Loading...
Park West CC(4)-CS 931213 ALBERT H. HALFF ASSOCIATES. INC. " ENGINEERS · SCIENTISTS · SURVEYORS ., DALLAS · ARLINGTON · CHICAGO · FORT WORTH ~' ;~ 'J'~'P.-~',','E..a.T :_,'~T~ DB'-,'-- · Z;:__;-,*-. -3 ~.'-:~ -f?'_:!': December 13, 1993 AVO 13189 City of Coppell Engineering Deparunent 255 Parkway Blvd. Coppell, Texas 75019 ~(~ ~._ Attn: Kenneth M~ Re: (~D...Di~tr~Signs~orporate Headquarteuti.6n Center at Park West ~;an&rce Center Dear Ken: Following are the revisions to the second review for the paving, grading, drainage, and utility plans for MJ Designs new headquarters at Park West Commerce Center; Sheet G-1 Revise parking lot grades north and west of warehouse Sheet STM-2 Lower Storm Sewer Line D Sheet WS-1 Add two (2) 6 inch laterals with fire hydrants (discussed with Troy Glidewell, 12-06-93) Remove 2" copper connection note at Sta 28+85 Sheet SD Remove all Standard construction details I am also including a copy of the pavement recommendations from the geotechnical engineer. Please call if you have any additional comments. Sincerely, ALBERT H. HALFF ASSOCIATES, INC. ._. ,..:. ._ ..// Dennis J. Chovan, P.E.