Park West CC(4)-CS 960419Ill · 8616 NORTHWEST PLAZA DRIVE
Halff A ate
S S 0 C 1 S {214I, 739-0094
III FAX,2. ,39-oo9~
ENGINEERS · ARCHITECTS · SCIENTISTS
PLANNERS · SURVEYORS
April 19, 1996
AVO 13447
Michael A. Martin
Engineering Department
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019
Re: Industry Drill Track MJ Designs
Dear Mike:
The Industry Drill Track plans for Park West Commerce Center have been revised as
per your comments. The proposed railroad bridge will be built at the location indicated
in the flood study, prepared by HalffAssociates and submitted to FEMA (Case No. 91-
06-21R), and follow the cross section shown in the model. The precast concrete caps
and girders from the existing railroad bridge will be used on the new bridge.
If you have any questions or require a copy of the hydraulic model along Grapevine
Creek for verification, please do not hesitate to call.
Sincerely,
HALFF ASSOCIATES, INC.
Dennis J. Chovan, P.E.
DALLAS · FORT WORTH · HOUSTON ° ARLINGTON · McALLEN · CHICAGO
TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL · ENVIRONMENTAL ° STRUCTURAL
MECHANICAL · ELECTRICAL · SURVEYING ° GEOGRAPHIC INFORMATION SYSTEMS
ARCHITECTURE · LANDSCAPE ARCHITECTURE ° PLANNING