Pecan Hollow-CS 910409 (2)April 9, 1991 Pecan Hollow Addition Punchlist Items to be Completed as per Request Related to Early Release of 8 Lots: - All headers and sawed joint sealant needs to be within 1/8 inch of road surface. - Alley on Dogwood Trail west side of approach replace curb. - Both drop inlet's on Do~wood Trail holding water and need cleaning out. (Concrete and trash) Dogwood Trail, Northside, curb going into pavers need's reworked. Paver corner also reworked (High and low spots) - Pavers need to be 1/8 inch above concrete surface - check all edges. - Install backer rod in areas with gaps 1/2" and larger to a depth of 1" Clean and seal fiber board along Lodge Road back of curb. - 317 Lod§e Road south drive approach, street pavement cracking. - Alley between Dogwood Trail and Lodge Road will have several bird baths at center line. - Grace - at the turn will have bird bath outer radius. - Grade shoulder at the asphalt approach. - Sidewalk on the east side at the Grace alley - remove first panel of sidewalk and repour. - Route and seal all utility cut's made across old part of Lodge Road. - Where does the water go on Lodge Road? What way does the water flow and how does it get off the road. No drop inlets. - Concern about the Dog Ear's at the center line of Lodge Road when freeze/thaw cycle. - Pecan Hollow and Lodge - Manhole needs grout and cleanin§ out. - Manhole between Pecan Hollow and Grace exist. Needs grout and cleaning out. - Manhole at Dogwood Trail needs §rout and cleaning out. - 18" gap where they raised the street. - Clean-out needs plug. (Grace) - Saw cut a control joint at the Grace alley. {See diagram) , If you have any questions, please contact Larry Davis, Construction Inspector at 393-1016. CLD/bd PECAN, TXTLINDA