Loading...
Pecan Hollow-CS 910508 Coppell. Texas 75019 ,~ /¢~----~, The City With A Beautiful Future 214-462-0022 · May 8, 1991 Mr. Doyle Cameron Camero Development 16250 Dallas Parkway, Suite 200 Dallas, TX 75248 Re: Pecan Hollow Final Acceptance Dear Mr. Cameron: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell and the Municipal Utility District. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. Utilities have also been accepted by the Municipal Utility District #1. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (May 8, 1991). Construction Inspector CLD/Bd cc: M. Shohre Danestmand, Acting City Engineer Gary L. Sieb, Director of Planning and Community Services Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Ben dela Cruz, Engineer Technician Ron Davis, J. D. Abrams Construction Jeff Hawkins, M.U.D. Dale Gilreath, Glenn Thurman, Inc. PECFINAL