Pecan Hollow-CS 910402 MEMORANDUM
April 2, 1991
TO: M. Shohre Daneshmand, Acting City Engineer
FROM: Larry Dav~, Construction Inspector
RE: Pecan Hollow
A meeting was held on the above listed project on Tuesday,
April 2, 1991, to discuss the offsite grading along the
north property line of Pecan Hollow. We also discussed
the existing trees adjacent to the same drainage area.
Mr. Doyle Cameron with Camero Development and Mr. Larry Taylor
with Pecan Hollow Development were present at the meeting and
indicated that offsite grading would be completed with nhe
Pecan Hollow Development and a grading plan would be forwarded
to you by April 3, 1991.
Also, forwarded to you will be a landscape plan indicating
protection around the base of the existing trees for fill is
currently being placed.
PECAN HOLLOW JOINT VENTUr~
16250 Dallas Parkway
Dallas, Texas 75248
(214)380-S825
April 2, 1991
Ms. Shohre Daneshmand
Acting City Manager
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019
Re: Pecan Hollow Trees and Grading on North Property Line
Dear Shohre:
We have completed the construction of the pads in Block "C". The pads
have been brought to the FP-464.5.
The neighbors are rightfully concerned about the 3' of fill that we
have placed against some of the trees. This fill will be removed as we cut
the swells between the lots and shape the rear yards.
We are attempting to save trees that are between the pads in the
swells and those that are close to the front and rear of the house. We
have worked with Drees Homes and will coordinate the drainage in order to
save the additional twenty-plus trees. As you know, we had to compact in
lifts over the complete pad to get the compaction with the heavier
equipment. Now, we can clean out around the trees.
The grading of the channel will be as we discussed and previously
documented. On the property adjacent to Pecan Hollow we are sloping the
ditch and the 23' easement on the rear of the lots in Block "C". We also
have permission to grade out the bottom of the ditch. The ditch is
designed to accommodate 1000 CFS and we are putting 50 CFS from Pecan
Hollow into this area. So there is no need to increase the ditch for our
development but we want to clean out the area adjacent to Pecan Hollow to
beautify the area.
We have a meeting with the homeowners Wednesday at 6:00 p.m. and I
will explain the fill operation.
We are complying to all codes and I feel that we will complete the
subdivision in the next few weeks to everyone's satisfaction.
Doyle R. Cameron
DRC/ma
cc: Larry Taylor