, 510 W LIFT 1 C 98.5 119.3 28.6 92.8 94
NOTES: Densities shown: pounds per cubic foot
Water Content: Percent of dry weight IE~rracan
Percent Co~action: Based on maximum dry density obtained on
sampte indicated by materiat mark.
FIELD COMPACTION REPORT
Job No. 17931033
Job Name and Location M.J. DESIGNS DISTRIBUTION ~ Date 12-15-93
Architect or Engineer JAMES, HA.rSqlCK + PARTNERS, INC.
Contractor BOB ~OORE CONSTRUCTION, ~qC.
Method of Density Measurement ........ Datum SITE DATL~I
Lift No. Maximum In-Piece ln-Ptace
Test Date Location or Mt[. Lab Dry Wet Water Dry Percent Correnents
No. E[ev. Hark Density Density Content Density Comp.
136 12-15 550 N, 525 W LIFT 1 C 98.5 119.0 29.2 92.1 94
137 12-15 630 N, 590 W LIFT 1 C 98.5 119.7 29.5 92.4 94
NOTES: Densities shown: pounds per cubic foot ~E~rracan
Water Content: Percent of dry weight
Percent Compaction: Based on maximum dry density obtained on
sample indicated by material mark.
· 'll'erracan
~35 ~, MOISTURE-DENSITY RELATIONSHIP
Job No. 17931033 Date 1219193
~30 \ ~ Project M.I DESIGNS DISTRIBUTION
CENTER - COPPELL. TEXAS
Source of Material ON-SITE
l~.S '~- Description of Material DARK BRO~VN CLAY
\
~20 ~ Material Designation A
Test Method ASTM D-698 {31ETItOD A)
115
\ TEST RF.~ULTS
.4--
oo ~ Maximum Dry Density 94.5 PCF
.0_ 110 ~ Optimum Water Content 25.0 %
"' ATTERBERG LIMITS
a. ~0.~ LL PL PI
-a 75% 25% 50%
o
v CURVES OF 100% SATURATION
100 FOR SPECIFIC GRAVITY EQUAL TO:
H 80
>- 95
85
80
75
0 5 l0 15 20 25 30 35 40 45
WATER CONTENT (Percent Drg Weight)
· ll'err can
,~s \ ~ MOISTURE-DENSITY RELATIONSHIP
Job No. 17931033 Date 1219193
130 \ ~ Project MJ DESIGNS DISTRIBUTION
~V CENTER - COPPELL. TEXAS
Source of Material ON-SITE
125
Description of Material BROWN CI.AY, WITH
GRAVEL
Material Designation B
120
Test Method ASTM D-698 ~-IETIIOD A)
115
~ \ TEST RESULTS
oo ~ Maximum Dry Density 103.5 PCF
o I l0 I Optimum Water Content 18.0 %
o ATrERBERG LIMITS
m 105 LL PL
'~ 64% 24% 40%
o
'~' CURVES OF 100% SATURATION
100 FOR SPECIFIC: GRAVITY EQUAL TO:
~ 2.80
tn ~ 2.70
~- 95
tn ~ 2.60
90
85
80
75
0 5 l0 15 20 25 30 35 40 45
14RTER CONTENT (Percent Dry I, leigh'l')
_ ~,
· 'lrerracan
~ ' MOISTURE-DENSITY RELATIONSHIP
Job No. 17931033 Date 1219193
]3o ~. ~ Project MJ DESIGNS DISTRIBUTION
,~~~ CENTER - COPPELL, TEXAS
Source of Material ON-SITE
125
Description of Material BROSVN & DARK BROWN
CLAY
120 Material Designation C
Test Method ASTM D-698 (~'IETItOD A)
115
\ TEST RF_~ULTS
oo ~ Maximum Dry Density 98.5 PCF
o I1O ~ Optimum Water Content 22.0 %
o ATTERBERG LIMITS
o_ ]05 LL PL PI
-o 68% 26% 42%
o
"=' CURVES OF 100% SATURATION
100 FOR SPECIFIC GRAVITY EQUAL TO:
>- 95
9o
85
8o
75
0 5 10 15 20 25 30 35 40 45
WATER CONTENT (Percent Dr9 Wei~lhf)