Loading...
Pecan Hollow-CS 910508 (3) PECAN HOLLOW JOINT VENTUFc~. 16250 Dallas Parkway Suite 200 Dallas, Texas 75248 h'~..j, ' ...... May 8, 1991 .~~~/ Mr. Larry Davis City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: City Acceptance Pecan Hollow Dear Mr. Davis: The f].ushing of the sanitary sewer line is going smoothly and will be completed 5oday. All other items on the punch-lists are complete. We also agree to install traffic buttons on Lodge Road, stripe the temporary asphalt tie-in on Lodge and replace the damaged section of Lodge as soon as the weather permits. We will continue to keep dirt out of the streets and storm drain as it is prudently possible. TuElectric has been notified to go back as soon as the weather permits and dress up all their ditches. We would like to have our acceptance letter for the subdivision as soon as we can and dated as early as possible. Please be assured that we will continue to be cooperative and replace, repair and ~ake care of anything that arises. i~incere 1~,~ i . ' Doyle R. Cameron DRC/ma %